Loading...
HomeMy WebLinkAbout2007 July Index DATE RES. NO. SUBJECT 7/9/07 577 Construction Plans for sanitary sewer for Lost Island East, submitted by Wayne Claassen Engineering 578 Construction Plans for sanitary sewer/storm sewer/paving for Country Club Business Center Addition 579 Addendum to RR Crossing Agree-surface improve w/IDOT & Canadian National RR, several locations 580 Agree wNision Iowa Bd &W'loo Develop Corp-CAT grant for Downtown Riverloop Expo ($1,000,000.00) 581 Brownfields Cleanup Revolving Loan app, loan fund agree & promissory note with EPA($350,000.00) 582 Reciprocal Ease Agree w/US Bank National-extend term of ease 1 year to use property during construct 583 Warranty Deeds from Richard/Janet Winder,Thomas Winder-acquisition property for construct of streets 584 Preliminarily approving plans, specs-GO Bond Demolition Project, Contract 149-D/AR-GO-07-23-07 585 Set hearing July 23, 2007 &taking bids-GO Bond Demolition Project, Contract 149-D/AR-GO-07-23-07 586 Request to certify the amount of$3,220.00 for work performed by Water Works at 1308 Leavitt St 587 Request to certify the amount of$5,697.00 for work performed by Water Works at 301-303 E 4th St 7/16/07 588 Bills payment pf 589 Waiver for concrete driveway, Dorothy Roby, 1202 Lucas Street 590 Confirming approval of plans, specs-FY 2007 US 63/Westfield Avenue Connection, Contract 730 591 Authorizing to proceed-FY 2007 US 63/Westfield Avenue Connection, Contract 730 592 Set new date of hearing Aug 6, 2007-GO Bond Demolition Project, Contract 149-D/AR-GO-07-23-07 593 Tax exemptions -Joni & Rocky Steen, 625 Sherman Ave ($11,156.49) 594 Supple Agree No 1 with Earth Tech-US 63/Westfield Avenue Connection, Contract 730 ($161,000.00) 595 Acceptance of 2006 Trent Lane Sanitary Sewer Extention 596 Accept of Work-Paul Christensen Construct ($96,872.00), Bath House Renovation for Byrnes/Gates Pools 597 Cert Substantial Completion-Modern Builders ($122,800.00), 2006 Riverfront Stadium Roof Replacement 598 Accept of Work-Aspro, Inc. ($199,277.00), 2006 Byrnes Tennis Complex Renovation Project 599 Preliminarily approving plans, specs-2007 Byrnes Tennis Complex Renovation Project 600 Set hearing Aug 6, 2007 &taking bids-2007 Byrnes Tennis Complex Renovation Project 601 Preliminarily approving plans, specs-FY 2007 Riverloop Exposition Plaza, Phase 1, Contract 721 602 Set hearing Aug 13, 2007 & taking bids-FY 2007 Riverloop Exposition Plaza, Phase 1, Contract 721 7/23/07 603 Bills payment 7� eJoe 604 Mary TeWinkel, 4-H Field Specialist, for variance to Discharging & Possessing Air Rifles, July 28, 2007 V. I`- 3197 - 605 Exchange Club to hold Healing Field 2007 w/procession of flags, Sept 7-9, 2007, Veterans Memorial Hall 606 Waiver for asphalt driveway, Emma M. Petersen, 1329 Wren Road 607 Waiver for concrete driveway, Robert Lee, 404 Douglas Street 608 Water Works to place concrete in area between back of curb & sidewalk in the 200 block of East 3rd St 609 Waiver for concrete driveway, Bruce Nelson, 4626 Winghaven Drive 610 Confirming approval of plans, specs-FY 2008 Commercial St/W 3rd St Parking Lot Paving, Contract 733 611 Ordering construction-FY 2008 Commercial St/W 3rd St Parking Lot Paving, Contract 733 612 Confirming approval of plans, specs-2007 Window Replacement for Waterloo Public Library 17 DATE RES. NO. SUBJECT 7/23/07 613 Ordering construction-2007 Window Replacement for Waterloo Public Library 614 Confirming approval of plans, specs-Intersection Traffic Safety Improvements, Contract 732 615 Ordering construction-Intersection Traffic Safety Improvements, Contract 732 616 Develop Agree w/Roger Klingfus-Sale & conveyance for$5,000.00 property at W 10th/Jefferson St 617 Sale & conveyance for$5,000.00 property at W 10th/Jefferson St to construct a commercial building_ 618 Set hearing Aug 6, 2007-Rezone portions of 1041-1117 Sheffield along former Mill Race for recycling yard 619 Set hearing Aug 6, 2007-Rezone 2000 E Donald for converting former Veridian Credit Union to a home 620 Set hearing Aug 6, 2007-Rezone 3458 E Shaulis for splitting existing home onto a smaller lot 621 Approval of letters from Berens-Tate regarding completed arbitrage testing for 2002/2003 GO bond issues 622 Agree w/Advanced Computer Engineering-support services for stand-alone computer system for Police 623 Three-Year Agree w/BH County-provide parking lot enforcement services at county parking lots 624 Grant award Agree w/EDA-grant for TechWorks Technology Center project ($1,600,000.00) 625 Naming public street off Martin Luther King Jr Dr west of N Elk Run Rd for Tyson Foods as Tyson Dr 626 Authorizing City Clerk to destroy certain records/papers, as provided in Section 272.13(5) of Code of Iowa 627 Acquisition of property at 919 Lafayette St from Mooring Tax LLC ($3,500.00) 628 Set hearing Aug 13, 2007-Amend City of W'loo Comprehensive Plan for changes to Future Land Use Map 8/6/07 629 Bills payment TC 630 Confirming approval of plans, specs-2007 Byrnes Tennis Complex Renovation Project A1/35 631 Ordering construction-2007 Byrnes Tennis Complex Renovation Project 632 Confirming approval of plans-GO Bond Asbestos Removal & Demolition,Contract 147-D/AR-GO-07-23-07 633 Authorizing to proceed-GO Bond Asbestos Removal & Demolition, Contract 147-D/AR-GO-07-23-07 634 Award of contract-Peterson Contractors ($870,971.30),FY2007 US 63/Westfield Connection,Contract 730 635 Award of contract-Aspro Inc ($43,758.45), FY2008 Commercial/W 3rd Parking Lot Paving, Contract 733 636 Award of contract-Failor Hurley Construction ($241,800.00), 2007 Window Replacement at Public Library 637 Award of contract-Allied Construction ($671,317.25), General Aviation Apron &Taxilanes Rehab at Airport 638 Award of contract-Cedar Valley Corp ($532,192.26), Rehab of Taxiway "A" at Airport 639 Proposed list for Reconstruction & Overlay Street Improvements for 2008 640 Contracts, Bonds-Failor Hurley Construction ($241,800.00), 2007 Window Replacement at Public Library 641 Contracts, Bonds-Aspro Inc ($43,758.45), FY2008 Commercial/W 3rd Parking Lot Paving, Contract 733 642 Pro Svcs Agree w/Earth Tech-prelim/final design of portages around Park Ave & 6th St dams ($29,500.00) 643 Notice of Discontinuation of storm water discharge for FY06 E. Side Sanitary Sewer Interceptor, Cont 707 644 Supple Agree w/Howard Green Co-design svcs for cleanup former CMC site, 625 Glenwood ($47,000.00) 645 Cooperative Dev Agree w/C. Valley TechWorks-TechWorks Center project & storm water pumping station 646 Agree w/Howard Green Co-design services for Phase I of Chamberlain site demolition at 550 Esther 647 Subrecipient Agree w/C. Valley TechWorks-FY06 Economic funds for rehab of TechWorks ($350,000.00) 648 Agree w/Governor's Traffic Safety, la Dept Public Safety-Alcohol Incentive grant ($31,500.00, no match) 18