Vieth Construction - CO #6 -5 Bros Plaza Reno - 10.3.2022
Document G701'' Change Order 2017 PROJECT: (Name and address) City of Waterloo Sullivan Carothers Plaza Renovation, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Name and address) I & S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION: Change Order Number: 006 Date: September 20, 2022 CONTRACTOR: (Name and address) Vieth Construction Corporation 6419 Nordic Drive Cedar Falls, IA 50613 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. Cost for four (4) concrete Memorial Pedestals per Alternate No #1 Add $134,000.00 REDUCE SPECIFIED MEMORIAL PEDESTAL ALLOWANCE FROM $134,000.00 TO ZERO. CONTRACT SUM REMAINS UNCHANGED FOR THIS PORTION OF THE CHANGE ORDER. B. PR 05 (Part 2): Cost for conduit lowering change Add $ 6,900.75 TOTAL AMOUNT OF THIS CHANGE ORDER, ADD $6,900.75 TO CONTRACT SUM, The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be September 1, 2022 (per Addenda #1), $ 1,692,500.00 $ 2,091.71 $ 1,694,591.71 $ 6,900.75 $ 1,701,492.46 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & S Group, Inc. (ISG) ARCHITECT (Firer name) SIGNATURE Nathan Compton, Architect/Project Manager Vieth Construction Corporation City of Waterloo CONTRACTOR (Firm name) OWNER (Firm name) SIGNATURE Tony Vieth, President PRINTED NAME AND TITLE PRINTED NAME AND TITLE September 20, 2022 0a/22... DATE DATE DATE �entn hart SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 10/3/2022 AIA Document G701' —2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects; `AIA; the AIA Lego, and "AIA Contract Documents" are registered lraden arks and may not be used without permission. This document was produced by AIA software at 08:52:53 CT on 09/21/2022 under Order No.2114332387 which expires on 07/12/2023, is not for resale, is licensed for one- time use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA45)