Robinson Engineering Company
Consulting Engineers
Westdale Subdivision Swale Design
Waterloo, Iowa
Addendum No. 7
WHEREAS, City of Waterloo and Robinson Engineering Company entered into a contract dated July 30,
2018 for the design of the Westdale Subdivision Swale in Waterloo, Iowa.
WHEREAS, City of Waterloo and Robinson Engineering Company desire to amend the previous
agreement to make the following revisions to the contract.
NOW THEREFORE, it is mutually agreed to amend the original Consultant Agreement as follows:
I. Scope of Services
The scope of services is amended to add the cost for design of modifications to the plans and the
inspection associated with construction of those modifications.
II. Compensation
The additional work will be completed for the following costs:
Design Modifications = 32 hrs @ $115.00
Construction Inspection = 50 hrs @ $115.00/hr
Completion of As -built Plans = 40 hrs @ $115.00/hr
Construction Paperwork = 40 hrs @ $115.00/hr
Walkthrough with IaDNR = 20 hrs @ $115.00/hr
Total Cost
$3,680.00
$5,750.00
$4,600.00
$4,600.00
$2,300.00
$20,930.00
The compensation for this supplemental agreement is to be integrated with that covered under the
original contract.
III. In all other respects, the obligations of City of Waterloo and Robinson Engineering
Company shall remain as specified in the Original Contract dated July 30, 2018, and all
addendums.
IN WHITNESS WHEREOF, the parties hereto have executed this Addendum No. 7 as of the dates shown
below.
OWNER: Quertutz ENGINEER: i . ,�
City of Waterloo Robinson Engineerg Company
By: Quentin M. Hart By: Monica Smith, PE
Title: Mayor Title: President
ATTEST: xeOEey �FeCdz(e
Kelley Felchle, CMC
City Clerk