8/4/08 649 Agree w/Wayne Claassen Eng-prepare plans for Hydrant Loop Project at Regional Train Ctr($2,000.00)
650 •Preliminarily approving plans-2008 Riverfront Stadium Infield Natural Turf System
651 Set hearing Aug 18, 2008 & taking bids-2008 Riverfront Stadium Infield Natural Turf System
652 Preliminarily approving plans-Asbestos Removal, Rath Administration bldg, Contract 131-AR-09-2-08-GO
653 Set hearing Aug 25,2008 & taking bids-Asbestos Removal,Rath Admin bldg,Contract 131-AR-09-2-08-GO
654 Preliminarily approving specs-Purchase of 1 Current Model Year End Loader
655 Set hearing Aug 18, 2008 & taking bids-Purchase of 1 Current Model Year End Loader
656 Preliminarily approving plans-2008 Stone Replacement for the Waterloo Public Library
657 Set hearing Aug 25, 2008 &taking bids-2008 Stone Replacement for the Waterloo Public Library
658 Installation of 2 flood lights behind 1621 E 4th St& to the east of the driveway of 122 Newell St
659 Set hearing Aug 18, 2008-site plan amend at Ansborough/San Marnan for development of office buildings
8/11/08 660 Bills payment
25
h 661 Grout Museum to hold Brewfest, Sept 27, 2008, Soldier's/Sailor's Park & Cedar Street between W 4th-5th
G 662 Waiver for concrete driveway, David &Terry Roeder, 1200 Baltimore Street
Li/El 663 Noise Ord Variance-Spicoli's, 3555 University Avenue, Aug 16, 2008, band playing in outdoor service area
664 Site plan amend-Moo Social Security office for develop of office bldg at Greyhound Dr&future Athens Dr,
665 Approving Voluntary Transfer of Benefits Policy
666 Approving Smoking Area Application Form
667 Accept of Work-Happel Excavating ($2,290,123.87),FY2007 Prescotts Creek Sanitary Sewer,Contract 703
668 Amend# 1 to Agree w/VJ Eng-dev plats/legals for FY2009 Closure BH Creek RR Crossings, Contract 747
669 Notice Discontinuation Storm Water Discharge-FY2007 Riverwalk Loop Trail E 6th to 18th, Contract 696
670 Notice of Intent for NPDES Coverage w/Natural Resources-FY2007 Riverloop Exposition Plaza, Phase I
671 Agree w/American Red Cross-use Veterans Memorial Hall in case of emergency or disaster
672 Property Access Agree-environ site assessments as part of Brownfields at 415 E 8th, 906 & 926 Franklin
673 Property Access Agree-environ site assessments as part of Brownfields at 216-222 Commercial & parcel
674 Tax exemptions on improvements in CURA-Scott & Connie Petersen, 1045 Fulton Street ($150,000.00)
675 Dev Agree w/Cardinal Construction-develop 14,400 sq ft office bldg in Country Club Business Center
676 Dev Agree w/Cardinal Construction-develop 5,300 & 3,840 sq ft bldgs in Country Club Business Center
677 Variance to requirements of Subdivision Ordinance for Preliminary & Final Plat Greenbelt Centre Plat No 3
678 Preliminary Plat of Greenbelt Centre Plat No 3
679 Final Plat of Greenbelt Centre Plat No 3
680 Final Plat of Country Club Business Center Third Addition
681 1st Amend to Section 108 Loan Guarantee Contract w/HUD-retain funds for reuse/extend withdrawal date
682 Total Acquisition Contract w/Wayne & Joanna Wiltfang for 218-220 W 2nd St &224-226 W 2nd St
683 App for CF Tourism &Visitors Bureau grant-marketing & advertising for Holiday Arts Festival ($2,200.00)
684 Set hearing Aug 25, 2008-purchase of new target system for Police Department Training Center
19
DATE RES. NO. SUBJECT
8/11/08 685 Preliminarily approving plans-FY09 Sidewalk Repair Block Grant Program-Zone 8, Contract 751
686 Set hearing Aug 25, 2008 & taking bids-FY09 Sidewalk Repair Block Grant Program-Zone 8, Contract 751
687 Preliminarily approving plans-Young Arena Message Center
688 Set hearing Aug 25, 2008 & taking bids-Young Arena Message Center
689 Traffic Operations to install temporary No Parking signs on Oleson Rd between Hammond Ave/Bethel St
690 Set hearing Aug 25, 2008-sell & convey for$2.1 million Fire Station #8 to First Equity Acquisitions, LLC
8/18/08 691 Bills payment
TH
692 Waiver for concrete driveway, James & Sandra Ites, 151 Pershing Road
693 YMCA to hold 2008 Together We Play 51K/10K, Sept 20, 2008, route beginning & ending at the YMCA
q'a Sj 694 Confirming approval of plans-2008 Riverfront Stadium Infield Natural Turf System __
134- 695 Ordering construction-2008 Riverfront Stadium Infield Natural Turf System
696 Confirming approval of plans-2008 Swimming Pool Renovations at Gates & Byrnes Pools
697 Ordering construction-2008 Swimming Pool Renovations at Gates & Byrnes Pools
698 ,Confirming approval of specs-Purchase of 1 Current Model Year End Loader
699 Authorizing to proceed-Purchase of 1 Current Model Year End Loader
700 Site plan amend-Country Club Business Center for develop of 14,400 sq ft bldg &four 4,000 sq ft bldgs
701 Agree w/ServiceMaster-restoration services at City Hall, Carnegie Annex, Library, Arts, Riverfront Stadium
702 Tax exemptions on improvements in CURA-Sabid Nadarevic, 1108 Jefferson St ($110,000.00)
703 Addendum to Grade Crossing Surface Repair Agree w/IDOT & Chicago, Central RR-repair Idaho crossing
704 Accept grant from Comm Foundation NE IA-construct 2 tee ball fields at Cedar River Complex ($8,000.00)
705 Additional cost $14,384.00 for engineering svcs w/Snyder&Asso-design intersection Hammond/Ridgeway,
706 Encroach Agree w/David Reynolds-allow shed & proposed garage to encroach easement at 526 Glencoe
707 Develop Agree w/Logan Plaza LLP-renovation of existing Logan Plaza retail center
708 Develop Agree w/Logan Plaza LLP-construction of 7,500 sq ft retail building between car wash & Subway
709 Waive office rent by Twins Sports Group for total of$975.00 for July, Aug, Sept at Riverfront Stadium
710 Preliminary Resolution approving sidewalk improvements-FY 2009 Sidewalk Repair-Zone 8, Contract 746
711 Fixing values of lots-FY 2009 Sidewalk Repair Program-Zone 8, Contract 746
712 Preliminary plat& schedule of assessments-FY 2009 Sidewalk Repair Program-Zone 8, Contract 746
713 Resolution Necessity setting hearing Sept 8, 2008-FY2009 Sidewalk Repair Program-Zone 8,Contract 746
714 Preliminarily approving plans-FY 2009 Sidewalk Repair Program-Zone 8, Contract 746
715 Set hearing Sept 8, 2008 & taking bids-FY 2009 Sidewalk Repair Program-Zone 8, Contract 746
716 Preliminarily approving scope of services, form of contract-Composting Collected Yard Waste
717 Set hearing Sept 2, 2008 & taking bids-Composting Collected Yard Waste
8/25/08 718 Bills payment
719 Pathways Behavioral Services to hold 5th Annual RUN, WALK & ROLL, Oct 25, 2008, 3362 University
,L4720 Waiver for concrete driveway, Michelle Klingfus, 3839 Ranchero Road
..4a
20
DATE RES. NO. SUBJECT
8/25/08 721 Confirming approval of plans-FY 2009 Sidewalk Repair Program-Zone 8, Contract 751
722 Ordering construction-FY 2009 Sidewalk Repair Program-Zone 8, Contract 751
723 Confirming approval of plans-Young Arena Message Center
724 Ordering construction-Young Arena Message Center
725 Confirming approval of plans-Asbestos Removal, Rath Administration Bldg, Contract 131-AR-09-2-08-GO
726 Authorizing to proceed-Asbestos Removal, Rath Administration Bldg, Contract 131-AR-09-2-08-GO
727 Confirming approval of plans-2008 Stone Replacement at Waterloo Public Library
728 Ordering construction-2008 Stone Replacement at Waterloo Public Library
729 Acceptance of low bid from Action Target ($25,785.00), Replace Target System at Police Training Center
730 Site plan amend-Deer Creek Development for development of office bldg for W'loo Social Security Office
731 Sale & conveyance Fire Station #8 at LaPorte Rd/San Marnan Dr for$2.1 million-First Equity Acquisitions
732 Purchase & Sale Agree for sale & conveyance Fire Station #8 for$2.1 million-First Equity Acquisitions
733 Award of contract-ACCO Unlimited ($129,179.00), 2008 Swimming Pool Filter Replace & Painting Project
734 Final Plat of Klingaman Park Fourth Addition
735 Joint Funding Agree w/US Dept Interior-maintenance of Cedar River Gage Station at 6th St ($8,880.00)
736 Federal Aid Surface Repair Agree w/Chicago,Central RR & IDOT-construct crossings at Willow/Dearborn
737 Notice of Interest for Hazard Mitigation Grant w/lowa Homeland Security Emergency Manage-2008 Flood
738 Tax exemptions on improvements in CURA-Vicki Weikert, 133 University Ave ($28,879.00)
739 Tax exemptions on improvements in CURA-JB McCellan, 229 Ricker St ($11,454.00)
740 Tax exemptions on improvements in CURA-Jeanne Holub, 638 Kirkwood Ave ($20,000.00)
741 Accept of Work-ACCO Unlimited ($57,528.72), 2007 Swimming Pool Filter Replacement- Byrnes Pool
742 Dedicating easement over portions of land north of vacated alley adjacent to former Rath Admin Bldg
743 Set hearing Sept 2, 2008 on bid rec'd for flood damaged boiler replacement at Center For Arts east wing
9/2/08 744 Bills payment
Tff
W 6S 745 Waiver for concrete driveway, Sheila Stufflebeam, 1538 Lyon Avenue
746 Waiver for concrete driveway, Paul J. Wolter, 729 Burbank Avenue
3 7 747 Waiver for concrete driveway, Phil Westemeier, 1306 Holstein Place
748 Except to burning yard waste-West High School, 425 E Ridgeway, Sept 24, 2008, bonfire in parking lot
749 John Deere to hold 90th Anniversary Celebration, Sept 27,2008, grounds of RiverLoop Expo/Five Sullivan
750 Confirming approval of scope of services-Composting Collected Yard Waste
751 Authorizing to proceed-Composting Collected Yard Waste
752 Award of contract-WBC Mechanical ($75,541.00), Flood Damage-Boiler Replace at Center For The Arts
753 Award of contract-Signs & Designs ($39,710.00), 2008 Young Arena Message Center
754 Award of contract-Failor Hurley Construction ($55,300.00), 2008 Stone Replacement for Public Library
755 Award of contract-B & B Builders & Supply($8,574.85), FY 2009 Sidewalk Repair-Zone 8, Contract 751
756 Award of contract-Advanced Environmental Testing ($237,000.00), Asbestos Removal, Rath Admin Bldg