Loading...
HomeMy WebLinkAboutK & W Electric - CO#2 - FY22 4th St Bridge and Dam Lighting, Cont No. 1054 - 11.21.2022CHANGE ORDER ® Kevin Martin, K&W Electric ❑ 0 Jamie Knutson, City of Waterloo ❑ 0 ❑ PROJECT: 411) Street Bridge Dann & Lighting CO No.: 02 OWNER: City of Waterloo, Contract 1054 DATE OF ISSUANCE: 10/24/22 TO: Kevin Martin FROM: K&W Electric, Inc. RITLAND+KUIPER Landscape Architects l 127 Lincoln Street 501 Sycamore Street, Mezzanine A Cedar Falls, IA 50613 Waterloo, Iowa 50703 You are directed to stake the following changes in this Contract: 1. Added cost for labor, equipment, and materials to add security cameras to the 4`►' Street Pedestrian bridge. Includes cameras, power supply, and control infrastructure. $44,950.00 TOTAL ADD TO CONTRACT $44,950.00 Attachments: PR-01 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was ... $749,772.30 Net change by previously authorized Change Orders ($102,300.00) The Contract Sum prior to this Change Order was $647,472.30 The Contract Sum will be (increased) by this Change Order $44,950.00 The new Contract Sum including this Change Order will be $692,422.30 The Contract Time will be (extended) Thirty ( 30) Days RITLAND+KUIPER Landscape Architects ARCHITECT Signatur Mark Kuiper, ASLA, LEED AP K&W Electric, Inc. City of Waterloo CON"(/RACTOR OWNER 414, QuettEuz EN Signature Signature Kevin Martin Quentin Hart PROPOSAL REQUEST 01 4th Street Bridge & Dam Lighting Project City of Waterloo Contract No. 1054 From: David Jordan <djordan@a,modus-eng.com> Sent: Wednesday, September 21, 2022 9:47 AM To: Mark Kuiper <mark@ritlandkuiper.com>; Kevin Martin <kmartin@kwsign.com> Cc: Ryan Vestal <rvestal(a,modus-eng.com> Subject: 4th Street Bridge Camera PR Please provide a price for the following work to get a camera network, power, and accessories added to the 4th street bridge lighting project. Cameras: Mounted at the top of each of the ends of the walkway bridge, provide one (1) Axis #P3727-PLE per side (total of two). Lenses shall be adjusted to cover the courtyard area and lighting towers in a 180-degree fashion. The fourth lens shall cover pedestrians entering the bridge for facial recognition. On the opposite side of these cameras looking back into the bridge viewing the interior of the bridge, provide one (1) Axis #P1467-LE Bullet camera per end (total of two). For the Middle Sections and bridge viewing platforms provide two (2) Axis #P3715-PLVE per platform (total of 4). These shall also be mounted at the top and on opposite sides of the platform. The lenses shall be adjusted so that one lens looks into the pedestrian walkway covering the interior of the bridge and the other to cover the pedestrian platform. These shall be adjusted like described on both ends of the platform and at both platform locations. See attached image for further details of viewing angles and coverage. Provide 8 salient camera licenses for these cameras to talk to salient. At the far end (southwest corner closest to the parking ramp) provided two (2) wireless link Ubiquiti Nanobeam ac gen2. Model number NBE-5AC-Gen2. One wireless link is located at the west most camera location and the other is located at the parking garage. Provide 120V plug-in POE injector and associated receptacle at parking garage location. Network Cabinets/Components: Provide two (2) Nvent/Hoffman 24x24x12 Wall mounted, 3-point latch, Nema 4x stainless steel, and key lockable enclosures for data network and camera equipment. Coordinate with lighting control cabinets and exact locations prior to mounting. We will mount one (1) in each viewing platform. Provide all mounting and accessories needed for a complete and working, protected installation. Provide 120v unswitched power at each location. Mount one (1) 10 port, industrial, hardened, L2 Managed, POE, wall or din rail mountable, switch equal to TRENDnet #TI-PG102i-M with proper 120v/24v power supplies. Cable and Pathway Provide mid -grade Category 6 cabling from each cabinet and switch to serve POE powered cameras. (One drop/run per camera (8 total), one to connect the two cabinets/switches together, and one for the radio (wireless uplink)). Coordinate routing with electrical contractor and bridge structure. Electrician shall run 1" conduit to match lighting conduit (3/4 acceptable in bridge path if 1" doesn't fit) for all data cabling. Connect the two cabinets with one pathway. Cat 6 cabling can be flown in bridge structure to get to cameras. Electrical Provide new 20A-1P circuit of unswitched power to serve network cabinets. Refer to attached drawing for more information. 2022 RITLAND+KUIPER LANDSCAPE ARCHITECTS COPYRIGHT N CBX100 RGB (TYP. OF 5) ICO PATHWAY LIGHTING PLAN POWER TO POE SWITCH EXISTING CANOPY LIGHTING RACEWAY IS LOCATED ON NORTHWEST SIDE OF BRIDGE. RGB (TYP. OF 5) CBX 100 REFER TO CONDUCTOR AND CONDUIT CHART FOR MORE INFORMATION O 1" = 30'-0" GENERAL NOTES: A. ALL CONDUITS SERVING CIRCUITS ON THE BRIDGE SHALL BE SURFACE MOUNTED TO BRIDGE EXTERIOR WALL OR SUSPENDED BELOW THE BRIDGE. JUNCTION BOXES SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. COORDINATE WITH DESIGN TEAM AS NECESSARY. B. CONTRACTOR SHALL PROVIDE ACCESS TO BELOW THE BRIDGE DURING CONSTRUCTION - CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RIGGING, SCAFFOLDING, ETC, REQUIRED FOR CONSTRUCTION. C. LOCATIONS OF ALL NEW AND EXISTING EQUIPMENT, LIGHT FIXTURES, AND CONDUIT ROUTING ARE INTENDED TO BE SHOWN SCHEMATICALLY AND SHALL BE COORDINATED WITH THE DESIGN TEAM DURING CONSTRUCTION. D. ALL CONDUITS, JUNCTION BOXES AND FITTINGS SHALL BE WET LOCATION, RATED,WATERTIGHT AND SEALED. REFER TO SPECIFICATIONS FOR MORE INFORMATION. REFERENCED NOTES: 0 (NOT ALL NOTES MAY BE APPLICABLE TO THIS SHEET) 1. ELECTRICAL CONTRACTOR SHALL REMOVE EXISTING CANOPY LIGHT AND EXISTING JUNCTION BOX. WIRE NEW FIXTURES TO EXISTING CANOPY LIGHTING CIRCUIT(S). REUSE EXISTING CONDUCTORS AND RACEWAY. REFER TO FIGURE 1 FOR MORE INFORMATION ON DEMOLITION SCOPE. 2. WIRE FIXTURES TO EXISTING TIMECLOCK CONTROLS LOCATED IN SAME NEMA 3R ENCLOSURE AS PANEL 1C. 3. MOUNT RGB POINT LIGHT FIXTURES TO WALKWAY NODE EXTERIOR CONCRETE WALL. COORDINATE EXACT MOUNTING HEIGHT AND LOCATION WITH DESIGN TEAM PRIOR TO INSTALLATION. 4. REMOVE TWO (2) AREA LIGHTS AND ASSOCIATED JUNCTION BOXES INSTALLED IN NODES. EXISTING CONDUCTORS AND RACEWAY TO REMAIN PROVIDE NEW SPLICE BOXES TO MAINTAIN CIRCUITRY TO OTHER FIXTURES. 5. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ONE (1) CATSE CABLE EQUAL TO BELDEN #7921A ROUTED IN A 1" CONDUIT FROM THE MAIN CONTROLLER LOCATION TO EACH OF THE CBX BOXES AND WIRELESS TRANSCEIVERS. ROUTE CONDUIT SURFACE MOUNT ON OUTSIDE OF BRIDGE. 6. REFER TO SHEET E-3.0 FOR MORE INFORMATION OF MOUNTING OF CASCADES LIGHTING. COORDINATE INSTALLATION WITH ALUMINUM TRUSS MANUFACTURER. 7. RUNS OF LOG LUMINAIRES ARE DAISY CHAINED VIA MANUFACTURER SUPPLIED JUMPER CABLES. FROM CBX CONTROL BOXES. FIGURE 1: EXISTING CANOPY LIGHT TO BE REMOVED. IGHT AND JUNCTION BOX TO BE REMOVED. RACEWAY AND CONDUCTORS 0 REMAIN. TYPICAL OF 24 LOCATIONS. NOTE: UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS SHALL VERIFY ALL DEPTHS AND ALL LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL UTILITIES MAY NOT BE SHOWN. River Lights F.Y. 2022 4th Street Bridge & Dam Lighting Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Lighting Designer: Shakespeare Lighting Design 1806 East Thornton Drive Bloomington, Indiana 47401 Phone: 812-320-2796 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Geotechnical Engineer: Terracon Consulting Engineers 6612 Chancellor Drive, Suite #102 Cedar Falls, Iowa 50613 Phone: 319-277-4016 Issued No. Date Description Issue Date : 06/20/22 Designed By : Drawn By : Reviewed By : Sheet Title PATHWAY LIGHTING PLAN Category Sheet E-2.1 City of Waterloo Contract No. 1054 21-086 WATERLOO RIVER LIGHTING ,ICTIR1C9 LIM0m 100% Employee Owned Date: Company: Attention: RE: 10.08.22 Modus David 4th Street camera's Nick Steinkamp CEO Kevin Martin President — Civil Operations Brian DeVries President— Commercial Operations We are pleased to provide you the following quote. This quote includes all need labor, equipment, and materials to complete. The one exception to the RFQ is that we will be running the cat 6 cable in the cable tray that is be hide fascia board and below the new LOG light fixtures. We are also asking for a completion date schedule extension so we can receive the needed materials. LUMP SUM $44,950.00 If you have any question, please feel free to call me at the office or at 319-240- 1119. Kevin Martin 1127 Lincoln St. PO Box 967 Cedar Falls, IA 50613 PH: 319.277.0415 F: 319.277.1418 1004 Main St. PO Box 426 Emmetsburg, IA 50536 PH: 712.852.9077 F: 712.852.8061 1Bc ANGS Email: kwe ink-wetectric.com Visit our website at www.k-weleciric.com K&W Electric, Inc. is an Equal Opportunity Employer Assioeleted Builders and Contractors, Inc. Iowa Chapter The Associated General Contractors of Iowa