Loading...
HomeMy WebLinkAbout26432-07.23.1979 RESOLUTION NO. 26432 RESOLUTION APPROVING 1.ND ACCEPTING THE STATEMENT DATED JULY 12 , 1979 ,FROM BRICE , PETRIDES , AND ASSOCIATES , INC . , ENGINEERS , FOR ENGINEERING SERVICES FOR DESIGN OF DRY RUN CREEK FLOOD CONTROL WORKS , CONTRACT NO. 99 , AND AUTHORIZING PAYMENT ACCORDINGLY. WHEREAS , Brice, Petrides , and Associates , Inc . , Engineers , Waterloo, Iowa have rendered engineering services in connection with the Design of Dry Run Creek Flood Control Works , Contract No. 99 in the City of Waterloo, Iowa, and WHEREAS , the amount of the cost for said engineering services , rendered by the said Brice, Petrides and Associates , Inc . , as shown in their statement dated July 12 , 1979 is/$151 , 809 . 05 now, therefore , BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA: That Brice, Petrides , and Associates , Inc . be paid the sum of $151 , 809 . 05 being payment for the statement dated July 12 , 1979 , on said contract for engineering services rendered in connection with the Design of Dry Run Creek Flood Control Works , Contract No . 99 , in the City of Waterloo , Iowa, and the Finance Director, be, and he is hereby, authorized, empowered and ordered to draw a warrant accordingly for said sum and deliver the same to Brice, Petrides , and Associates , Inc . , of Waterloo , Iowa. Passed and adopted this 23rd day of July, 1979 . Leo P . Roott, Mayo 3 ATTEST: /s/ Katherine Gibbs Katherine Gibbs , City Clerk