HomeMy WebLinkAboutDNR Sewage Treatment Agreement - North Crossing Area - 10.3.2022Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
Sewage Treatment Agreement
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties;
i.e., a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the
time the permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the
project.
This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities.
However, the Departrnent of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT
Owner: North Crossing LLC
ENGINEER
Firm: Robinson Engineering Company
Address: 401 Main Street, Suite 218, Cedar Falls, IA 50613
Address: 819 Second Street NE, Independence, IA 50644
Representative: Ben Stroh
Project Officer: Monica Smith, PE
Phone Number:
Phone Number: 319-334-7211
Project Identification: North Crossing (Logan Ave./E. 4' Street and Ralston Road/E. Donald Street area)
Owner and System Receiving Wastes: City of Waterloo - Waterloo Water Pollution Control Plant; IA 079001; FED 0042650
CERTIFICATION
I am the authorized representative of the owner identified above and state that the proposed sanitary sewage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
Signature i cet): rv(.'f.i > Title: Design Engineer Date 10/13/2022
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed
sanitary sewage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing
adequate treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B, Code of Iowa, and
the rules of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,
sewer service agreements, or fee systems entered into between the parties.
Name: Quentin Hart Title: Mayor - City of Waterloo
Signature l fin axt M Date Council Approved - 10/3/2022 Phone:
9/2018 cmc
DNR Form 542-3219; 29