Loading...
HomeMy WebLinkAboutModus - Profesional Service Agmnt - Center for the Arts Chiller Replacement - 11.7.2022ivl V [i J it`- A J i\A ( I -i: ii 11 c August 29, 2022 Greg Ahlhelm City of Waterloo, Building Inspector 715 Mulberry Street Waterloo, IA 50703 Subject: Waterloo Center of the Arts - Chiller Replacement Project Waterloo, Iowa Dear Greg: I am pleased to offer you this engineering service proposal for the above -mentioned project. Project scope of work: • This project consists of replacing the existing chiller. • Evaluate the new chiller location to either a roof top solution or on grade solution • Evaluate the existing chilled water pumps and make adjustments as required • Extend new piping and connect into existing chilled water system • If the chiller is roof mounted, then the existing structure will need to be evaluated. • If the chiller is ground mounted, then a housekeeping pad will be required. • Integrate the Chiller into the DDC system for control. • Modify the electrical to accommodate the new chiller • Prepare frontend specifications and prepare administrative duties • Prepare AIA contracts between Owner and Contractor Project scope of services: Design Phase • Design services to include contract documents (plans and specifications) for the above scope of work. • Evaluate chiller location and make decision with owner • Determine chilled water pipe routing • Structural services are included • Design Meetings o On -site investigations meetings as required o Owner final review meeting Bid Negotiation Phase • Attend pre -bid meeting • Assist with addendums • Respond to contractor questions Page 1of3 I1 kA WWW.MODUS-ENG.COM WATERLOO 214 East 4th Street Waterloo, IA 50703 TEL 319.235.0650 DES MOINES 130 East 3rd Street Des Moines, IA 50309 TEL 515.251.7280 IOWA CITY 118 East College Street Iowa City, IA 52240 TEL 319.248.4600 M V V V J hA fl I C, Construction Administration Phase • Attend pre -construction meeting • Review submittals • Attend construction progress meetings as required • Prepare punch list report Cost Opinions • Perform cost opinion at 95% Construction Document. Project services not included: • Create Revit backgrounds (reuse back grounds from the original project) • Architectural service • Civil engineering • Construction set (post bidding) • As -built CAD drawing creation • Life cycle cost analysis for utility rebates or energy code approval • Commissioning services Preliminary Project Cost Opinion Preliminary cost opinion. Based on historical data and conversations with the boiler manufacturer, our preliminary cost opinion for the above scope of work is $230,000. Compensation Base compensation. For the above -referenced services our lump sum fee will be $26,600. Owner initiated change order request. Our fee shall be determined based on an agreed amount between the design team and owner. Design team initiated change order request. Our fee shall be waived for the MEPT design. Additional design services. If design services occur that require a "hourly" situation. As approved, our fee shall be compensated using our hourly rates. Reimbursables. • The following reimbursables are included in our base compensation. o Printing and reproduction of plans and specifications necessary for coordination and review during the design process. o Traveling required to the project • The following reimbursables are NOT included in our base compensation. o Permit and application fees associated to governing bodies. o Distribution and document reproduction expenses Page 2 of 3 M M WWW.MODUS-ENG.COM WATERLOO 214 East 4th Street Waterloo, IA 50703 TEL 319.235.0650 DES MOINES 130 East 3rd Street Des Moines, IA 50309 TEL 515.251.7280 IOWA CITY 118 East College Street Iowa City, IA 52240 TEL 319.248.4600 tvI V lU U t►Al ( IMF I Miscellaneous Drawing Standards. • Drawings will be produced using Revit 2020 version. Errors and Omissions. Our Policy shall be deemed a part of this Agreement. Standard Form of Agreement. The AIA 8101 (2017) Standard Form of Agreement Between Owner and Architect shall be deemed a part of this letter. Sincerely, G/A k.#6//ei-L Michael J. Brocka, P.E. MJB If you are in agreement, please sign this letter and return a copy to our office. This will serve as our written contract. 'ueA-tk +tart DIGITALLY SIGNED 11/7/2022 SIGNATURE DATE Page.5 of 3 r#i M WWW.MODUS-ENG.COM WATERLOO 214 East 4Er' Street Waterloo, IA 50703 TEL 319.235,0650 DES MOINES 130 East 3rd Street Des Moines, IA 50309 TEL 515.251.7280 IOWA CITY 118 East College Street Iowa City, IA 52240 TEL 319.248.4600