Loading...
HomeMy WebLinkAbout06/09/1986 FINANCE COMMITTEE MINUTES June 9, 1986 6:30 p.m. Large Conference Room Members present: Seeber and Miller. Members absent: Chairperson Dowie. The Agenda, as proposed, was approved. The following bids were reviewed for the Police Training Center repair and remodeling: Daniels Home Improvement & Construction Co. Area #1: Enclose and cover five (5) windows on $1,125.00 north wall . Area #2: Insulate wall , metal stud & sheetrock wall . Install suspended ceiling and install window/screens. $1,950.00 Area #3: Install heat runs. $1,250.00 Fereday Heating Co. Area #1: No bid Area #2: No hid. Area #3: Install heat runs. $ 590.00 It was the recommendation of the Police Department to accept the low bids for Area I and Area II of Daniels Home Improvement in the amount of $3,075 and Area III of Fereday Heating Company in the amount of $590. Total costs for repair and remodeling is $3,665. It was moved by Miller, seconded by Seeber that this recommendation be approved. Motion carried. The following bids were reviewed for the repair of the Blower Building Roof at the Water Pollution Control Plant: Bidder Total Bid Chucks Roofing $4,836 Fuller Roofs $4,650 Service Roofing $5,269 It was the recommendation of the Superintendent of the Water Pollution Control Plant to accept the low bid of Fuller Roofs in the amount of $4,650. It was moved by Miller, seconded Seeber that this recommendation be approved. Motion carried. The following bids were reviewed for the asphalt emulsion for recycled asphalt paving mixture: Bidder Total Bid Koch Asphalt Company $21,655.48 Bitucote Products Company $32,752.20 It was the recommendation of the City Engineer to accept the low bid of Koch Asphalt Company. It was moved by Miller, seconded by Seeber that this recommendation be approved. Motion carried. FINANCE COMMITTEE MINUTES PAGE TWO The following bids were reviewed for F.Y. 1986 Dale, Louise, Anita, and Esther Streets curb and gutter repair: Bidder Total Bid B & B Builder's and Supply $2,930.00 Tom Dolan Concrete $5,274.00 Max Bowers Masonry $3,442.75 Concrete Foundations, Inc. $4,160.60 It was the recommendation of the City Engineer to accept the low bid of B & B Builder's and Supply. It was moved by Miller, seconded by Seeber that this recommendation be approved. Motion carried. The request of the City Engineer to seek bid proposals for the lease of a copier for use by the Planning, Engineer, Building and Parks Department was reviewed. It was moved by Miller, seconded by Seeber that authorization be given to solicit bids. Motion carried. The proposed contract with Wayne Claassen for Cursory Appraisal Service in conjunction with the Ansborough Avenue ( Interstate Substitution Project, IX-6615(3)--79-07) was reviewed. The appraisals would be for strip right-of-way and would give the Iowa Department of Transportation and the Federal Highway Administration an estimate of those right-of-way costs. It was moved by Miller, seconded by Seeber that this contract be approved. Motion carried. The request of the Superintendent of Streets for a two-month rental of a pavement joint milling machine was reviewed. The total cost is $6,000 per month. It was moved by Seeber, seconded by Miller that a lease agreement be entered into with Caterpillar for a two-month lease of a pavement ,joint milling machine. Motion carried. The following bids were reviewed for the purchase of a fuel management system: Bidder Total Bid P. E. S. Company $ 8,705.00 Petro $11,124.00 Seneca $12,865.42 Larry Cunningham, Superintendent of the Central Garage, indicated that the only vendor that met the specifications was Seneca and recommended the purchase of this system. It was moved by Seeber, seconded by Miller that authorization be given to the purchase of the fuel management system from Seneca. Motion carried. It was moved by Seeber, seconded by Miller that the bills for payment be recommended to the Council for approval . Motion carried. With no further business before the Committee, the meeting was adjourned. Larry P. Burger Clerk/Auditor