HomeMy WebLinkAboutK&W Electric - CO #3 Dam Lighting Project Cont. No. 1054 - 2.20.2023CHANGE ORDER
N Kevin Ivtartin, K&W Electric
El Janie Knutson, City of Waterloo
PROJECT: 4th Street Bridge Dam & Lighting CO No.: 03
OWNER: City of Waterloo, Contract 1054 DATE OF .ISSUANCE: 02/02/23
TO: Kevin Martin FROM:
K&W Electric, Inc. RITLAND+KUIPER Landscape Architects
1127 Lincoln Street 501 Sycamore Street, Mezzanine A
Cedar Falls, IA 50613 Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Added cost for labor, equipment, and materials to create communication and control of
RiverLoop Amphitheater lighting in coordination with fighting system on the 4"' Street
Pedestrian bridge. Includes installing the antenna outside, the controller inside, power to
the controller, cabling between the antenna and the controller, and the DMX cabling,
power supply, and control infrastructure.
Attachments:
$ 4,000.00
TOTAL ADD TO CONTRACT $ 4,000.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time,
The original Contract Stun was ... $749,772.30
Net change by previously authorized Change Orders ($57,000.00)
The Contract Suin prior to this Change Order was $692,422.30
The Contract Sum will be (increased) by this Change Order $4,000.00
The new Contract Sum including this Change Order will be $696,422.30
The Contract Time will be (extended) (120 ) Days
RI TLAND+KU1PER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEED AP
K&W El
CONTRA
signs. urc
Kevin Martin
ric, Inc,
Signature
Quentin Hart, Mayor