HomeMy WebLinkAboutLodge Construction - Mni-Roundabout - 1.3.2023CONTRACT
FOR THE CONSTRUCTION OF
SOUTH STREET AND WEST 9TH STREET MINI -ROUNDABOUT
DOT Project Number: CS-TSF-8155(777)--85-07
City Project Number: TOF-297
CITY OF WATERLOO, IOWA
This contract made and entered into this() day of bQLf,\ li , 2022, by and between the City of
Waterloo, Iowa, a Municipal Corporation, (hereinafter referredtoas City), and
L.qQ (Orljr'uc' oy‘ L Inc.• of Mr -Kw' llDlfl) (hereinafter referred to as Contractor),
WITN SETH:
Contractor agrees to build and construct the SOUTH STREET AND WEST 9TH STREET MINI -ROUNDABOUT, and
furnish all necessary tools, equipment, materials, and labor necessary to do all the work called for in the plans and
specifications in a workmanshiplike manner and for the prices set forth in Contractor's proposal, which was
accepted by the City, and which is understood and agreed to be a part of this contract.
Contractor understands, agrees with, and is bound by the terms of General Conditions of Contract and Special
Conditions of Contract contained in the Contract Documents (Project Manual).
The total amount of the erformance bond, based on the Contractor's total bid prices, and for which 100% suret
bond is required is $ 00
This contract is not divisible, but in the event of a conflict between this contract and the various instrument
incorporated by, reference W ccon9+act shall govern.
Contractor
p,I /��
BY: 3 Il Ve Locke
Title: �f fsicIP
CITY OF WATERLOO, IOWA
Quercthz 9-(arE
Mayor
Approved by the City Council of the City of Waterloo, Iowa, on 1 /3/2023pX
ATTEST: 7Ce y Fe1th[e _� � , City Clerk, Waterloo, Iowa