Loading...
HomeMy WebLinkAboutVieth Construction - CO # 5 - Five Sullivan Bros Plaza Renovation - 9.6.2022tAIA Change Order Document G701 ' - 2017 PROJECT: (Norco mrd address) CIly of Waterloo Sullivan Brothers Plata Iicttuvaiion, w'alu10o, IA, OWNER: (Nine and address) City of Waterloo 715 Muibenv Street Waterloo, lA 50703 CONTRACT INFORMATION: Contract Por: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Name and address.) I & S Croup, Inc. (ISG) 314 East 4th Street Waterloo. IA 50703 CHANGE ORDER INFORMATION: Change Order Number: 005 Date: August I1, 2022 CONTRACTOR: (Nacre and address) Vieth Constructions Corporation 6419 Nordic Drive Cedar Falls, IA 50613 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed descriptor: of the change andff applicable, attach or reference sparific exhibits. Also include agreed upon adjustments attributable to executed Constracrlon Change Directives.) A. Plt 05; Cost to relocate City filter; remove additional concrete ADD $14,819.10 - Provide & install 12 cowit single ntude fiber from Convention Center to Library using existing pathway and about 70' new conduit. Both ends of the fiber will be terminated. - Provide & install 12 count single rnotie fiber from Convention Center to traffic signal cabinet on Park and Commercial Street using existing pathway. Bath ends ol'the fiber will be terminated. Replace concrete pavement for Tiber placement, TOTAL ADD $14,819.10 REDUCE REMAINING BALANCE OF EPDXY COATING ALLOWANCE FROM $12,727.39 TO ZERO. ADD REMAINING BALANCE OF S2,091.71 TO CONTRACT SUM. The original Contract Sian was The net change by previously authorized Change Orders The Contract SUM prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be 'I'1te Contract Time will be unchanged by Zero (0) days. Tlrc new date of Substantial Completion will be September I, 2022 (per Addenda li1). NOTE: This Change Order does not include adjustments to the Contract Sutn or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which ease a Change Order is executed to supersede the Construction Change Directive. $ 1492,500.00 $ 0.00 $ 1,692,500.00 $ 2,091 71 $ 1,694,591.71 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1 & S Group, Inc. (ISG) ARCHITECT Orin name) SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE August 11, 2022 DATE Vieth Construction Corporation CONTRACTOR (Firm name) SIGNaTUR7 Tony Vieth, President PRINTED NAMENAME7 TITLE City of Waterloo OWNER (Firm name) tiro l lah't °s'icneo SIGNATURE Quentin Hart, Mayor P TI5822AME AND TITLE DATE DATE AIA Document G701 "--201T. Copyright 0 1979, 1907, 2000., 2001 and 2017 by Ta American Institute of Architects. All rights reserved. The -Americal. Institute at Areailer s. "AIA, tl'n NA Logo, and -AIA t:oninl ,f 0nctirnen1ri' ill,: re'llsinrarl lirrrlr;lnrn'k3,artrl may not be used without permissicm. This document was produced by AIA software at 11:06:44 CT on ORt1 I12622 under Order Na.2114332397 which expires on 07/1212023, is not for resale, is licensed for one- time use only, and may only be used In accordance with Iho AIA Contract Documenlso Torma of Service. To report copyright vitiations, e-mail copynght@aia.org. 3B9ADA.3C) User Notes: {