HomeMy WebLinkAboutATTACHMENT B - UNIT LABOR AND MATERIAL COSTSLABOR PRICING. All work includes traffic control plans, setup, maintenance and breakdown, compacted backfill, stormwater and erosion control setup, maintenance and breakdown, safety
compliance and soft surface restoration. All cells shown in green shall be completed by the Contractor. All other cells are protected in this form.
Item #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
28
29
30
31
32
33
34
35
36
37
38
39
46
48
50
51
52
53
57
58
60
61
62
63
127
130
131
133
134
138
146
148
149
150
161
162
163
164
***
Item #
177
178
179
180
181
183
196
197
198
202
203
204
206
207
208
209
215
216
219
220
221
222
223
235
236
237
272
273
277
278
284
285
286
287
***
***
WATERLOO ENGINEERING PLAN SUMMARY
Fiber-To-The-Premise - Division 1
Description
UNDERGROUND - BURIED
Directional Bore (0) 1" and (0) 2" and (2) 1.25"
Directional Bore (0) 1" and (0) 2" and (3) 1.25"
Directional Bore (0) 1" and (1) 2" and (0) 1.25"
Directional Bore (0) 1" and (1) 2" and (2) 1.25"
Directional Bore (0) 1" and (1) 2" and (3) 1.25"
Directional Bore (0) 1" and (2) 2" and (0) 1.25"
Directional Bore (0) 1" and (2) 2" and (2) 1.25"
Directional Bore (0) 1" and (2) 2" and (3) 1.25"
Directional Bore (0) 1" and (3) 2" and (0) 1.25"
Directional Bore (0) 1" and (4) 2" and (0) 1.25"
Directional Bore (1) 1" and (0) 2" and (0) 1.25"
Directional Bore (2) 1" and (2) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (2) 1.25"
Directional Bore (1) 1" and (0) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (4) 1.25"
Directional Bore (1) 1" and (1) 2" and (0) 1.25"
Directional Bore (1) 1" and (1) 2" and (2) 1.25"
Directional Bore (1) 1" and (1) 2" and (3) 1.25"
Directional Bore (1) 1" and (2) 2" and (0) 1.25"
Directional Bore (1) 1" and (2) 2" and (3) 1.25"
Directional Bore (2) 1" and (0) 2" and (0) 1.25"
Directional Bore (0) 1" and (0) 2" and (4) 1.25"
Directional Bore (2) 1" and (1) 2" and (0) 1.25"
Bore 6” Casing (Steel)
Bore 6” Casing (PVC)
Bore 8” Casing (Steel)
Bore 8” Casing (PVC)
Deep Bore - Water Crossing
Install Muletape in New Conduit
Bore Rock Adder
Trench Rock Adder
Install #12 AWG Insulated Tracer Wire
Install 5/8"x8' Copper Clad Ground Rod
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top with Test Station
Installation, Underground Fiber Cable - Including Slack (All other fiber)
Installation, Pedestal
Installation, Small Vault, 17” x 30”
Installation, Vault 24" x 36"
Installation, Large Vault 30" x 48"
Installation, Extra Large Vault 48" x 60"
Sawcut, Remove and Replace Asphalt 6" Thick
Sawcut, Remove and Replace Concrete 6" Thick
Sawcut, Remove and Replace Asphalt 8" Thick
Sawcut, Remove and Replace Concrete 8" Thick
Sawcut, Remove and Replace Asphalt 10" Thick
Sawcut, Remove and Replace Concrete 10" Thick
UNDERGROUND - BURIED LABOR TOTAL
SPLICING
Install New Splice Case & Prep Cable
Splicing, Fusion, Single Fiber
Splicing Fusion, Single fiber Pigtail at panel
Testing, OTDR, Uni-Directional, Power Meter Testing
Testing, OTDR, Bi-Directional, Power Meter Testing
Prep cable in PED for NAP
SPLICING LABOR TOTAL
PATCH PANELS AND CABINETS
Install Pad mounted FDH Splitter Cabinet + Site prep and Prefab Vault
Install rack mounted patch panel (Any Size) and tails
Install Wall Mount Fiber Enclosure
Install 7ft Rack for patch panels
PATCH PANELS AND CABINETS LABOR TOTAL
GENERAL
Pull fiber through building
Install 2" Electric Metal Tubing (EMT)
4" Core Bore
2" Building Riser with LB - Up to 10'
GENERAL LABOR TOTAL
LABOR TOTAL
Description
FIBER
12 CT Fiber Cable
24 CT Fiber Cable
48 CT Fiber Cable
96 CT Fiber Cable
144 CT Fiber Cable
288 CT Fiber Cable
FIBER MATERIAL TOTAL
UNDERGROUND
1” HDPE Roll Conduit, Orange – SDR 11
1.25” HDPE Roll Conduit, Orange – SDR 11
2” HDPE Roll Conduit, Orange – SDR 11
Mule Tape
#12 AWG Solid Thhn Insulated Tracer Wire
5/8"x8' Copper Clad Ground Rod
Small Vault, 17” x 30”
Vault, 24" x 36"
Large Vault, 30” x 48”
Extra Large Vault 48" x 60" (Split Lid)
3.5" Dia PVC Round Marker Posts with Orange Dome Top, 8 ft. in length
3.5" Dia PVC Round Locate Posts with Orange "Top Hat", 8 ft. in length with shorting straps
6" SDR 11
8" SDR 11
6" Steel Casing
8" Steel Casing
Ped
UNDERGROUND MATERIAL TOTAL
CLOSURES
FOSC 450 D Closure
D Size splice Tray
Slack Basket for D-Gel Closure
CLOSURES MATERIAL TOTAL
PATCH PANELS AND CABINETS
288F Pad mounted FDH Splitter Cabinet
432F Pad mounted FDH Splitter Cabinet
1x32 Splitter
1x64 Splitter
288 port rack mount panel
Wall Mount Fiber Enclosure
7ft Rack for patch panels
NEMA Enclosure
PATCH PANELS AND CABINETS MATERIAL TOTAL
MATERIAL TOTAL
TOTAL FIBER-TO-THE-PREMISE BID - DIVISION 1
Estimated Quantity
26
3574
97818
0
0
21964
0
49
3687
297
1947230
0
151
2942
0
103717
0
0
4741
0
58
0
59
5
5
4354
5
0
2348491
0
0
2062543
1034
6193
2065
3214765
11631
11
3187
8
105
13751.3333333333
13751.3333333333
13751.3333333333
13751.3333333333
13751.3333333333
13751.3333333333
3532
92276
5040
39312
5040
11631
136
0
0
0
0
0
0
0
Estimate Quantity
818276
672064
474860
315274
676112
258195
2059015
20049
267351
2348491
2062543
1034
11
3187
8
105
6193
2065
1038
4354
1038
1038
11631
3532
7064
3532
129
5
1
145
0
0
0
0
Unit
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
FT
LF
LF
LF
EA
EA
EA
LF
EA
EA
EA
EA
EA
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
FT
LF
EA
EA
Unit
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Unit Price
Unit Price
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LABOR PRICING. All work includes traffic control plans, setup, maintenance and breakdown, compacted backfill, stormwater and erosion control setup, maintenance and breakdown, safety
compliance and soft surface restoration. All cells shown in green shall be completed by the Contractor. All other cells are protected in this form.
Item #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
28
29
30
31
32
33
34
35
36
37
38
39
46
48
50
51
52
53
57
58
60
61
62
63
127
130
131
133
134
138
146
148
149
150
161
162
163
164
***
Item #
177
178
179
180
181
183
196
197
198
202
203
204
206
207
208
209
215
216
219
220
221
222
223
235
236
237
272
273
277
278
284
285
286
287
***
***
WATERLOO ENGINEERING PLAN SUMMARY
Fiber Backbone - Division 2
Description
UNDERGROUND - BURIED
Directional Bore (0) 1" and (0) 2" and (2) 1.25"
Directional Bore (0) 1" and (0) 2" and (3) 1.25"
Directional Bore (0) 1" and (1) 2" and (0) 1.25"
Directional Bore (0) 1" and (1) 2" and (2) 1.25"
Directional Bore (0) 1" and (1) 2" and (3) 1.25"
Directional Bore (0) 1" and (2) 2" and (0) 1.25"
Directional Bore (0) 1" and (2) 2" and (2) 1.25"
Directional Bore (0) 1" and (2) 2" and (3) 1.25"
Directional Bore (0) 1" and (3) 2" and (0) 1.25"
Directional Bore (0) 1" and (4) 2" and (0) 1.25"
Directional Bore (1) 1" and (0) 2" and (0) 1.25"
Directional Bore (2) 1" and (2) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (2) 1.25"
Directional Bore (1) 1" and (0) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (4) 1.25"
Directional Bore (1) 1" and (1) 2" and (0) 1.25"
Directional Bore (1) 1" and (1) 2" and (2) 1.25"
Directional Bore (1) 1" and (1) 2" and (3) 1.25"
Directional Bore (1) 1" and (2) 2" and (0) 1.25"
Directional Bore (1) 1" and (2) 2" and (3) 1.25"
Directional Bore (2) 1" and (0) 2" and (0) 1.25"
Directional Bore (0) 1" and (0) 2" and (4) 1.25"
Directional Bore (2) 1" and (1) 2" and (0) 1.25"
Bore 6” Casing (Steel)
Bore 6” Casing (PVC)
Bore 8” Casing (Steel)
Bore 8” Casing (PVC)
Deep Bore - Water Crossing
Install Muletape in New Conduit
Bore Rock Adder
Trench Rock Adder
Install #12 AWG Insulated Tracer Wire
Install 5/8"x8' Copper Clad Ground Rod
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top with Test Station
Installation, Underground Fiber Cable - Including Slack (All other fiber)
Installation, Pedestal
Installation, Small Vault, 17” x 30”
Installation, Vault 24" x 36"
Installation, Large Vault 30" x 48"
Installation, Extra Large Vault 48" x 60"
Sawcut, Remove and Replace Asphalt 6" Thick
Sawcut, Remove and Replace Concrete 6" Thick
Sawcut, Remove and Replace Asphalt 8" Thick
Sawcut, Remove and Replace Concrete 8" Thick
Sawcut, Remove and Replace Asphalt 10" Thick
Sawcut, Remove and Replace Concrete 10" Thick
UNDERGROUND - BURIED LABOR TOTAL
SPLICING
Install New Splice Case & Prep Cable
Splicing, Fusion, Single Fiber
Splicing Fusion, Single fiber Pigtail at panel
Testing, OTDR, Uni-Directional, Power Meter Testing
Testing, OTDR, Bi-Directional, Power Meter Testing
Prep cable in PED for NAP
SPLICING LABOR TOTAL
PATCH PANELS AND CABINETS
Install Pad mounted FDH Splitter Cabinet + Site prep and Prefab Vault
Install rack mounted patch panel (Any Size) and tails
Install Wall Mount Fiber Enclosure
Install 7ft Rack for patch panels
PATCH PANELS AND CABINETS LABOR TOTAL
GENERAL
Pull fiber through building
Install 2" Electric Metal Tubing (EMT)
4" Core Bore
2" Building Riser with LB - Up to 10'
GENERAL LABOR TOTAL
LABOR TOTAL
Description
FIBER
12 CT Fiber Cable
24 CT Fiber Cable
48 CT Fiber Cable
96 CT Fiber Cable
144 CT Fiber Cable
288 CT Fiber Cable
FIBER MATERIAL TOTAL
UNDERGROUND
1” HDPE Roll Conduit, Orange – SDR 11
1.25” HDPE Roll Conduit, Orange – SDR 11
2” HDPE Roll Conduit, Orange – SDR 11
Mule Tape
#12 AWG Solid Thhn Insulated Tracer Wire
5/8"x8' Copper Clad Ground Rod
Small Vault, 17” x 30”
Vault, 24" x 36"
Large Vault, 30” x 48”
Extra Large Vault 48" x 60" (Split Lid)
3.5" Dia PVC Round Marker Posts with Orange Dome Top, 8 ft. in length
3.5" Dia PVC Round Locate Posts with Orange "Top Hat", 8 ft. in length with shorting straps
6" SDR 11
8" SDR 11
6" Steel Casing
8" Steel Casing
Ped
UNDERGROUND MATERIAL TOTAL
CLOSURES
FOSC 450 D Closure
D Size splice Tray
Slack Basket for D-Gel Closure
CLOSURES MATERIAL TOTAL
PATCH PANELS AND CABINETS
288F Pad mounted FDH Splitter Cabinet
432F Pad mounted FDH Splitter Cabinet
1x32 Splitter
1x64 Splitter
288 port rack mount panel
Wall Mount Fiber Enclosure
7ft Rack for patch panels
NEMA Enclosure
PATCH PANELS AND CABINETS MATERIAL TOTAL
MATERIAL TOTAL
TOTAL BACKBONE BID - DIVISION 2
Estimated Quantity
121415
172979
0
14988
9456
0
3958
1262
0
26
0
26
114099
135706
626
0
9828
1017
0
389
0
130
0
2
2
17622
2
2000
1803033
0
0
542497
272
680
227
610372
0
41
1066
126
45
7116.66666666667
7116.66666666667
7116.66666666667
7116.66666666667
7116.66666666667
7116.66666666667
294
17386
4794
0
4794
0
0
177
177
2
35300
1765
353
353
Estimated Quantity
0
223657
0
95914
19841
270964
261717
1494105
46663
1803033
542497
272
41
1066
126
45
680
227
274
17622
274
274
0
294
588
294
0
0
0
0
177
177
2
353
Unit
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
FT
LF
LF
LF
EA
EA
EA
LF
EA
EA
EA
EA
EA
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
FT
LF
EA
EA
Unit
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Unit Price
Unit Price
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LABOR PRICING. All work includes traffic control plans, setup, maintenance and breakdown, compacted backfill, stormwater and erosion control setup, maintenance and breakdown, safety
compliance and soft surface restoration. All cells shown in green shall be completed by the Contractor. All other cells are protected in this form.
Item #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
28
29
30
31
32
33
36
37
38
39
46
48
50
51
52
53
57
58
60
61
62
63
127
130
131
133
134
138
146
148
149
150
161
162
163
164
***
Item #
177
178
179
180
181
183
196
197
198
202
203
204
206
207
208
209
215
216
219
220
221
222
223
235
236
237
272
273
277
278
284
285
286
287
***
***
WATERLOO ENGINEERING PLAN SUMMARY
Total Backbone and Fiber-to-the-Premise
Description
UNDERGROUND - BURIED
Directional Bore (0) 1" and (0) 2" and (2) 1.25"
Directional Bore (0) 1" and (0) 2" and (3) 1.25"
Directional Bore (0) 1" and (1) 2" and (0) 1.25"
Directional Bore (0) 1" and (1) 2" and (2) 1.25"
Directional Bore (0) 1" and (1) 2" and (3) 1.25"
Directional Bore (0) 1" and (2) 2" and (0) 1.25"
Directional Bore (0) 1" and (2) 2" and (2) 1.25"
Directional Bore (0) 1" and (2) 2" and (3) 1.25"
Directional Bore (0) 1" and (3) 2" and (0) 1.25"
Directional Bore (0) 1" and (4) 2" and (0) 1.25"
Directional Bore (1) 1" and (0) 2" and (0) 1.25"
Directional Bore (2) 1" and (2) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (2) 1.25"
Directional Bore (1) 1" and (0) 2" and (3) 1.25"
Directional Bore (1) 1" and (0) 2" and (4) 1.25"
Directional Bore (1) 1" and (1) 2" and (0) 1.25"
Directional Bore (1) 1" and (1) 2" and (2) 1.25"
Directional Bore (1) 1" and (1) 2" and (3) 1.25"
Directional Bore (1) 1" and (2) 2" and (0) 1.25"
Directional Bore (1) 1" and (2) 2" and (3) 1.25"
Directional Bore (2) 1" and (0) 2" and (0) 1.25"
Directional Bore (0) 1" and (0) 2" and (4) 1.25"
Directional Bore (2) 1" and (1) 2" and (0) 1.25"
Bore 6” Casing (Steel)
Bore 6” Casing (PVC)
Bore 8” Casing (Steel)
Bore 8” Casing (PVC)
Deep Bore - Water Crossing
Install Muletape in New Conduit
Install #12 AWG Insulated Tracer Wire
Install 5/8"x8' Copper Clad Ground Rod
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top with Test Station
Installation, Underground Fiber Cable - Including Slack (All other fiber)
Installation, Pedestal
Installation, Small Vault, 17” x 30”
Installation, Vault 24" x 36"
Installation, Large Vault 30" x 48"
Installation, Extra Large Vault 48" x 60"
Sawcut, Remove and Replace Asphalt 6" Thick
Sawcut, Remove and Replace Concrete 6" Thick
Sawcut, Remove and Replace Asphalt 8" Thick
Sawcut, Remove and Replace Concrete 8" Thick
Sawcut, Remove and Replace Asphalt 10" Thick
Sawcut, Remove and Replace Concrete 10" Thick
UNDERGROUND - BURIED LABOR TOTAL
SPLICING
Install New Splice Case & Prep Cable
Splicing, Fusion, Single Fiber
Splicing Fusion, Single fiber Pigtail at panel
Testing, OTDR, Uni-Directional, Power Meter Testing
Testing, OTDR, Bi-Directional, Power Meter Testing
Prep cable in PED for NAP
SPLICING LABOR TOTAL
PATCH PANELS AND CABINETS
Install Pad mounted FDH Splitter Cabinet + Site prep and Prefab Vault
Install rack mounted patch panel (Any Size) and tails
Install Wall Mount Fiber Enclosure
Install 7ft Rack for patch panels
PATCH PANELS AND CABINETS LABOR TOTAL
GENERAL
Pull fiber through building
Install 2" Electric Metal Tubing (EMT)
4" Core Bore
2" Building Riser with LB - Up to 10'
GENERAL LABOR TOTAL
LABOR TOTAL
Description
FIBER
12 CT Fiber Cable
24 CT Fiber Cable
48 CT Fiber Cable
96 CT Fiber Cable
144 CT Fiber Cable
288 CT Fiber Cable
FIBER MATERIAL TOTAL
UNDERGROUND
1” HDPE Roll Conduit, Orange – SDR 11
1.25” HDPE Roll Conduit, Orange – SDR 11
2” HDPE Roll Conduit, Orange – SDR 11
Mule Tape
#12 AWG Solid Thhn Insulated Tracer Wire
5/8"x8' Copper Clad Ground Rod
Small Vault, 17” x 30”
Vault, 24" x 36"
Large Vault, 30” x 48”
Extra Large Vault 48" x 60" (Split Lid)
3.5" Dia PVC Round Marker Posts with Orange Dome Top, 8 ft. in length
3.5" Dia PVC Round Locate Posts with Orange "Top Hat", 8 ft. in length with shorting straps
6" SDR 11
8" SDR 11
6" Steel Casing
8" Steel Casing
Ped
UNDERGROUND MATERIAL TOTAL
CLOSURES
FOSC 450 D Closure
D Size splice Tray
Slack Basket for D-Gel Closure
CLOSURES MATERIAL TOTAL
PATCH PANELS AND CABINETS
288F Pad mounted FDH Splitter Cabinet
432F Pad mounted FDH Splitter Cabinet
1x32 Splitter
1x64 Splitter
288 port rack mount panel
Wall Mount Fiber Enclosure
7ft Rack for patch panels
NEMA Enclosure
PATCH PANELS AND CABINETS MATERIAL TOTAL
MATERIAL TOTAL
TOTAL BID
Estimated Quantity
121441
176553
97818
14988
9456
21964
3958
1311
3687
323
1947230
26
114250
138648
626
103717
9828
1017
4741
389
58
130
59
7
7
21976
7
2000
4151524
2605040
1306
6873
2292
3825137
11631
52
4253
134
150
20868
20868
20868
20868
20868
20868
3826
109662
9834
39312
9834
11631
136
177
177
2
35300
1765
353
353
Estimated Quantity
818276
895721
474860
411188
695953
529159
2320732
1514154
314014
4151524
2605040
1306
52
4253
134
150
6873
2292
1312
21976
1312
1312
11631
3826
7652
3826
129
5
1
145
177
177
2
353
Unit
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
FT
LF
EA
EA
EA
LF
EA
EA
EA
EA
EA
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
SqrFt
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
FT
LF
EA
EA
Unit
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
FT
FT
FT
FT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0