Loading...
HomeMy WebLinkAboutModern Builders - CO#1 - Hangar No. 4 Renovations - 3.20.2023CHANGE ORDER NO. 1 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Project: Hangar No. 4 Improvements (2022) Owner's Contract No. IDOT CSVI Project No. 9I220AL0200 IDOT Contract No. 3345 Contractor: Modern Builders, Inc. Date of Contract Start: October 11, 2022 Date: March 6, 2023 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 101 ADA Restroom Modifications LS $3,061.30 1 $ 3,061.30 Total Change Order $ 3,061.30 Reason for Change Order: 101 — Access to restroom to be provided by the following items: Demo stud wall Create opening in block wall for new doorway Infill block opening with wood Install wood door into framed opening (using salvaged door) Infill old door location with wood Sheetrock Openings IDOT Contract No. 3345 CO-1 IDOT CSVI Project No. 9I220AL0200 1 CONTRACT PRICE Original: $ Previous C.O.s (DEDUCT):$ 157,368.00 0.00 This C.O. (ADD): $ 3,061.30 Contract Price with all approved Change Orders: $ 160,429.30 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 180 0 0 180 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: 3 l ±---- Engineer (Authorized Signature) APPROVED: Qcter l U� °smxeo By: Owner (Authorized Signature) ACCEPTED: By: Contractor (Authorized Signature) March 7, 2023 Date 3/20/2023 Date Date IDOT Contract No. 3345 CO-1 IDOT CSVI Project No. 9I220AL0200 2