HomeMy WebLinkAboutVieth Construction - CO # 5 - Five Sullivan Bros Plaza Renovation - 9.6.2022tAIA
Change Order
Document G701 ' - 2017
PROJECT: (Norco mrd address)
CIly of Waterloo Sullivan Brothers Plata
Iicttuvaiion, w'alu10o, IA,
OWNER: (Nine and address)
City of Waterloo
715 Muibenv Street
Waterloo, lA 50703
CONTRACT INFORMATION:
Contract Por: General Construction
Project No: 21-25083
Date: February 24, 2022
ARCHITECT: (Name and address.)
I & S Croup, Inc. (ISG)
314 East 4th Street
Waterloo. IA 50703
CHANGE ORDER INFORMATION:
Change Order Number: 005
Date: August I1, 2022
CONTRACTOR: (Nacre and address)
Vieth Constructions Corporation
6419 Nordic Drive
Cedar Falls, IA 50613
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed descriptor: of the change andff applicable, attach or reference sparific exhibits. Also include agreed upon adjustments
attributable to executed Constracrlon Change Directives.)
A. Plt 05; Cost to relocate City filter; remove additional concrete ADD $14,819.10
- Provide & install 12 cowit single ntude fiber from Convention Center to
Library using existing pathway and about 70' new conduit. Both ends of
the fiber will be terminated.
- Provide & install 12 count single rnotie fiber from Convention Center to
traffic signal cabinet on Park and Commercial Street using existing pathway.
Bath ends ol'the fiber will be terminated.
Replace concrete pavement for Tiber placement,
TOTAL ADD $14,819.10
REDUCE REMAINING BALANCE OF EPDXY COATING ALLOWANCE FROM $12,727.39 TO ZERO.
ADD REMAINING BALANCE OF S2,091.71 TO CONTRACT SUM.
The original Contract Sian was
The net change by previously authorized Change Orders
The Contract SUM prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
'I'1te Contract Time will be unchanged by Zero (0) days.
Tlrc new date of Substantial Completion will be September I, 2022 (per Addenda li1).
NOTE: This Change Order does not include adjustments to the Contract Sutn or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which ease a Change Order is executed to supersede the Construction Change Directive.
$ 1492,500.00
$ 0.00
$ 1,692,500.00
$ 2,091 71
$ 1,694,591.71
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
1 & S Group, Inc. (ISG)
ARCHITECT Orin name)
SIGNATURE
Nathan Compton, Architect/Project
Manager
PRINTED NAME AND TITLE
August 11, 2022
DATE
Vieth Construction Corporation
CONTRACTOR (Firm name)
SIGNaTUR7
Tony Vieth, President
PRINTED NAMENAME7 TITLE
City of Waterloo
OWNER (Firm name)
tiro l lah't °s'icneo
SIGNATURE
Quentin Hart, Mayor
P TI5822AME AND TITLE
DATE DATE
AIA Document G701 "--201T. Copyright 0 1979, 1907, 2000., 2001 and 2017 by Ta American Institute of Architects. All rights reserved. The -Americal.
Institute at Areailer s. "AIA, tl'n NA Logo, and -AIA t:oninl ,f 0nctirnen1ri' ill,: re'llsinrarl lirrrlr;lnrn'k3,artrl may not be used without permissicm. This document
was produced by AIA software at 11:06:44 CT on ORt1 I12622 under Order Na.2114332397 which expires on 07/1212023, is not for resale, is licensed for one-
time use only, and may only be used In accordance with Iho AIA Contract Documenlso Torma of Service. To report copyright vitiations, e-mail