HomeMy WebLinkAboutLodge Construction - FY21 Wesdate Bioswale, CO #4 - 5.1.2023CITY OF WATERLOO, IOWA CHANGE ORDER NO. 4 PROJECT: F.Y. 2021 WESTDALE BIOSWALE CONTRACT NO. 997 Date Prepared: APRIL7, 2023 AMOUNT: $66,570.00 INCREASE TO: LODGE CONSTRUCTION INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated July 6, 2021. A. Description of change to be made or extra work to be done: Increase in contract to repair channel due to repair areas that were found to not function well. B. Reason for ordering change or extra work: The project did not function as designed after experiencing high-water events. Repairs to the bioswale included removal of sedimentation from stormwater routing around the retaining walls, installation of seeding and erosion control blanket, installing Flex Mat on the bottom of the forebay, added streambank protection where erosion had occurred, and installing rip rap on the streambank in various Locations. C. Settlement for cost of work to be made as follows: Bid Item 4000 4001 4002 4003 4004 4005 4006 4007 Item Description Turf Reinforcement Mat Erosion Control Blanket Flex Mat for Forebay Bottom Excavation and Regrading Rip Rap along Streambank Engineering Fabric under Rip Rap Flowable Mortar over rock at Retaining Walls Reseeding Urban Area Unit Sq Yds Sq Yds Sq Ft Cu Yds Tons Sq Yds Lump Sum Acre Qty. Incr. 496 5,400 2,500 100 20 150 1.0 0.5 Bid Price $20.00 $4.00 $9.90 $9.00 $105.00 $5.00 Item Price $9,920.00 $21,600.00 $24,750.00 $900.00 $2,100.00 $750.00 $2,800.00 $3,750.00 Total Increase $66,570.00 $2,800.00 $7,500.00 Quertfia 9- it BY: „ 5/1/2023 Mayor ATTEST: Kerley Ferch(e au 5/1/2023 TOTAL INCREASE $66,570.00 LODGE CONSTRUCTION INC. Date CONTRACTOR City Clerk BY: TITLE: Date Date APPROVED: City Engineer Date CO #4 Contract No. 997 Sheet 1 of 1