HomeMy WebLinkAboutFrickson Bros Excavating - Demolition & site clearance agmnt - 4/18/2011I
AGREEMENT FOR DEMOLITION AND SITE CLEARANCE
GROUP 172-D-GO-04-18-11
THIS AGREEMENT made this 18th day of April, 2011, by and between FRICKSON BROS.
EXCAVATING, a corporation organized and existing under the laws of the State of Iowa,
hereinafter called the "CONTRACTOR", and the CITY OF WATERLOO, IOWA, hereinafter
called the "CITY".
WITNESSETH, that the Contractor and the City for the consideration stated herein mutually
agree as follows:
ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision, technical
personnel, labor, materials, machinery, services, and perform and substantially complete all work
within 45 days after receipt of Notice to Proceed, all work required for the Demolition and Site
Clearance in an efficient and workmanlike manner as follows: DEMOLITION OF BUILDINGS
ON, AND CLEARANCE OF SITES of all parcels as enumerated in Bid Schedule attached to
and forming a part of this Contract, within the City of Waterloo Demolition Project 172-D-GO-
04-18-11 all in strict accordance with the Contract Documents for Demolition and Site Clearance
including all Addenda thereto,
Numbered and Dated
Numbered and Dated
ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the Contractor
for the performance of the Contract in current funds, subject to additions and deductions
as provided in the Section "Changes in the Work" under General Conditions, Part I, and subject
to all other conditions set forth in the Contract Documents, the sum of
EIGHTY-ONE THOUSAND, SIX HUNDRED AND NO/100 Dollars ($81,600.00), in addition
to and above the value of such salvaged materials specified to become the property of the
Contractor, and in accordance with the contractor's bid.
ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the following:
a. This Agreement
b. Addenda
c. Invitation to Bid
d. Instructions to Bidders
e. Signed copy of Bid
f. General Conditions
Part I, II, and III
g. Special Conditions
h. Technical Specifications
i. Drawings as listed in the
Schedule of Drawings
AGR-1
THIS AGREEMENT, together with the other documents enumerated in this Article 3, which said
other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms
the Contract between the parties hereto. In the event that any provision in any component part of
this Contract conflicts with any provisions of any other component part, the provision of the
component part first enumerated in this Article 3 shall govern, except as otherwise specifically
stated.
NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be issued
to the contractor, whereupon the contractor shall proceed with his/her work in accordance with
the Contract time established in the Pre -Construction Meeting.
ARTICLE 4.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in three
(3) original copies on the day and year first above written.
FRICKSON BROS. EXCAVATING ATTEST:
(for individual or partnership)
Contractor Name
By: �6�Xii/ 0 VAA
Robert D. Frickson, Owner
CITY OF WATERLOO
By:
alst
rnest G. Clark, Mayor
By:
ATTEST:
By:
Suzy Sch4res, City Clerk
AGR-2
CITY OF WATERLOO
GO - DEMOLITION PROGRAM
BASE BID
MAIN BUILDING
STREET ADDRESS STORY HGT. & TYPE BASEMENT
ITEMIZED UNIT PRICE SCHEDULE GROUP NO. 172-D-GO-04-18-11
OTHER
BUILDINGS
233 Ash Street
1 'A Story (352 SF)
Additions: 1 Story (490 SF)
Fencing & volunteer trees along fence lines
Old clothes line/posts
Full "0" Finished
None
NET
BID PRICE
$6,300.00
325-27 Clay Street
1 Story Frame (1299 SF)
Additions:
1 Story Masonry (120 SF)
Sidewalk leading to South entrance
Retaining walls
Garage (240 SF)
Shed (234 SF)
$9,000.00
1121 South Street
1 1/2 Story Frame (816 SF)
Yard waste & debris, wooden
Structure next to shed
Full "0" Finished Area Shed (?? SF)
$7,400.00
1309 W. 2nd Street
2 Story (572 SF)
Yard debris, clothesline
Full "0" Finished Area Shed (24 SF) $9,500.00
720 W. Park Street
2 Story Frame (912 SF)
Volunteer trees & yard debris
Full "0" Finished Area Garage & attachment $9,300.00
(504 SF) & (240 SF)
411 Wellington St.
2 Story Frame (672 SF)
Additions:
1 Story Frame (374 SF)
Fence & volunteer growth
Picnic table and yard debris
Full "0" Finished Area None $7,500.00
425 Clay Street
2 Story Frame (998 SF) Full "0" Finished Area None $9,700.00
Additions:
1 Story Frame (108 SF)
1 Story Frame (232 SF)
1 Story Frame (18 SF)
121 Cutler Street
2 Story Frame (912 SF) Full "0" Finished Area None $8,800.00
Volunteers trees w/n 3 feet of house
Driveway approach, sidewalk approach
1555 Newell St. N/A
N/A
Garage (216 SF) $1,400.00
320 E. 1 St. Street
1 1/ 2 Story Frame (328 SF) Full "0" Finished None $5,500.00
Volunteer Tree Growth
326 Center Street
2 Story Frame (912 SF) Full "0" Finished Area Garage (240 SF) $7,200.00
BASE BID TOTAL $81,600.00
ALTERNATES:
715 Vinton St. 1 Story Frame (698 SF) Full "0" Finished Area None $ 8,300.00
ALTERNATES TOTAL: $ 8,300.00
BASE + ALT. BID TOTAL $89,900.00
BF-4 (1)