HomeMy WebLinkAboutRobinson Engineering - NorthCrossing, Ph3 - Addendum 2 - 6.5.2023Ns
Robinson Engineering Company
Consulting Engineers
North Crossing Regional Planning and Design
Waterloo, Iowa
Addendum No. 2
WHEREAS, City of Waterloo and Robinson Engineering Company entered into a contract dated April 5,
2021 for the design of the North Crossing Regional Planning and Design project in Waterloo, Iowa.
WHEREAS, City of Waterloo and Robinson Engineering Company desire to amend the previous
agreement to make the following revisions to the contract.
NOW THEREFORE, it is mutually agreed to amend the original Consultant Agreement as follows:
I. Scope of Services
The scope of services is amended to add the following scope items to the project:
Traffic Impact Study: A traffic impact study will be completed to meet requirements by the
IaDOT for this area. The study will cover the four (4) proposed access points to be constructed
onto US 63 (Logan Avenue) at Burkhart Street, Heath Street, Olivia Street, and Ralston Road.
This work will include obtaining peak hour traffic counts, crash history, and traffic modeling at
each intersection. A final report will be produced. It will be used to obtain entrance permits for
the four intersections from IaDOT.
II. Compensation
Traffic Impact Study: $12,484.00
Total Additional Compensation = $12,484.00
The compensation for this supplemental agreement is to be integrated with that covered under the
original contract.
III. In all other respects, the obligations of City of Waterloo and Robinson Engineering
Company shall remain as specified in the Original Contract dated April 5, 2021, and all
addendums.
IN WHITNESS WHEREOF, the parties hereto have executed this Addendum No. 1 as of the dates shown
below.
OWNER: ENGINEER:
City of Waterloo Robinson EngineeringCompany
By: Quentin M. Hart By: Monica Smith, PE
Title: Mayor Title: President
ATTEST: Kerrey Fefchfe
Kelley Felchle, CMC
City Clerk
819 Second Street NE, Independence, IA 50644 Phone: 3 l 9-334-7211