Loading...
HomeMy WebLinkAboutMidwest Concrete - Final Qty Summary - Cont. No. 1064 - 6.5.2023CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2023 SIDEWALK REPAIR PROGRAM — ZONE 2 CONTRACT NO. 1064 Date Prepared: MAY 22, 2023 AMOUNT: $56,694.00 DECREASE TO: MIDWEST CONCRETE INC , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated OCTOBER 17, 2022 . A. Description of change to be made or extra work to be done: Adjust construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. /2ueft a ai E BY: 6/5/2023 Mayor ATTEST: 'Fefch[e TOTAL DECREASE = $56,694.00 MIDWEST CONCRETE INC Date CONTRACTOR 6/5/2023 City Clerk Date BY: TITLE: Date APPROVED: Y is so. 6/5/2023 City Engineer Date F.Y. 2023 SIDEWALK ASSESSMENT PROGRAM - ZONE 2 FINAL QUANTITY ADJUSTMENT CONTRACT NO. 1064 SIDEWALK ASSESSMENT REPAIRS - ZONE 3 BID ITEM ITEM DESCRIPTION UNIT ORIGINAL BID QTY. FINAL QUANTITY QUANTITY DIFFERENCE CONTRACTOR UNIT PRICE CONTRACTOR BID PRICE EXT. INCREASE / DECREASE 1 R & R PCC SIDEWALK, 4" SF 32,008.20 30,971.4 1,036.8 $ 13.00 $ 416,106.60 $ 13,478.40 2 R & R PCC SIDEWALK, 5" SF 2,930.90 2,904.7 26.2 $ 15.00 $ 43,963.50 $ 393.00 3 R & R PCC SIDEWALK, 6" SF 2,730.20 2,015.4 714.8 $ 17.00 $ 46,413.40 $ 12,151.60 4 R & R PCC SIDEWALK, CLASS "A" SF 2,468.90 740.4 1,728.5 $ 17.00 $ 41,971.30 $ 29,384.50 5 PATCH EACH 12.0 0.0 12.0 $ 5.00 $ 60.00 $ 60.00 6 SIDEWALK CURB LF 60.0 0.0 60.0 $ 111.00 $ 6,660.00 $ 6,660.00 7 CLEAN SIDEWALK EACH 16.0 15.0 1.0 $ 100.00 $ 1,600.00 $ 100.00 8 WATER VALVE ADJUSTMENT EACH 24.0 13.0 11.0 $ 100.00 $ 2,400.00 $ 1,100.00 9 JOINT SEAL LF 15.9 10.6 5.3 $ 5.00 $ 79.50 $ 26.50 10 SIDEWALK REMOVAL SF 1,413.0 0.0 1,413.0 $ 11.00 $ 15,543.00 $ 15,543.00 11 TOPSOIL, OFF -SITE CY 26.2 0.0 26.2 $ 80.00 $ 2,096.00 $ 2,096.00 1001 SIDEWALK REMOVAL SF (1,413.0) 0.0 (1,413.0) $ 11.00 $ (15,543.00) $ (15,543.00) 1002 TOPSOIL, OFF -SITE CY (26.2) 0.0 (26.2) $ 80.00 $ (2,096.00) $ (2,096.00) 1003 SIDEWALK CURB LF (60.0) 0.0 (60.0) $ 111.00 $ (6,660.00) $ (6,660.00) DIVISION TOTALS $ 552,594.30 $ 56,694.00 PAYMENTS: PAY ESTIMATE #1 $ 108,129.38 PAY ESTIMATE #2 $ 89,081.60 PAY ESTIMATE #3 $ 180,153.16 PAY ESTIMATE #4 $ 92,430.16 PAY ESTIMATE #5 $ 1,311.00 RETAINAGE $ 24,795.00 TOTAL PAYMENTS: $ 495,900.30 CHANGE ORDERS: CHANGE ORDER #1 $ (24,299.00) CHANGE ORDER TOTAL $ (24,299.00) ORIGINAL CONTRACT AMOUNT $ 576,893.30 CHANGE ORDER TOTAL $ (24,299.00) REVISED CONTRACT AMOUNT $ 552,594.30 FINAL QUANTITY SUMMARY $ 56,694.00 FINAL CONTRACT AMOUNT $ 495,900.30