Loading...
HomeMy WebLinkAboutMidwest Playscapes - Purchase Agreement (Quote) - 4.3.2023■ MIDWEST PLAYSCAPES 8632 Eagle Creek Circle, Savage, MN 55378 www.MIDWESTPLAYSCAPES.com Quotation direct: 952.895.8888 fax:952.895.8889 toll free: 800.747.1452 playscapes@earthlink.net r-+_ BITTER BYSIriassismiAB®J Project: Gates Park Turf Sourcewell ID #'s Phone: 319-991-4370 Contact: Travis Nichols Waterloo - ID# 2491 Fax: Ship To: 820 E Donald St, ForeverLawn Sourcewell # 031622-FVL Bill To: City of Waterloo Waterloo, IA 50703 715 Mulberry St Email: TRAVIS.NICHOI SCa?waterlao-in.orq Waterloo, IA 50703-5783 Shipping Contact: Travis Nichols Date: 3/16/23 Qty Design/Item # Description Unit Price Total Surfacing 11,537 Square Feet ForeverLawn Playground Grass Ultra $97,905.60 255 Pannels of 1-inch SafetyFoam Pro $3,159.45 1,438 Pannels of 2-inch SafetyFoam Pro $33,922.22 158 Pannels of 3-inch SafetyFoam Pro $5,242.44 1 Cost of perimeter boards, installation of 12,945 sq. ft.Playground Grass Ultra, 1-inch, 2-inch and 3- inch safety pad, crumb rubber infill and supplies - seam tape, glue, etc. $82,505.69 ForeverLawn Sourcewell # 031622-FVL Excavation of area, purchasing and installation of aggregate base and concrete to be provided b1 **Weather must be 45 degrees or above to install ForeverLawn products*** Turf Price Does Not Include Sub Base Aggregate or Concrete Subtotal $222,735.40 Freight Tax Exempt # * Please provide certificate Sales Tax Local Sales Tax Total $222,735.40 NOTE Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge NOTE UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30 A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days afier the shipment of materials. Equipment shall be invoiced seperately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled.Please allow 3to4 weeks for delivery afier receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. Ifproduct is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us. Signed: Querltal 9-(a1 Accepted Date: 4/3/2023 Printed Name: Quentin Hart