HomeMy WebLinkAboutStanley Consultants Supplement Agreement No. 4 - Contract 1013 - 2.20.2023SUPPLEMENTAL AGREEMENT NO. 04 This Supplemental Agreement, made and entered into by and between STANLEY CONSULTANTS, INC. (Consultant) and CITY OF WATERLOO (Client) amends their agreement of September 23, 2019, for Consultant to provide services to the Client for the Feasibility Study for Replacement of Park Avenue and 11th Street Bridges over the Cedar River, as follows: Scope of Services This Supplemental Agreement is for supplemental archaeological phase 1 investigation at the 11th Street Bridge and memorial/historical marker interpretation materials at the Park Avenue Bridge and project management, administration, and coordination. Refer to attachment Exhibit 1 — Scope of Services. Time of Beginning and Completion March 11, 2022, through December 31, 2023 Fees and Payments Original Professional Services Agreement Supplemental Agreement No. 1 Supplemental Agreement No. 2 Supplemental Agreement No. 3 $505,000.00 $28,643.00 $1, 043, 000.00 $1,945,600.00 Task Compensation Supplemental Archaeological Phase 1 Investigation at the 11th Street Bridge Memorial/Historical Marker Interpretation Materials at the Park Avenue Bridge Management, Administration & Coordination Supplemental Agreement No. 4 - Subtotal Amount $6,891.00 $3,730.00 $3,195.00 $13,816.00 New Total Contract Amount $3,536,059.00 Except as specifically amended by this Supplemental Agreement, all the terms and conditions of the original Agreement dated September 23, 2019, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Supplemental Agreement to be executed on the date below indicated. STANLEY CONSULTANTS, INC. CITY OF WATERLOO By: Daniel R. Fullerton, P.E. Client Service Manager Date: 01 /31 /2023 Attest: By: j Wendy Diekema By: Date: Attest: By: Qtte/ 'z 9-tarE 2/20/2023 Kerrey FeCcICe SIGNED City_of_Waterloo_lowa\29363 - 11th and Park Ave Bridge Replacements\01-Contracts\SA4_CityofWaterloo_ParkAvel lthStBridges.docx SC3881 1014 COST PROPOSAL AND SCOPE OF WORK SUBMITTED BY: TALLGRASS ARCHAEOLOGY LLC, IOWA CITY, IOWA 2460 S. RIVERSIDE DRIVE, IOWA CITY, IA 52246 SUBMITTED TO: STANLEY CONSULTANTS, DES MOINES, IOWA 50309 March 11, 2022 PROJECT : SUPPLEMENTAL ARCHAEOLOGICAL PHASE IINVESTIGATION FOR THE II TH STREET BRIDGE PROJECT, CITY OF WATERLOO, IOWA LABOR TOTAL $ 5,765 EXPENSES TOTAL $ 1,126 GRAND TOTAL $ 6,891 [costs may be shifted within budget to reflect actual labor & receipts.] Scope of Work - SUPPLEMENTAL Archaeological Phase I Investigation. This investigation will examine to the Phase I level a new area supplemental to the original 11th Street Bridge APE that will encompass a proposed temporary driveway for the Midwest Pattern Co where it extends outside of the previously -surveyed APE (see attached maps). It is anticipated that the fieldwork will take two days and will involve intensive subsurface testing (shovel/auger tests to a maximum of 1 meter below the current ground surface) wherever possible and where needed to address the presence/absence of archaeological sites. The testing interval is proposal for 10 meters since it is anticipated that at least one historic house site will be encountered. There is also potential for a precontact component in this area as well. The state guidelines for Phase I intensive survey as approved and revised by the AIA in October 2021 will be followed for both the fieldwork and the report stages of the project. Schedule - the fieldwork will commence as soon as possible after a notice to proceed but dependent on the ground being thawed in order to meet the AIA guidelines for adequate field conditions. A summary report can be submitted within 20 business days or less following the end of the fieldwork. Note - the above proposal is considered a not -to -exceed cost estimated. 1 Aerial map showing supplemental area to be surveyed (green outlined/shaded with extension into previous survey area outlined in yellow dashes) Previous Phase I survey area (needing no further investigation) is magenta outlined/shaded. The currently proposed supplemental survey will focus on the green outlined/shaded area only. 2 Plan map showing supplemental area (red outlined) 3 iirr#1161 TALLGRASS ARCHAEOLOGY COST PROPOSAL and SCOPE OF WORK Submitted by: Tallgrass Archaeology LLC 2460 S. Riverside Drive, Iowa City, Iowa 52246 Submitted to: Stanley Consultants/City of Waterloo, Iowa 1/18/2023 Project: Park Avenue Bridge Memorial/Historical Marker Interpretation Materials, City of Waterloo, Black Hawk County Tallgrass Archaeology LLC can complete this project for $3,730.45. The total is a LUMP SUM price and shall not be exceeded within the scope of work described below. Labor Costs: Non -Labor Expense Costs: Total Labor and Expenses: $ 3,655.45 $ 75.00 $ 3,730.45 Scope of Work: Tallgrass Archaeology LLC will compile a document that contains the following items: three separate designs for two different signs (6 designs total); a summary/discussion of each sign; and potential ideas for salvage and display of any architectural components/artifacts that may be reliably used in this interpretation. These items will interpret the historical and architectural significances of the former Park Avenue Bridge in Waterloo, Black Hawk County, Iowa. They will include historic photographs or other graphics as necessary. Sign designs may incorporate the ideas and suggestions that were discussed at the previous conference call. Tallgrass Archaeology LLC proposes that submission of the following deliverables be no later than April 30, 2023: • 1 digital copy of a document summarizing the signage, designs, ideas, and potential uses • 1 digital file of each sign design (6 total) Additional Services Any professional service not included or mentioned in this agreement are considered additional services. Additional services, if approved or requested by the client, will be performed at the hourly rate utilized by this budget, available upon request. Billing: The Client will compensate Tallgrass Archaeology LLC for the above quoted cost upon submission of deliverable materials and receipt invoice. Payment to be made within 30 days from receipt of invoice. 1