HomeMy WebLinkAbout2023-176-03.20.2023Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street,
Waterloo, IA 50703, (319) 291-4323.
RESOLUTION NO. 2023-176
RESOLUTION APPROVING ENGINEERING DEPARTMENT
FEE SCHEDULE FOR STREET REPAIRS FOLLOWING
EXCAVATIONS.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, that
the Engineering Department Fee and Street Repair Schedule in the City of Waterloo are hereby
approved as follows:
See Attached Exhibit "A"
PASSED AND ADOPTED this 20th day of March 2023.
Ray Feuss, Mayor Pro Tem
ATTEST:
Kelley Eelchle
Kelley Felchle, City Clerk
SEAL
0
Resolution No. 2023-176
Page 2
EXHIBIT "A"
Proposed 2023 Street Repair Unit Costs
Item
Thickness
Old 2622
New 2023
Unit
m
U
6"
$ 52.00
$ 104.0D
SY
7"
$ 55.00
$ 110.06
SY
8"
$ 58.00
$ 116.46
SY
9"
$ 51.00
$ 122.0D
SY
10"
$ 54.00
$ 128.0D
SY
12"
$ 72.00
$ 144.0D
SY
42)
o
Li
a
u
cc
6"
$ 52.00
$ 130.06
SY
7"
$ 55.00
$ 137.56
SY
S"
$ .58.00
$ 145.06
SY
9"
$ 51.00
$ 152.56
SY
10"
$ 54.00
$ 160.06
SY
12"
$ 72.00
$ 180.06
SY
Hot Mixed Asphalt
2"
$ 20.00
$ 40.0D
SY
4"
$ 37.00
$ 74.06
SY
6"
$ 56.00
$ 112.06
SY
7.5"
$ 84.00
$ 168.06
SY
9"
$ 90.00
$ 1s0.DD
SY
11"
$ 97.00
$ 194.06
SY
C&G
24" Width
6"
$ 35.00
$ 70.06
LF
7.5"
$ 39.00
$ 78.06
LF
9"
$ 42.00
$ 84.0D
LF
12"
$ 47.00
$ 94.06
LF
,�
i c
in 6
4"
$ 47.00
$ 94.06
SY
5"
$ .52.00
$ 104.06
SY
6"
$ 53.00
$ 126.0D
SY
Saw Cutting
$ 6.00
$ 10.86
LF
6" Mod. Subbase
-
$ 28.38
SY
6" RAP Subbase
-
$ 28.92
SY
Topsoil Repairs
-
$ 35.0D
SY
Detectable Warning
-
$ 60.06
SF
Temporary Patch
-
$ 50.06
SY
Mobilization
$ 100.00
$ 100.0D
EA
Traffic Control
-
$ 50.06
EA
Removed Items
fi" Rock Base
$ 16.50
-
Chip Sealing
$ 27.50
-
t