Loading...
HomeMy WebLinkAbout2023-176-03.20.2023Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo, IA 50703, (319) 291-4323. RESOLUTION NO. 2023-176 RESOLUTION APPROVING ENGINEERING DEPARTMENT FEE SCHEDULE FOR STREET REPAIRS FOLLOWING EXCAVATIONS. BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, that the Engineering Department Fee and Street Repair Schedule in the City of Waterloo are hereby approved as follows: See Attached Exhibit "A" PASSED AND ADOPTED this 20th day of March 2023. Ray Feuss, Mayor Pro Tem ATTEST: Kelley Eelchle Kelley Felchle, City Clerk SEAL 0 Resolution No. 2023-176 Page 2 EXHIBIT "A" Proposed 2023 Street Repair Unit Costs Item Thickness Old 2622 New 2023 Unit m U 6" $ 52.00 $ 104.0D SY 7" $ 55.00 $ 110.06 SY 8" $ 58.00 $ 116.46 SY 9" $ 51.00 $ 122.0D SY 10" $ 54.00 $ 128.0D SY 12" $ 72.00 $ 144.0D SY 42) o Li a u cc 6" $ 52.00 $ 130.06 SY 7" $ 55.00 $ 137.56 SY S" $ .58.00 $ 145.06 SY 9" $ 51.00 $ 152.56 SY 10" $ 54.00 $ 160.06 SY 12" $ 72.00 $ 180.06 SY Hot Mixed Asphalt 2" $ 20.00 $ 40.0D SY 4" $ 37.00 $ 74.06 SY 6" $ 56.00 $ 112.06 SY 7.5" $ 84.00 $ 168.06 SY 9" $ 90.00 $ 1s0.DD SY 11" $ 97.00 $ 194.06 SY C&G 24" Width 6" $ 35.00 $ 70.06 LF 7.5" $ 39.00 $ 78.06 LF 9" $ 42.00 $ 84.0D LF 12" $ 47.00 $ 94.06 LF ,� i c in 6 4" $ 47.00 $ 94.06 SY 5" $ .52.00 $ 104.06 SY 6" $ 53.00 $ 126.0D SY Saw Cutting $ 6.00 $ 10.86 LF 6" Mod. Subbase - $ 28.38 SY 6" RAP Subbase - $ 28.92 SY Topsoil Repairs - $ 35.0D SY Detectable Warning - $ 60.06 SF Temporary Patch - $ 50.06 SY Mobilization $ 100.00 $ 100.0D EA Traffic Control - $ 50.06 EA Removed Items fi" Rock Base $ 16.50 - Chip Sealing $ 27.50 - t