Loading...
HomeMy WebLinkAboutAECOM - ALO 2023 CSVI IDOT Proj. No. 9I230ALO200 - 2.6.2023AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com FY 2023 COMMERCIAL SERVICE VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91230AL0200 IDOT CONTRACT NO. CNTRT-00004606 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment Scope of Services - See Attachment Compensation Compensation for services for this project shall be on a cost-plus fixed fee basis not to exceed Eighteen Thousand Two Hundred Dollars ($18,200.00). See attached Exhibit B, Consultant Cost Summary. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. CATS") and the City of Waterloo ("Client") dated February 4, 2020. APPROVED: APPROVED: CITY OF WATERLOO, IOWA AECOM TECHNICAL SERVICES, INC. By By r • •4,eie61 Quentin M. Hart, Mayor Douglas W. Schindel, P.E. Date 2/6/2023 Vice President Date January 20, 2023 SCOPE OF SERVICES FY 2023 COMMERCIAL SERVICE VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91230ALO200 IDOT CONTRACT NO. CNTRT-00004606 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA I. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2023 Vertical Infrastructure Projects. Projects identified in the grant include the following: Project will include the replacement of the HVAC systems in the shop areas within the hangar, north and south of the hangar area, and tuck point and paint of the exterior of the hangar concrete block. II. Scope of Services The work to be performed by ATS includes the following tasks: 1. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and HVAC system information will be compiled as background information for the project. Consultant will complete visual survey, investigation and photographic documentation of their existing conditions. 2. Final Design. This task consists of the preparation of the final bid documents for this project, including specifications, drawings (as required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications. This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost. This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance. This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. Project will be bid as two separate bid packages. 7. Bid Document Interpretation. This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review. This task consists of limited on -site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\Secure DCS\Administration\AGREE\PROFWLO 2023 IDOT CSVI.doc 2023 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa IDOT PROJECT NO. 91230ALO200 Engineering Services Consultant Cost Summary Direct Labor Cost Exhibit B Category Hours Rate/Hour Amount Senior Professional 10 $99.80 $998.00 Project Professional 48 $76.65 $3,679.20 Staff Professional 20 $55.50 $1,110.00 Professional 0 $33.60 $0.00 CADD Operator II 8 $39.05 $312.40 CADD Operator I 0 $26.30 $0.00 Senior Technician 0 $44.70 $0.00 Technician 0 $31.60 $0.00 Project Support 12 $37.85 $454.20 $6,553.80 98 Payroll Burden and Overhead Costs 128.43% $8,417.05 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 800 0.625 500.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 1,000 0.06 60.00 Color Copies 1,000 0.22 220.00 Plan Copier 100 0.50 50.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 200.00 IV. AECOM Estimated Actual Costs V. Subcontract Expense VI. Estimated Actual Costs VII. Fixed Fee (15% of Items I & II) Rounded VIII. Maximum Amount Payable Rounded $1,030.00 $16,000.85 $16,000.00 $0.00 $16,000.00 $2,200.00 $18,200.00 Exhibit B 2023 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa IDOT PROJECT NO. 91230ALO200 Engineering Services Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof Prof CADD Operator 11 CADD Operator 1 Senior Technician Technician Project Support Totals 1 Data Collection & Review 4 4 8 2 Project Plans 24 8 32 3 Project Specifications 8 8 16 4 Estimate of Construction Cost 4 4 5 Quality Review 4 4 6 Bid Assistance 4 2 6 7 Bid Document Interpretation 4 4 8 Resident Review 16 16 9 Construction Administration 2 4 2 8 Total Design Services 10 48 20 0 8 0 0 0 12 98