Loading...
HomeMy WebLinkAboutRobinson Engineering - Westdale Bioswale - Addendum 7 - 5.1.2023Ns Robinson Engineering Company Consulting Engineers Westdale Subdivision Swale Design Waterloo, Iowa Addendum No. 7 WHEREAS, City of Waterloo and Robinson Engineering Company entered into a contract dated July 30, 2018 for the design of the Westdale Subdivision Swale in Waterloo, Iowa. WHEREAS, City of Waterloo and Robinson Engineering Company desire to amend the previous agreement to make the following revisions to the contract. NOW THEREFORE, it is mutually agreed to amend the original Consultant Agreement as follows: I. Scope of Services The scope of services is amended to add the cost for design of modifications to the plans and the inspection associated with construction of those modifications. II. Compensation The additional work will be completed for the following costs: Design Modifications = 32 hrs @ $115.00 Construction Inspection = 50 hrs @ $115.00/hr Completion of As -built Plans = 40 hrs @ $115.00/hr Construction Paperwork = 40 hrs @ $115.00/hr Walkthrough with IaDNR = 20 hrs @ $115.00/hr Total Cost $3,680.00 $5,750.00 $4,600.00 $4,600.00 $2,300.00 $20,930.00 The compensation for this supplemental agreement is to be integrated with that covered under the original contract. III. In all other respects, the obligations of City of Waterloo and Robinson Engineering Company shall remain as specified in the Original Contract dated July 30, 2018, and all addendums. IN WHITNESS WHEREOF, the parties hereto have executed this Addendum No. 7 as of the dates shown below. OWNER: Quertutz ENGINEER: i . ,� City of Waterloo Robinson Engineerg Company By: Quentin M. Hart By: Monica Smith, PE Title: Mayor Title: President ATTEST: xeOEey �FeCdz(e Kelley Felchle, CMC City Clerk 819 Second Street NE, Independence, IA 50644 Phone: 3 l 9-334-7211