Loading...
HomeMy WebLinkAboutWoodruff Construction - CO #7, Contract No. 994 - 12.19.2022STRAND ASSOCIATES® Excellence in Engineering Since 1946 November 29, 2022 CHANGE ORDER NO. 7 PROJECT: OWNER: CONTRACT: CONTRACTOR: Strand Associates, Inc 910 West Wingra Drive Madison, WI 53715 (P) 608.251.4843 www.strand.com F.Y. 2020 Wastewater Treatment Plant Biosolids Modifications City of Waterloo, Iowa City Contract No. 994 Woodruff Construction, LLC Description of Change 7a Add a thermostatic mixing valve in Structure 300 in accordance with RFI No. 62, dated March 14, 2022, and the enclosed cost proposal dated March 16, 2022. 7b Modify the painting scope in accordance with the enclosed e-mail correspondence dated May 2, 2022. 7c Add joint sealants to the existing masonry structures in accordance with the enclosed cost proposal dated June 28, 2022. 7d Delete the macerator control panel modifications as described in Change Order No. 6, item 6a. 7e Change the Concrete Surface Repair —Top of Wall Repairs allowance from $9,900 to $0. 7f Change the Concrete Surface Repair —Wall Vertical Surface and Underside of Slab Repairs allowance from $11,000 to $0. 7g Change the Concrete Surface Repair —Top of Slab Repairs allowance from $9,000 to $0. 7h Change the Masonry Restoration and Cleaning-100 Percent Repointing allowance from $160,000 to $93,028. 7i Change the Masonry Restoration and Cleaning —Less Than 100 Percent Repointing allowance from $4,000 to $0. 7j Change the Brick Replacement allowance from $23,500 to $1,627. 7k Change the Excavation, Backfill, and Grading —Unsuitable Foundation Material for Structures allowance from $114,000 to $4,503.70. 71 Change the Excavation, Backfill, and Grading —Unsuitable Foundation Material for Utility Trenches allowance from $22,000 to $0. 7m Add reimbursement for piping materials related to unforeseen conditions in accordance with the enclosed cost proposal dated September 13, 2022. SKH:II\S:\MAD\4400--4499\4463\009\Construction\Change Orders\007\C07.docx ADD $4,084.00 ADD $0.00 ADD $4,453.20 (DEDUCT) ($2,164.00) (DEDUCT) ($9,900.00) (DEDUCT) ($11,000.00) (DEDUCT) ($9,000.00) (DEDUCT) ($66,972.00) (DEDUCT) ($4,000.00) (DEDUCT) ($21,873.00) (DEDUCT) (DEDUCT) ADD ($109,496.30) ($22,000.00) $2,696.00 Arizona I Illinois I Indiana I Iowa I Kentucky I Ohio I Tennessee I Texas I Wisconsin City of Waterloo —Woodruff Construction, LLC Contract No. 994, Change Order No. 7 Page 2 November 29, 2022 7n Add ground fault protection equipment (GFPE) breaker to the heat trace circuit in Structure 300. 7o Change the Final Completion date to December 15, 2022. 7p Remove manual motor switch for 330-EF-6 and 325-EF-1. TOTAL VALUE OF THIS CHANGE ORDER: Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order Contract Substantial Completion Date Adjustment s „an Associates, Inc" ADD ADD (DEDUCT) (DEDUCT) Original Contract Substantial Completion Date Contract Substantial Completion Date Adjustments due to previous Change Orders Contract Substantial Completion Date Adjustments due to this Change Order Current Substantial Contract Completion Dates including all Change Orders Contract Final Completion Date Adjustment Original Contract Final Completion Date Contract Final Completion Date Adjustments due to previous Change Orders Contract Final Completion Date Adjustments due to this Change Order Current Final Contract Completion Dates including all Change Orders $1,374.00 $0.00 ($1,101.00) ($244,899.10) $16,587,300.00 $209,320.21 ($244,899.10) $16,551,721.11 January 2, 2022 113 Days 0 Days April 25, 2022 March 3, 2022 113 Days 175 Days December 16, 2022 ♦♦`‘.os#.nHIi,,, This document shall become a supplement to the Contract and all provisions will apply hereto. a . %O E OMMEN ED® 244 RANDALL A. .i e, =Ca: z: WIRTZ z= v' 16137 n _ 1GINEER—Strand Associate ♦♦�."APPRO VED 11�Z� LBZv 'Inc.® Date CONTRA OR —Woodruff Construction, LLC APPROVED Quern` 914r s OWNER —City of Waterloo, Iowa SKH:III\S:\MAD \4400- 4499\44631009\Construction\Change Orders\00TC07.docx 11/29/22 Date 12/19/2022 Date www.strand.com