HomeMy WebLinkAboutMidAmerican - Refundable Advance for Speculative Use - 5.1.2023MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream some .
April 13, 2023
City of Waterloo
Attn: Noel Anderson
noel.anderson@aterloo-ia.org
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
Reference: Electric distribution to serve future development(s) along Warp Dr., Waterloo,
IA. WMIS: 3006919 — City Portion
Dear Noel:
We are pleased to submit the Refundable Advance for Construction Underground
Electric Service Extension Proposal for Speculative Use for the above project. This
proposal is valid for 90 days and if MidAmerican Energy construction has not
commenced within 12 months it may be voided.
Please sign and return the proposal as soon as you are ready to commit to the work. You
may withhold payment until 30 days before MidAmerican Energy Company is ready to
schedule the work. In the meantime, please keep me informed of your schedule. After
we have received your payment, we will sign and return a copy of the proposal for your
records.
If you have any questions, please call me at (515) 252-6701.
Sincerely,
MidAmerican Energy Company
Wk Amy
Amy M Adams
Customer Project Coordinator
Enclosures
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream some .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
REFUNDABLE ADVANCE FOR CONSTRUCTION
UNDERGROUND ELECTRIC DISTRIBUTION EXTENSION PROPOSAL
FOR SPECULATIVE USE — WMIS: 3006919 — City Portion
MidAmerican Energy Company, an Iowa corporation and the City of Waterloo
("Applicant"), agree as follows:
1. MidAmerican Energy Company will extend its electric lines underground to serve
3PHS to future development(s) along Warp Dr., Waterloo, IA as shown on the
attached drawings.
2. MidAmerican Energy Company will furnish the necessary labor and materials
required to fulfill its undertaking, as specified above, and will commence such work
as soon as reasonable and practicable after the execution of this Proposal and receipt
of Applicant's cash deposit indicated below and will prosecute such work to
completion with reasonable diligence.
3. In consideration of the receipt of a payment in the amount of $18,594.73 which is
a refundable Advance for Construction, MidAmerican Energy Company agrees to
construct necessary electric facilities as set forth above. Please submit payment
with Applicant's signed acceptance of this Proposal. If MidAmerican Energy
Company is required to work during the winter construction season, Applicant
agrees to pay an additional sum of $4.93 per trench foot as a refundable Advance
for Construction for all required trenching.
4. This section refers to any connection made to the primary line extension.
Pursuant to MidAmerican Energy Company's electric tariff, Refundable Advances
are paid by the customer prior to construction, and may be refunded in whole or in
part based upon the following terms and conditions.
a. Refundable Advance shall be subject to refund to the Applicant for a ten-
year period from the date of the original Refundable Advance payment.
b. Refundable Advance shall not accrue interest.
c. Refunds shall be made annually on or about the anniversary date of the
original advance payment.
d. Annual refunds will be based on the number of new customers at the
identified lots that have directly connected to the electric distribution
expansion in the prior year. The amount refunded will be equal to the
estimated three-year base revenue from those customers less any additional
costs to extend service to them. Base revenue is equal to estimated annual
MidAmerican
ENERGY
OBSESSIVELY, RELENTLESSLY AT ream swim .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
revenue, less fuel expenses and energy efficiency cost recovery charges,
based on revenue received from similarly situated customers. Base revenue
amounts to be applied to new customers are re -estimated each year using
the most current information available, and may adjust upward or
downward depending on the circumstances.
e. No refunds shall be made for revenue received after ten (10) years from the
date of the original advance payment.
f. At no time shall the total of refunds exceed the original Refundable
Advance payment.
g. No refunds shall be made for customers served from a further extension of
the above described electric line extension. Distribution System Expansions
without end -user attachments shall not be eligible for refunds unless the
following circumstances are met: If a Distribution System Expansion
connected during the ten year period off of an already existing Distribution
System Expansion, the Revenue Credit shall be applied to the new
Expansion first. Any Revenue Credit remaining shall be applied to the
connected existing Expansions provided that they have not received a full
reimbursements for its Refundable Advance and are within the ten year
attachment period. The Revenue Credit will continue to apply to connected
existing Expansions until the Revenue Credit is either exhausted, the ten
year attachment period has closed, or all Refundable Advances have been
reimbursed in full. Total refunds for any Expansion shall not exceed the
original Refundable Advance.
5. Except as may hereinafter be provided, MidAmerican Energy Company shall:
a. Not tamp the backfill. Applicant agrees to indemnify and hold
MidAmerican Energy Company harmless from any and all damages
that may result from the non -tamping of backfill operations
conducted by MidAmerican Energy Company. In case any action
is brought against MidAmerican Energy Company, or any of its
agents or employees, relative to such backfill operations, the
Applicant shall assume full responsibility for the defense thereof.
Upon failure to do so on proper notice, MidAmerican Energy
Company reserves the right to defend such action and charge all
costs to the Applicant provided, however, that nothing herein shall
be construed as an assumption of liability by the Applicant for
damages and claims attributable to MidAmerican Energy Company
negligence.
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream swim .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
6. Applicant shall provide, without cost to MidAmerican Energy Company, such
easements as are necessary and incidental to such installation and use of
MidAmerican Energy's facilities on private property within the area served. If a 3ra
party easement is required any cost associated in obtaining the easement will be
paid by the applicant.
7. Pursuant to MidAmerican's tariff, the Applicant is required to pay actual permit
fees. Permit fees may not be offset by Revenue Credit and are to be paid regardless
of whether the applicant is required to pay a Refundable Advance or a
Nonrefundable Contribution.
8. Applicant shall be responsible for complying with all aspects of compliance as
required by any local, state, or federal permit or plan associated with storm water
pollution prevention or erosion control. It is specifically understood and agreed
that MidAmerican Energy Company is providing the service requested by the
Applicant solely for the Applicant. MidAmerican Energy Company will not
become or agree to become a co-permittee or operator for the purpose of applicants'
compliance with any local, state or federal permit or plan associated with storm
water pollution prevention or erosion control.
9. Applicant shall be responsible for locating and marking all privately owned systems
such as water services, culverts, irrigation systems, drainpipes, septic lines, and
underground wiring before MidAmerican Energy Company's construction.
10. It is specifically understood and agreed that any distribution systems, or other
facilities constructed or installed by MidAmerican Energy Company under terms
of this Proposal shall remain the sole property of MidAmerican Energy Company
and MidAmerican Energy Company shall determine, as its own judgment indicates,
the manner and method of utilization thereof and to extend the same or connect
other facilities there to and serve other customers there from as it shall see fit,
subject only to such obligations as MidAmerican Energy Company shall have
assumed in this Proposal; and no other person shall have any right, title, interest or
claim, in or to the said distribution system or other facilities by virtue of any
provision of this Proposal.
11. Applicant shall furnish, install, own and maintain all 4-inch ducts as shown on
attached prints. All ducts shall be black w/red stripe or grey in color, PVC type
schedule 40 or schedule 40 HDPE coil -able. Applicant shall install ducts a
minimum of forty-two (42) inches and a maximum of forty-eight (48) inches below
finish grade with capped and staked ends and equipped with pull wires.
MidAmerican Energy Company will provide marker balls for the duct ends. These
are available at MidAmerican Energy Company's storeroom. Applicant is
responsible for correct placement and depth of conduit. Note: No more than ten
(10) conduits allowed within the secondary compartment of the transformer
pad.
MidAmerican
ENERGY
OBSESSIVELY, RELENTLESSLY AT YOUR SERVICE.
Proposed this 13th day of April, 2023
MIDAMERICAN ENERGY COMPANY
By:
Title:
APPLICANT:
6 uertEin J La L [o
By:
Title: Mayor
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
LONETREE RD
cc
w
w
w
uJ
WARP DR
93-1-1008
1!u AL PAM
Mount cutout and riser
Pull 725' of 1/0 UG 3phs primary
thru 4" duct from pole
CIRCUIT
93-1-1008
MIDAMERIC 1 Cust: TOP NOTCH TILE AND CONSTRUCTION
EN ER Y COMPANY. Addr: 180 WARP
Crew HQ: WAT City: WATERLOO
DR
X=1932487 Y = 935045
r
W MS_REV:3006919-1
Date: 4/5/2023
Scale: 1 IN = X FT
Designer:DAVIS,SHANE M
Job Desc PRIMARY EXTENSION WITH UG XFMR. 3PH 120/208 200A. TOP NOTCH TILE AND CONSTRUCTION
DISCLAIMER OF LIABILITY
NOTE. This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company. Further, MidAmerican
Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury, death and property damage, resulting from any authorized or unauthorized use
of, or reliance upon, this drawing for any purpose.