Loading...
HomeMy WebLinkAboutTerracon - Professional Services Agreement - Well_Plugging_Services, Cont. No. 1015 - 10.17.2022■ ierracon September 28, 2022 City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 Attn: Mr. Matt Schindel Re: Proposal for Well Plugging Services Jefferson Street Right of Way 300 Jefferson Street, Waterloo, Iowa Registration No. 20200033 LUST No. 9LTS91 Terracon Proposal No. P13227090 Dear Mr. Schindel: 3105 Capital Way Cedar Falls, Iowa 50613 P (319) 277-4016 F (319) 277-4320 Terracon.com ENR Rankings2022 2021 "u}': Asbestos and Lead Abatement' mg Top 100 Pure Designers Top 500 Design Firms Top 150 Global Design Firms* Top 200 Environmental* Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal for well plugging services at the above referenced site and submit the associated documentation to the required regulatory entities. An outline of the project, Terracon's scope of services, including schedule and compensation are provided in the following sections. 1.0 PROJECT INFORMATION In correspondence dated September 27, 2022, the Iowa Department of Natural Resources (IDNR) approved the No Action Required (NAR) classification and indicated that the site is eligible to receive a No Further Action (NFA) certificate once the necessary documentation for the certificate is provided. The following must be submitted to the IDNR to issue an NFA certificate: 1. A copy of the most recent deed or contract of sale with an accurate and complete legal description. NOTE: A legal description obtained from a tax form is not acceptable. 2. Copies of the Abandoned Water Well Plugging Records (DNR Form 542-1226) if they have not already been submitted. Please remember to include the LUST number on each Well Pluaginq Record and provide the appropriate signatures on each form. Once the NFA certificate is issued by the IDNR, the City of Waterloo is responsible for filing the certificate with the Black Hawk County Recorder and providing the IDNR with a file -stamped copy within 30 days. The IDNR requires a file -stamped copy for the NFA to be considered effective. This proposal presents the cost estimate of fees for monitoring well plugging field activities. Facilities I Environmental I Geotechnical I Materials 1 Jefferson Street Right of Way' Waterloo, Iowa September 28, 2022 I Terracon Proposal No. P13227090 2.0 SCOPE OF SERVICES • Terracon Terracon has a 100% commitment to the safety of all its employees. As such, and in accordance with our Incident and Injury Free® safety culture, Terracon will generate a project safety plan for use by personnel during field services. Prior to commencement of on -site activities, Terracon will hold a meeting to review health and safety needs for this specific project. At this time, we anticipate performing fieldwork in a United States Environmental Protection Agency (USEPA) Level D work uniform consisting of hard hats, safety glasses, protective gloves, and steel -toed boots. It may become necessary to upgrade this level of protection, at additional cost, during sampling activities in the event that petroleum or chemical constituents are encountered in soils or groundwater that present an increased risk for personal exposure. lase Service' The scope of this proposal is based upon plugging the reported site monitoring wells. Site records indicate five wells are associated with the site. The monitoring wells will be plugged in general accordance with Iowa Administrative Code (IAC) Chapter 39 and IDNR requirements. The services will generally consist of removing the well casing and screen, filling the remaining hole to the ground surface with hydrated bentonite, removal of the surface protection (man way and/or ring for flush mount), and replacement of surface to match surrounding conditions. Alternatively, if the well casing and screen cannot be removed due to damaged casing, equipment access limitations, etc., services will consist of the following: ■ Remove the surface protection. ■ Remove casing to a depth of four feet below grade at each well. ■ The remaining well annulus will be filled with hydrated bentonite. ■ Backfill the remaining well excavation with soil to an elevation that promotes drainage away from the plugged well area. ■ Repair the surface to match surrounding existing conditions. For wells in areas of concrete/asphalt or gravel, a concrete patch will be installed at ground surface or a layer of gravel will be added as appropriate. For wells in areas of green space, fill material will be sourced onsite and grass seed will be utilized as needed. An Abandoned Water Well Plugging Record (DNR Form 542-1226) will be completed for each plugged well. The forms will be signed by an Iowa -licensed well contractor and require signature from the City of Waterloo prior to submittal to the IDNR and Black Hawk County Environmental Health Department. The City will need to provide a legal description obtained from the most recent deed recorded with the Black Hawk County Recorder. If requested, Terracon will facilitate submittal to the IDNR and Black Hawk County Environmental Health Department with a request for the NFA certificate. However, Terracon assumes the certificate will be filed with the Black Hawk County Recorder and a file -stamped copy provided to the IDNR by the City of Waterloo. Facilities 1 Environmental 1 Geotechnical I 2 Jefferson Street Right of Way' Waterloo, Iowa September 28, 2022 I Terracon Proposal No. P13227090 Additional Services Beyond Base Services • ierracon Fees for proposed services included in this proposal are listed in Table 1. Please note that the table is not all-inclusive. Some services will require additional units based on site -specific circumstances. Should additional services be required beyond those outlined in the Table 1, a supplemental scope and fee will be developed for client approval. .)chedulc Services will be initiated upon receipt of the written notice to proceed. We estimate that the project can be scheduled within 15 business days and field activities completed in one day, weather and site conditions permitting. In order to comply with the proposed schedule, the following items are needed to be provided by the client at the time of notification to proceed in order to meet the client's required project completion date. Please include the following requested items along with the notification to proceed: ■ Right of entry to conduct the field services. ■ Notification of any restrictions or special requirements (such as safety) regarding accessing the site. • Locations of any buried tanks or other subsurface structures, including site service utilities, known to exist in the area. • A signed Supplement to Agreement for Services (Agreement) evidencing acceptance of this scope of services. Scope and Report Limitation The findings and conclusions presented in the final report will be based on the site's current utilization and the information collected as discussed in this proposal. Please note that we do not warrant database or third -party information, or regulatory agency information used in the compilation of reports. The limitations herein must be considered when the user of this report formulates opinions as to risks associated with the site. No warranties, express or implied, are intended or made. Site Access and Safety Client shall secure all necessary site related approvals, permits, licenses, and consents necessary to commence and complete the Services and will execute any necessary site access agreement. Consultant will be responsible for supervision and site safety measures for its own employees but shall not be responsible for the supervision or health and safety precautions for any third parties, including Client's contractors, subcontractors, or other parties present at the site. In addition, Consultant retains the right to stop work without penalty at any time Consultant believes it is in the best interests of Consultant's employees or subcontractors to do so in order to reduce the risk of exposure to the coronavirus. Client agrees it will respond quickly to all requests for information made by Consultant related to Consultant's pre -task planning and risk assessment processes. Client acknowledges its responsibility for notifying Consultant of any circumstances that present a risk of exposure to the coronavirus or individuals who have tested positive for COVID-19 or are self -quarantining due to exhibiting symptoms associated with the coronavirus. Facilities 1 Environmental 1 Geotechnical 1 Materials 3 Jefferson Street Right of Way' Waterloo, Iowa September 28, 2022 I Terracon Proposal No. P13227090 3.0 COMPENSATION • Terracon The Scope of Services outlined in this proposal will be performed as a unit price not to exceed $2,725 in accordance with the attached budget estimate presented in Table 1. If, as a result of these services, additional work is required outside the scope of this proposal, you will be contacted and proposed fees for additional work will be provided. Client authorization will be obtained prior to commencement of additional work outside the scope of this proposal. Additional fees will be incurred if City of Waterloo requests Terracon assist with filing the NFA certificate with the Black Hawk County Recorder and providing a file -stamped copy to the IDNR. These additional fees would be estimated at $500 depending on the Black Hawk County filing fee and submittal requirements. 4.0 AUTHORIZATION If this proposal meets with your approval, work may be initiated by returning an original copy of the attached Supplement to Agreement for Services to our Cedar Falls, Iowa office. Project initiation may be expedited by sending a copy of the Task Order via e-mail to Dave.Cleary@terracon.com or facsimile at (319) 277-4320. We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If we can provide any additional environmental, occupational health, safety -related, or other services, please call us at 319-277-4016. Sincerely, Terracon Consultants, Inc. Dave CCey 7e-s-ce- Aleiz Dave C. Cleary, REM Jesse M. Nelson, REM, CGP Environmental Department Manager Senior Associate Attachments: Table 1 Supplement to Agreement for Services Facilities 1 Environmental 1 Geotechnical 1 Materials 4 Table 1: Services and Fees Terracon Proposal Number: P13227090 Site Name: Jefferson Street Right of Way Address: 300 Jefferson Street City, State: Waterloo, Iowa LUST Number: 9LTS91 Registration Number: 202000033 Date: 9/28/2022 ■ ierracon Task Cost per Unit Unit Type No. of Units Total Field Services Daily equipment charges (IP/water probe, PID, survey, etc.) $ 250 /day 1 $ 250 Mobilization $ 725 /mobilization 1 I $ 725 Groundwater monitoring well plugging and form completion $ 350 /well 5 $ 1,750 Subtotal $2,725.00 Total $2,725.00 iiiierracon Reference Number: P13227090 SUPPLEMENT TO AGREEMENT FOR SERVICES CHANGE TO SCOPE OF SERVICES AND FEES This SUPPLEMENT to AGREEMENT FOR SERVICES to the original Agreement for Services (original Agreement dated 02/01/2021, Agreement reference number P13207110) is between City of Waterloo IA ("Client") and Terracon Consultants, Inc. ("Consultant") for additional or changed Services to be provided by Consultant for Client on the Project, as described in the Agreement for Services. This Supplement is incorporated into and part of the Agreement for Services. Scope of Services. The scope of the additional or changed Services are described in the Scope of Services section of the Consultant's Supplemental Proposal, unless Services are otherwise described below or in Exhibit B to this Supplement (which section or exhibit are incorporated into the Supplement). See attached Terracon Proposal P13227090 dated September 28, 2022 Compensation. Client shall pay compensation for the additional or changed Services performed at the fees stated in the Supplemental Proposal unless fees are otherwise stated below or in Exhibit C to this Supplement (which section or exhibit are incorporated into the Supplement). See attached Terracon Proposal P13227090 dated September 28, 2022 All terms and conditions of the Agreement for Services shall continue in full force and effect. This Supplement is accepted and Consultant is authorized to proceed. Consu Itant: Terracon Consultants, Inc. By: Dave CZ2sy Name/Title: Date: 9/28/2022 Dave C. Cleary, REM / Environmental Department Manager Address: 3105 Capital Way, Ste 5 Phone: Email: Cedar Falls, IA 50613-7030 (319) 277-4016 Fax: (319) 277-4320 Dave.Cleary@terracon.com Client: City of Waterloo IA By: 4.e b . mart sice7 ate: Name/Title: Quentin Hart, Mayor 10/17/2022 Address: 715 Mulberry St Phone: Email: Waterloo, IA 50703-5714 Fax: Page 1 of 1 Rev. 8-12