Loading...
HomeMy WebLinkAboutFrickson Bros Excavating - Demolition & site clearance agmnt - 4/18/2011I AGREEMENT FOR DEMOLITION AND SITE CLEARANCE GROUP 172-D-GO-04-18-11 THIS AGREEMENT made this 18th day of April, 2011, by and between FRICKSON BROS. EXCAVATING, a corporation organized and existing under the laws of the State of Iowa, hereinafter called the "CONTRACTOR", and the CITY OF WATERLOO, IOWA, hereinafter called the "CITY". WITNESSETH, that the Contractor and the City for the consideration stated herein mutually agree as follows: ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, services, and perform and substantially complete all work within 45 days after receipt of Notice to Proceed, all work required for the Demolition and Site Clearance in an efficient and workmanlike manner as follows: DEMOLITION OF BUILDINGS ON, AND CLEARANCE OF SITES of all parcels as enumerated in Bid Schedule attached to and forming a part of this Contract, within the City of Waterloo Demolition Project 172-D-GO- 04-18-11 all in strict accordance with the Contract Documents for Demolition and Site Clearance including all Addenda thereto, Numbered and Dated Numbered and Dated ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the Contractor for the performance of the Contract in current funds, subject to additions and deductions as provided in the Section "Changes in the Work" under General Conditions, Part I, and subject to all other conditions set forth in the Contract Documents, the sum of EIGHTY-ONE THOUSAND, SIX HUNDRED AND NO/100 Dollars ($81,600.00), in addition to and above the value of such salvaged materials specified to become the property of the Contractor, and in accordance with the contractor's bid. ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the following: a. This Agreement b. Addenda c. Invitation to Bid d. Instructions to Bidders e. Signed copy of Bid f. General Conditions Part I, II, and III g. Special Conditions h. Technical Specifications i. Drawings as listed in the Schedule of Drawings AGR-1 THIS AGREEMENT, together with the other documents enumerated in this Article 3, which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provisions of any other component part, the provision of the component part first enumerated in this Article 3 shall govern, except as otherwise specifically stated. NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be issued to the contractor, whereupon the contractor shall proceed with his/her work in accordance with the Contract time established in the Pre -Construction Meeting. ARTICLE 4. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in three (3) original copies on the day and year first above written. FRICKSON BROS. EXCAVATING ATTEST: (for individual or partnership) Contractor Name By: �6�Xii/ 0 VAA Robert D. Frickson, Owner CITY OF WATERLOO By: alst rnest G. Clark, Mayor By: ATTEST: By: Suzy Sch4res, City Clerk AGR-2 CITY OF WATERLOO GO - DEMOLITION PROGRAM BASE BID MAIN BUILDING STREET ADDRESS STORY HGT. & TYPE BASEMENT ITEMIZED UNIT PRICE SCHEDULE GROUP NO. 172-D-GO-04-18-11 OTHER BUILDINGS 233 Ash Street 1 'A Story (352 SF) Additions: 1 Story (490 SF) Fencing & volunteer trees along fence lines Old clothes line/posts Full "0" Finished None NET BID PRICE $6,300.00 325-27 Clay Street 1 Story Frame (1299 SF) Additions: 1 Story Masonry (120 SF) Sidewalk leading to South entrance Retaining walls Garage (240 SF) Shed (234 SF) $9,000.00 1121 South Street 1 1/2 Story Frame (816 SF) Yard waste & debris, wooden Structure next to shed Full "0" Finished Area Shed (?? SF) $7,400.00 1309 W. 2nd Street 2 Story (572 SF) Yard debris, clothesline Full "0" Finished Area Shed (24 SF) $9,500.00 720 W. Park Street 2 Story Frame (912 SF) Volunteer trees & yard debris Full "0" Finished Area Garage & attachment $9,300.00 (504 SF) & (240 SF) 411 Wellington St. 2 Story Frame (672 SF) Additions: 1 Story Frame (374 SF) Fence & volunteer growth Picnic table and yard debris Full "0" Finished Area None $7,500.00 425 Clay Street 2 Story Frame (998 SF) Full "0" Finished Area None $9,700.00 Additions: 1 Story Frame (108 SF) 1 Story Frame (232 SF) 1 Story Frame (18 SF) 121 Cutler Street 2 Story Frame (912 SF) Full "0" Finished Area None $8,800.00 Volunteers trees w/n 3 feet of house Driveway approach, sidewalk approach 1555 Newell St. N/A N/A Garage (216 SF) $1,400.00 320 E. 1 St. Street 1 1/ 2 Story Frame (328 SF) Full "0" Finished None $5,500.00 Volunteer Tree Growth 326 Center Street 2 Story Frame (912 SF) Full "0" Finished Area Garage (240 SF) $7,200.00 BASE BID TOTAL $81,600.00 ALTERNATES: 715 Vinton St. 1 Story Frame (698 SF) Full "0" Finished Area None $ 8,300.00 ALTERNATES TOTAL: $ 8,300.00 BASE + ALT. BID TOTAL $89,900.00 BF-4 (1)