Loading...
HomeMy WebLinkAboutITG Communications, LLC"SbALhU I3IU" ITG ,Communications, LLC FY 2023 CONSTRUCTION OF A FIBLR-TO-THE- PR[ .MISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK PROJECT CONTRACT NO 1088 1 .: • s.- • F 'ti • BID BONI) KNOW ALL BY THESE PRESENTS: That we, ITG Communications, LLC Fidelity end Deposit Company of Maryland and Zurich American Insurance Company firmly bound unto city of Waterloo, Iowa as Principal, and , as Surety, are held and , as Obligee, (hereinafter referred to as the Jurisdiction"), in the penal sum of dollars ($ ), or 5% percent of the amount bid in lawfid money of the United States, for which payment said Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns jointly and severally, firmly by these presents. The condition of the above obligation is such that whereas the Principal has submitted to the Jurisdiction a certain proposal, in a separate envelope, and hereby made a part hereof, to enter into a contract in writing, for the following described improvements; CONSTRUCTION OF A FIBER -TO -THE -PREMISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK PROJECT, CONTRACTNO.1088 The improvement includes the construction of the necessary components to create the high-speed FTTP XGS-PON communications Network (the Project) within the City's defined Service Area and prepare it to deliver backbone and fiber -to -the -home services. The system shall be a fully operational high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet. The Project requires the construction of a Fiber to the Premise feeder/distribution and a backbone network which will support XGS-PON technologies to be utilized to deliver best -effort and guaranteed services to its customers within the City Service Area. The design identifies the placement of FDH's located at the City data center and network PoP's. These locations will also house active electronics and splitters in support of the F 11 P deployment, Fiber routes to be built by contractor and operated by the City and the Waterloo Telecommunications Utility will be utilized to interconnect these FDHs in a fiber ring topology. Fiber routes are Laid out logically to economically connect each service area back to the local cabinet located at the headend or alternate node site, Architecture is a star design for the feeder network and a ring connecting network nodes. The Project will be located at various locations throughout the City. The City has active grant applications into federal funding agencies for portions of the backbone only (Division 2 work) In the event of a grant award, the City reserves the right to remove the Division 2 work from the Contract, with a reduction in fee to the Contractor equivalent to the bid price associated with the Division 2 work. The City anticipates that a decision regarding the Division 2 work will be made on or before August 1, 2023. FY 2023 Construction of A Fiber-To-Tho-premise Feeder/Dlatrlbullon And Backbone (CONT. BID BOND) Project Name Network Prided, Contreot No. 1088 The Surety hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Jurisdiction may accept such bid or execute such Contract and said Surety does hereby waive notice of any such extension. In the event that any actions or prove dings am initiated with respect to this Bond, the parties agree that the venue thereof shall be Black Hawk County, State of Iowa. If legal action is required by the Jurisdiction against the Surety or Principal to enforce the provisions of the bond or to collect the monetary obligation incurring to the benefit of the Jurisdiction, the Surety or Principal agrees to pay the Jurisdiction all damages, costs, and attorney fees incurred by enforcing any of the provisions ofthis Bond. All rights, powers, and remedies of the Jurisdiction hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers and remedies given to the Jurisdiction, by law. The Jurisdiction may proceed against Surety for any amount guaranteed hereunder whether action is brought against Principal or whether Principal is joined in any such action or actions or not. NOW, THEREFORE, if said proposal by the Principal be accepted, and the Principal shall enter into a contract with Jurisdiction in accordance with the terms of such proposal, including the provision of insurance and of a bond as may be specified in the contract documents, with good and sufficient surety for the faithful performance of such contract, for the prompt payment of labor and material famished in the prosecution thereof, and for the maintenance of said improvements as may be required therein, then this obligation shall become null and void; otherwise, the Principal shall pay to the Jurisdiction the full amount of the bid bond, together with cont costs, attonney's fees, and any other expense of recovery. Signed and sealed this 12th day of June SURETY: Fidelity and-D Zurieh Ame posit Company of Maryland and n Insurance Company Surety Company ey-in-Fact/Officce �efher?r A dtedName ofAttorney-in-Fact/Officer Fidel ty end Deposit Company of Maryland and Zutloh Amerban Insurance Company Company Name 1299 Zurich Way, 61h Floor Company Address Schaumburg, IL 60196-1056 City, State, Zip Code (847) 605-6000 Company Telephone Number PRINCIPAL• , 20 23 . ITG Communications, LLC 152 Molly Wakon Ochre Address Hendersonville, TN 37075 City, State, Zip Code 305 978 9095 Telephone Ntunber NOTE: All signatures on this bid bond must be original signatures in ink; copies, facsimile, or electronic signatures will not be accepted. This bond must be sealed with the Surety's raised, embossing seal. The Certificate or Power of Attorney accompanying this bond must be valid on its face and sealed with the Surety's raised, embossing seal. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE §1189 A notary public or other officer completing thls certificate verifies only the identity of the individual who signed the document to which thls certificate Is attached, and not the truthfulness, accuracy, or validity of that document. state of California County of Los Angeles On JUN 12 2023 before me D. Garcia, Notary Public Date Here Insert Name and Title of the Officer Personally appeared Simone Gerhard Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/thelrauthorized capacity(ies),andthatbyhis/her/theirsignature(s)ontheinstrumenttheperson(s), or the entity upon behalf of which the person(s) acted, executed the Instrument. D. GARCIA COMM. #2354770 z Notary Public • California o Los Angeles County Comm Expires A r. 18, 2025 Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true an d correct. WITNESS my hand and official se Signature OPTIONAL Signature of Notary Public Though this section Is optional, completing this information con deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document Document Date Number of Pages Signer(s) Other Than Named Above Capacity(ies) Claimed by Signers) Signer's Name Signer's Name D Corporate Officer—Title(s) Partner 1 Limited ® General Individual jr] Attorney in Fact DI Guardian or Conservator Trustee L1 Other Signer Is Representing iw Corporate Officer—Title(s) El Partner _ Limited ®General Li Individual D Attorney In Fact Ei Trustee 0 Guardian o Conservator 0 Other Signer Is Representing ZURICII AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint B. ALEMAN, Ethan SPECTOR, Timothy NOONAN, Janina MONROE, Adrian VALENZUELA, Jennifer OCHS, Aidan SMOCK, Lisa CRAM, Simone GERHARD, Erin BROWN, Paul RODRIGUEZ, Emily NEWELL, D. GARCIA, KD WAPATO, Marina TAPIA, Edward C. SPECTOR, Ethan SPECTOR of Los Angeles, California, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall he as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland,, and We regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Matyland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 07th day ofFebruary, A.D. 2022. �oS mm A 3afC ��' Sc'▪ `k/4P. "�!�a: By: Robert D. Murray Vice President iy�C(�Vrli By: Dawn E. Brown Secretory mmiii0,0. �ihu,ua nio••c`Q ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY 01 MARYLAND State of Maryland County of Baltimore On this 07th day ofFebruary, A.D. 2022, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument aro the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. • IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. R¢ ryk.sP thr Constance A. Dam, Notary Public My Commission Expires: July 9,2023 Authenticity of this bond can be confirmed at bondvalidator.zudchna,com or 410-559-8790 NON -COLLUSION AFFIDAVIT OF PRIME BIDDER State of Tennessee ) ss: County of Coffee Bryan Siebenberg , being first duly sworn, deposes and says that: 1. He is (Owner, Partner, Officer, Representative, or Agent) , of ITG , the Bidder that has submitted the attached Bid; 2. He is fully -informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid: 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any of its agents, representativ- _ owners, employees, or parties in interest, including this affiant. (Signed VP of Operations Title Subscribed and s orn a be re me this ?)f day of 16 2 nmisslon Explros 06-18-2024 My commission expires \` SEE IANN N0 /e� �,••• tie '. CO •• •�� BIDDER STATUS FORM o To be completed by all bidders PART A Please answer "Yes' or "No' for each of the following: Q Yes Q Yes No Q Yes Q Yes ! No Q Yes No My company is authorized to transact business in Iowa. (To help you determine if your company is authorized, please review the worksheet on the next page). My company has an office to transact business in Iowa. My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail. My company has been conducting business in Iowa for at least 3 years prior to the first request for bids on this project. My company is not a subsidiary of another business entity, or my company is a subsidiary of another business entity that would qualify as a resident bidder in Iowa. If you answered "Yes' for each question above, your company qualifies as a resident bidder. Please complete Parts B and D of this form. If you answered "No" to one or more questions above, your company is a nonresident bidder. Please complete Parts C and D of this form. o To be completed by resident bidders PART B My company has maintained offices in Iowa during the past 3 years at the following addresses: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: You may attach additional sheet(s) if needed. City, State, Zip: o To be completed by non-resident bidders PART C 1. Name of home state or foreign country reported to the Iowa Secretary of State: 2. Does your company's home state or foreign country offer preferences to resident bidders, resident labor force preferences or any other type of preference to bidders or laborers? 3. If you answered "Yes" to question 2, identify each preference offered by your company's home state or foreign country and the appropriate legal citation. You may attach additional sheet(s) if needed. o To be completed by all bidders PART D I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my failure to provide accurate and truthful information may be a reason to reject my bid. Firm Name: Bryan Siebenberg Signature: Date: 6/13/2023 You must submit the completed form to the governmental body requesting bids per 875 Iowa Administrative Code Chapter 156. This form has been approved by the Iowa Labor Commissioner WORKSHEET: AUTHORIZATION TO TRANSACT BUSINESS This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following describes your business, you are authorized to transact business in Iowa. O Yes O Yes O Yes O Yes O Yes • Yes O Yes Q Yes Q Yes My business is currently registered as a contractor with the Iowa Division of Labor. My business is a sole proprietorship, and I am an Iowa resident for Iowa income tax purposes. My business is a general partnership or joint venture. More than 50 percent of the general partners or joint venture parties are residents of Iowa for Iowa income tax purposes. My business is an active corporation with the Iowa Secretary of State and has paid all fees required by the Secretary of State, has filed its most recent biennial report, and has not filed articles of dissolution. My business is a corporation whose articles of incorporation are filed in a state other than Iowa, the corporation has received a certificate of authority from the Iowa secretary of state, has filed its most recent biennial report with the secretary of state, and has neither received a certificate of withdrawal from the secretary of state nor had its authority revoked. My business is a limited liability partnership which has filed a statement of qualification in this state and the statement have not been canceled. My business is a limited liability partnership which has filed a statement of qualification in a state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of cancellation has not been filed. My business is a limited partnership or limited liability limited partnership which has filed a certificate of limited partnership in this state and has not filed a statement of termination. My business is a limited partnership or a limited liability limited partnership whose certificate of limited partnership is filed in a state other than Iowa, the limited partnership or limited liability limited partnership has received notification from the Iowa secretary of state that the application for certificate of authority has been approved and no notice of cancellation has been filed by the limited partnership or the limited liability limited partnership. My business is a limited liability company whose certificate of organization is filed in Iowa and has not filed a statement of termination. My business is a limited liability company whose certificate of organization is filed in a state other than Iowa, has received a certificate of authority to transact business in Iowa and the certificate has not been revoked or canceled. 309-6001 (09-15) CITY OF ,.. (9 ij44TERLOO IOWA MBE/WBE BUSINESS ENTERPRISE PRE - corn munity of Opportunity BID CONTACT INFORMATION FORM P rime Contractor Name: ITG Communications, LLC Project: FY 2023 Construction of a FTTP Feeder/Distribution Letting Date: 6/13/2023 N O MBE/WBE SUBCONTRACTORS: If you are NOT using any MBE/WBE subcontractors to complete this project, sign below. AttaehTh brief explanation as to why subcontracting was not feasible with this project. If any MBE/WBE subcontr tors will be used, please use the bottom portion of this form. i9 Contractor Signature: Title: VP of Operations Date: 6/13/2023 S UBCONTRACTORS APPLICABLE. You are required, in order for your bid to be considered responsive, to provide the information on this form showing ALL of your MBE/WBE subcontractor contacts made for your bid submission. This information is subject to verification. Any questions may be directed to Contract Compliance Office 319- 291- 4429. You are required, in order for your bid to be considered responsive, to provide the information on this Form showing your MBE/WBE Business Enterprise contacts made prior to your bid submission. This information is subject to verifications and confirmation. If you are unable to identify MBE/WBE firms to perform portions of the work, please contact Rudy Jones, Contract Compliance Officer, for assistance at (319) 291-4429. In the event it is determined that the MBE/WBE Business Enterprise goals are not met, then before awarding the contract the City of Waterloo will make a determination as to whether or not the apparent successful low bidder made good faith efforts to meet the goals. TABLE OF INFORMATION SHOWING BIDDER'S PRE - BID MBE/WBE BUSINESS ENTERPRISE CONTACTS Quotes Rcccived Quotation used In bid Subcontractors MBE/WBE Contacted Dates Yes/No Contacted Dates Yes/No Dollar Amount be Subcontracted Proposed to Carter Electric 4/10/23 No 4/24/23 NO Culpepper Electric 4/10/23 No DC Coproration 4/10/23 No I-ype text Bryan Siebenberg Form CCO-4 Rev. 06-20-02 MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION FORM INSTRUCTIONS Prime Contractor Responsibilities: Prime Contractors bidding on City of Waterloo contract work are required to ensure that MBE/WBE businesses are provided the opportunity to participate in the performance of contracts and subcontracts. Prime contractors are required to assist MBE/WBE businesses in overcoming barriers to participation and must make good faith efforts to secure bids from, and award subcontracts to, MBE/WBE businesses. For all contract bids of $50,000 or more, the following is required to demonstrate good faith efforts in accordance with this policy: 1. "MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION FORM" submitted with the prime contractor bid, properly completed and signed on Form CCO-4 (Rev. 06-20-02). Please note that this document must include all subcontractor contacts, bids received, and awarded - not just those related to disadvantaged business enterprise vendors. 2. A minimum of three (3) MBE/WBE business contacts must be made and documented, if there are at least three (3) MBE/WBE businesses offering services in the areas to be subcontracted (see City of Waterloo MBE/WBE Certified List). If less than three (3) are offering the services to be subcontracted, then a contact is required for any that are listed as providing that service. If you have submitted a MBE/WBE contact not on the City's MBE/WBE list, attach a copy of the certification from another government agency. 3. Contacts to each MBE/WBE businesses are required to be a minimum of seven (7) working days prior to the date the pnme contractor submits the bid to the City of Waterloo. 4. The following documentation must accompany the "MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION FORM" for each MBE/WBE business contacted: a. A copy of the bid received from the MBE/WBE, OR b. If no bid was received, a copy of correspondence received from the MBE/WBE with a "no bid" response, OR c. If no response was received, a copy of the solicitation sent to the MBE/WBE with proof of mailing attached. 5. If any MBE/WBE business submitting bids are not selected for subcontract award, documentation must accompany the "MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION FORM" on why the MBE/WBE was not selected. These reasons could include: a. Not low bid. Copies of the competing bids may be required for verification. b. MBE/WBE did not bid, withdrew bid or was n o n -responsive. c. Documentation of other business -related reason for not selecting the MBE/WBE business for a subcontract. d. Prime contractor self performs work. e. Any other reason relied on by the Prime Contractor. f. The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. Fenn CCO-4A Rev. 07-013-02 FORM OF BID OR PROPOSAL FY 2023 CONSTRUCTION OF A FIBER -TO -THE -PREMISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK PROJECTCONTRACT NO. 1088 CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa Gentlemen: The undersigned, being a Corporation existing under the laws of the State of Tx a Partnership consisting of the following partners: Private Equity Majority Owned having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract documents listed in the Table of Contents and Addenda (if any), as prepared by Magellan Advisors for the City of Waterloo now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation services required to construct and complete this F.Y. 2023 CONSTRUCTION OF A FIBER -TO -THE -PREMISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK PROJECT, Contract No. 1088, all in accordance with the above -listed documents and for the unit prices for work in place for the following items and quantities contained in Attachment B. The contractor shall submit a copy of Attachment B as part of their bid. The sum of Division 1 (FTTP) Base Bid Total and Division 2 (Backbone) Base Bid Total, plus one Alternate from Groups A, B, C, or D, shall be used to determine the Lowest Responsible Bidder. FY 2023 CONSTRUCTION OF A FIBER -TO -THE PROJECT -PREMISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK CONTRACT NO. 1088 Description Total Cost DIVISION 1 BASE BID WORK- FTTP $15,100,874.07 DIVISION 1 BASE BID TOTAL PRICE $21,244,963.93 DIVISION 2 BASE BID WORK - Backbone based on federal funding decision) (subject to removal $13,281,835.68 DIVISION 2 BASE BID TOTAL PRICE $16,448,982.14 BASE BID TOTAL (DIVISION 1 + DIVISION 2) $ 37,693,946.07 BASE BID TOTAL (DIVISION 1 + DIVISION 2)+ALTERNATE A $66,565,919.83 BASE BID TOTAL (DIVISION 1 + DIVISION 2) + ALTERNATE B $66,565,919.83 BASE BID TOTAL (DIVISION 1 + DIVISION 2) + ALTERNATE C 2) + ALTERNATE D $ 77,864,565.10 $77,864,565.1 O BASE BID TOTAL (DIVISION 1 + DIVISION 1. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to Contractor. FORM OF BID CONRACT NO. 1088 Page 1 of 3 2. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa, to reject any or all bids. The undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten (10) days after the agreement is presented to him for signature and start work within five (5) days after "Notice to Proceed" is issued. 3. Security in the sum of Dollars ($ ) in the form of is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS. 4. Attached hereto is a Non -Collusion Affidavit of Prime Contractor. 5. Attached hereto is a Bidder Status Form. 6. The bidder is prepared to submit a financial and experience statement upon request. 7. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in work for the City in the current calendar year, are prepared to submit an AAP or Update and an EOC, within ten (10) days of notification that the bid submitted acceptable. 8. The bidder has received the following Addendum or Addenda: 9. Addendum No. Date 10. The bidder shall list the MBE/WBE subcontractor(s), number of subcontracts and bid items on the City of Waterloo Minority and/or Women Business Pre -bid Contact Information Form submitted with this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day Bids on this Project are due along with the Non -Collusion Affidavits of All Subcontractor(s). 11. The Contractor shall be required to provide a State of Iowa Contractor Registration Number for all their employees and those of their subcontractors engaged in work at the site, in accordance with State Laws. No bids will be awarded until the Contractor and subcontractors have been confirmed within seven (7) days after the bid opening. 12. The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City prior to approval of contract. The Contractor shall not use more than 50% subcontractor labor during any portion of the project unless pre -approved by the City. 13. The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer cannot be changed except for the following reasons: a. The City of Waterloo does not approve the subcontractors. b. The subcontractors submit in writing that they cannot fulfill their subcontracts. 14. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none" or "NA". 15. The bidder has attached all applicable forms. 16. This bid includes a fiber -to -the -premise and fiber backbone projects as outlined below: FORM OF BID CONRACT NO. 1088 Page 2 of 3 1) Fiber to the Premise (FTTP): the FTTP network will pass all residents and businesses of Waterloo. The FTTP network includes 390.54 miles of underground construction to pass roughly 29,400 premises throughout the City of Waterloo. 2) Fiber Backbone: the backbone includes 115.80-miles of underground construction along major city corridors and key commercial areas connecting hundreds of City, traffic and utility sites, and facilities. Phasing/Work Order Plans: • Phase 1 Fire Station 6 ("Backbone and Laterals") is an area consisting of approximately 38.99 miles of underground backbone and distribution fiber covering the South area of Waterloo, to connect 116 city facilities. Phase will be broken into multiple work orders. o Phase IA is a 191.81-mile underground fiber connection from Fire Station 6 Point of Presence (PoP) location extending out to the City of Waterloo service area. • Phase 2 Linden Tower ("Backbone and Laterals") is an area consisting of approximately 42.57 miles of underground backbone and distribution fiber covering the Northeastern area of Waterloo, to connect 76 city facilities. Phase will be broken into multiple work orders. o Phase 2A is a 98.58-mile underground fiber connection from Linden Tower Point of Presence (PoP) location extending out to the City of Waterloo service area. • Phase 3 Fletcher Lift Station ('Backbone and Laterals") is an area consisting of approximately 34.24 miles of underground backbone and distribution fiber covering the Northwestern area of Waterloo, to connect 167 city facilities. Phase will be broken into multiple work orders. o Phase 3A is a 100.15-mile underground fiber connection from Fletcher Lift Station Point of Presence (PoP) location extending out to the City of Waterloo service area. City intends the Network to serve as a development platform for innovation, next generation application development, workforce development, and job creation, and to provide an overall better quality of life throughout the Service Area. The City has active grant applications into federal funding agencies for portions of the backbone only (Division 2 work). In the event of a grant award, the City reserves the right to remove the Division 2 work from the Contract, with a reduction in fee to the Contractor equivalent to the bid price associated with the Division 2 work. The City anticipates that a decision regarding the Division 2 work will be made on or before August 1, 2023. BY: Bryan Siebenberg VP of Operations 6/13/2023 (Name of Bidder) (Title) (Date) Official Address: (Including Zip Code): 154 Molly Walton Dr Hendersonville TN 37075 I.R.S. No. FORM OF BID CONRACT NO. 1088 Page 3 of 3 Base Bid Unts LASOR Al I ne .terns 16ck4 rg zero coantly should ha.e al 'U-.t Cost' (rlry Unt Cost V n t Cost Division 2 83 U-.ts Division 1 FTTH Vats Division 2 03 Cost Division 1 Intl Cost 1 Dact-ov*B: re (1) 1',(2)2',(3) 125'->(153 LE S 2625 3e9 • S 1021125 S - 2 D rcct•ovl Bde (')) I., (2) 2', (3)1 25' -1151 LE S 2025 12E4 49 S 25.556 W S 59225 3 D rtct-ona! Bcre (1) 1', (0) 2', (3)125" -Ili) Lc S 1815 136394 S 2.475.551.10 S - 4 0recto-sal Pore (1) 1',(1)2',(3) 125'-sill) 1E S 2325 1.018 - 1 20.61450 S - 5 0rcctcv' ere(0) 1',(1)2',(3) 125'->(tF) lc S 11115 9.459 S 171/1085 S - 6 15rectonal Bare (0)1', (G) 2'. (3) 125' ->(J) LE S 1585 164.244 • S 2,(03267.4) S - 7 0 rcctona' Bore (2) 1', (G) 2', (3) 125' ->(t0) LE S 2025 176 • S 3.564.0) S - 8 I)redone' Bore(G) 1',(1)2',(05125'-allF) LE S 11.95 S.EO2 97.E09 S 65,94390 $ 1,1/381735 9 D recto -al Bsre (0) 1', (2)2L(0) 125'-sill) LE S 1375 3.2E5 21.972 S 45,18250 S 3)2.1150) 10 D sect cn3! Bore (0) 1',(0) 2'.(3) 125'->(Lf9 1F S 1815 13) • S 2.35950 S - 11 Dien roil Boce(1) 1',(0)2',(4) 125" ->(LFJ LE S 2025 626 • S 12.676.50 S • 12 O rectonal Bore (2) 1',(2) 2', (3)125' ->(LF] LF S 28-50 26 - S 741.00 S • 13 O rest one Bore (0) 1t(4) 2'.(0) 125'->(LFI LF S 1815 26 2)7 S 471.53 S 5,350-55 14 Otect anal Bore (0) 1%(012'. 12) 125'-7(1.F3 LE S 13.75 94,929 26 S 1,305.273 75 S 357.50 15 0rect0nal Bore (1) 1',(012', (2) 125" -,(LE) if S 1515 113.903 151 S 1105,441 EJ S 2,39335 16 D red *nal Bore (0) 1t(0) 2'. (1) 1.25' -s((5) IS S 11.95 323 S 3.8598S S - 17 D recta-nal Bs:e (1) 1',(&}2',(0) 125'->(LE) LF S 11.95 - 3,19253 S - S 465137335 18 D'rectonal B-re(0) 1',(3) 2', (0) 125'->(11) LF S 1585 - 3.650 S - S 59.415�50 19 Oma onal Bye (I) 1%(1)2',(0)125' ->(1.9 LF S 13.75 - 103.676 S S 1425.545 CO 20 Ortct teal Bore(2) 1',(0)2',(0) 125' -'(LF) LF S 1375 - 129 S - S 1,77375 21 0 rat ono? Bore (l) 1'. (2)2', (0) 125'->1t9 LE S 1585 - 4.742 S • 1 75.1E0.70 22 0rectonal B:re(2)1%(1)2',(0)125' -IfLE) LF S 1585 - 59 S - S 935.15 23 Oact c"vl Bore (I) 1',11)2',(2) 125'->[LE) LE S 1815 9.837 • S 178541.55 S - 24 0 ma omit Bore (0)14, (2) 2'. (2)125" -sflc) LE S 1815 3963 - S 71,92345 S - 25 Drectcial Bore (0) I'. (1)2'.(2) 125' -'(LF) LF 5 1565 14.559 - S 23725365 S - 26 V ss 'e Bore (1)1'co-do t 3)'deep -7(l5) LF S 11.95 - S • S • 27 Pal (4) 2' sdr 11 conskuts in b' cos Ag -'(FT) FT S 22.50 • • S • S - 28 Bore 6'Cas'g (Sttt)->(LF) LE S 6210 100 • S 6.20000 S - 29 Bore 6'Cas'g(FYC)-5[LF) LF S 340) 10) • 5 330003 S - 30 Bose 8' Cas rig (Steel ->[1F) LF S no) 1D) S 73A-W S - 31 Bore 8' Cas-g(PVC) -,[1.E) LE S 39 CO 2,632 1.034 S 102.64S00 S 403260) 32 Deep &:re -Watt r Cross-g ->fllj LE S 61.50 100 - 5 6.15000 S - 33 Instal Vuitton in lien Condo t ->frT] FT S 025 1.733E45 376,707 S 434151.5O S 94176.75 34 Bore Rock Adder -sill) LE S 4375 - - 5 - S - 35 Tre.-.ch Rock Ad-'cr -5(15) Lc S 3225 - - S - S - 35 Instal *12 AWG lr.s'.'a:ed Tracer W.re ->(LE) lc S - 518.538 2$S5.454 S - S - 37 Instal 5/81T' Copper Clad Grc+.ni Rod -1EA1 EA S 520) 276 1,039 S 1435210 S 54.028W 33 Instal 35'DaPVC P.coniVarlet Posts M' th Orange Dome Top ->(EAI EA S 2510 676 6.181 S 16.95300 S 1543250) 33 Instal 35' Da FVC Coon! Marl er Posts n th Orange Oare Top vs th Test Stwm -1E4) EA S 650) 234 7C57 5 152100) S 1343550) 4) Instal RE:O Ba'/Peg hrah ers->(EA) FA S 5.00 - - S - S - 41 Instal RF:D ReFe-s[ll] LE S - - S - S - 42 Proof Existing Ctnivt- arys•ne -siLl) LF S 13S S S - 43 Rod E. 4ting Coniv t as Instal FVl Tape->LLF) LF f 1.65 S S - 44 Re ciao.* tist,-gUlee -ie.coa MJt&sled par in street l gist CC -do is to rep'3ce lath f 8er->((F) LF S 135 • • S • S • 45 Insta'atcn. Uvdergros,nd F.ter Cabe • r,C. 4 rg Slack (2ct F.ter)->[L5) LF S 1.15 S - S - 45 Instela:.. Vndergro!.-dFitt/ Cable •1.<4.4 'kj vats (REgalar loose Tote F.ter)-sill) LF S 120 $59,118 571,020 S 7O5.941.E0 S 65522403 47 Instigation, U.-dergrct-dF.ter Cate-to{1-4 ng Slack (V coo ter most to roan in)->(19 LF S 120 S - S - 49 Lnsta"ation, MST In Pedestal _>(EA1 EA S 35-00 - S - S - 4) Insta'a:wn, Pedestal ->(EA) EA S 69.00 S • S - 50 Lnst3'ation, Drop Mao 't. 12' X 12' ->(EA) EA S 45.0) - - S - 5 - 51 IAsta"a5on, Small Vac.\ 13' x 24' (Campos tt)-ILEA) EA S 150.05 S - S - 52 Irsta'aton, Snail Vr.t 17' x 30' -'(EA] EA S 1E0.00 44 16 S 7,920-W S 2.8E0 CO 53 1 :s+a'lotion, Vao's 244 x 35" -'(EA) EA S 24510 1p33 3353 S 240.720 0) S 813,/2000 54 lrst3'a5on, Large Vaal 35' x 45' -s((A) EA S 42010 137 14 S 57.54).0) S 500 W 55 rstea5on. Extra Large Vaol 45' x CO' ->(EAJ EA S 54010 55 122 5 29.700.43 S 65,E9)A) 56 Instal 444'44' Sp' t Concrete Ma'hee -'(EA) EA S 1,500150 - - S • S - 57 P.tno.e aal Replace H ni>o'e - intid -g I rg sweeps i ::o HH ->(EA) EA S 775.0) - - S - S - 59 Prep a-4 Poor Cc.-trtte Pei for POP Ste -s(EA) EA S 820O03 - - S S • 59 Sae.crrt Rtnaye and Replace Asphalt 6'Thck-'(SgrFt) SG'Ft S 2810 6,060 13,705 S 169.670b7 S 353.77733 E0 Sanmt Pecrdwe and Replace Co crcte 6' Thck-'(S3rFt) S, Ft S 32 W 6.050 13.7C5 S 193.95933 S 433 0267 61 P.Emo.e an! P..ep'ace Brck Pacers ->(S, Ft) SGrFt S 2810 S - S - 62 Sanctt. Renao.e and Revace Asphalt 6' Pack ->(Sgrft) SGrFt S 3000 6,060 13,705 S 181,790_03 S 411,19)W 63 SaACIA. REm].e ani Rep'ace Concrete 6' Thck->(SgrFt) 5;'Ft S 3300 6,C60 13.705 S 19356910 S 45235910 E4 Sancot. Re.rso.e a-4 P.cp'3te Asp'aat 10' Thck->(5)41) SGrit S 31.00 6160 13,706 S 187149.67 S 424,6i633 65 Sancut P.e.ry.eand Rep'3Ce Concrete 10' Thck->(SgrFt) Silt S 34 CO 6,09) 13,7055 S 206.02867 S 4E6,01533 E5 - •S S - 67 - S - S - .. - f rla. .1nI4. •. ,. j J.. .t AERIAL 4STIVADrM5N E3 tas'vVc'.0 Cbwre->(EA) EA S 11503 - S - S - 69 B±ni Stra-d/Gtry to pole grcc,r] a materials -7(EA) EA S 1050 10 S 105 03 S - 70 Instal Strand ->(FT) FT S 1.0) 4,0)3 - S 4.0».W S - 71 instal Snort S>.tes->(EAJ EA S 105.00 - - S - S • 72 InstalMN'Slack ->((A) EA S 1.45 400 - S SE000 S • 73 Insta I/ Lash Aerie! Cabe->(FT1 FT S 1-5') 4O)) - 5 6.0)0 W S - 74 Tree Trrnrg-gm FT S 225 403 - S 9)).00 S - 75 InstalI Pee R sers->((AI EA S 6003 8 S 45)A) S - 76 InstaI Dona Goy 8 Anchors -'(EA) EA S 120 CO 8 - S 99101) S - 77 Pee Transfer/ Mare Rea.y(5traght Tteosgh)->((A) EA S 4500 2 - 5 9503 S • 78 Pee Transfer/ Male Re ads (Oeairtad) ->((A) EA S 4503 3 - S 13500 S - 79 Pee Transfer/Mate Reat/(D:ob'e Dealend)->fEA) EA S 550) 3 - S 16503 S - EA - - S - S . 81 - S - S . 82 - S - S . 83 - - S - S - 84 - - S - S - 65 S - S . E6 - S S . 87 - S S - E3 - - S S - 63 - S - S - SPLICING 127 instal NENSp' ceCase & Prep Cave->(E4) EA S 20003 220 155 S 444))W S 3Lp))CO 128 Re -eater so' ce closure ->(EA) EA S 1&0 W - - S - S - 123 6reo41 Sp'ce Case •Na:er''s->IEA3 EA S 1503 - S - 5 - 13) Sp' oat, lust t•1 S'rg'e F.ter->(2A) EA S 25W 33.511 42.523 S 537,775 CO 5 1,C4320302 131 so' 0-ijfus on,S-gef ter P.gtal at panel -'(EA) EA S 25.03 - 45.744 S - S 1,143.603C') 132 SF'd-.g Vass Fos on. 12 F.ter P. Gten-s(R 33O41 P.3>.AV f 13500 - - S - S - 133 Testrg OTDk Ur:-0rect+ona. Pont/ Meter Test•-g-'(EA) EA S 1.03 4,416 42.528 S 44160) S 42.523W 134 Tesl•rtg, OTDR. B.-0 reasons'. Power Meter Test'g--ILEA) EA S 125 1,152 3216 S 144)0) 5 4,02005 135 Test ng(.•st 'geat 'es B:-D rcctional->(EAJ EA S 125 • S • S - 136 DMlner,t (.•st^g sr d^g->(EA) EA S 020 • • S S • 137 Reel test ^g-'(EA) EA S 375 • - S - S • 133 Prepcaba in F EO for NAP ->(EA) EA S 500) • • S • S • 139 S - S • 14') - - S • S 141 - S S • 142 - - S • S 143 - S - S 144 - - S - S - PATCN PANELSIWD awns 145 Instal Ufdc•.r Ponered Cab'net• S to rep ani Concrete Pai->(EA) EA S 2820 E0 • - S S - 145 Instal Pal rn:vtcd FOH Sp' tter Cat rat• Ste prep a-4 Prefab vw't ->(EA) EA S 3,70000 • 134 S S 435.8330 147 Vital Pe'e rna.n:ed FOH Sp' «cr Cab nil ->(EA] EA S 750 03 • • S • S ' 143 Instal rack rrol.n:ed patch pa -.el (Any S'le) and ta's ->[EA) EA S 11503 143 • S 21,62003 S ' 149 Install'73I Mc -4 F ter Endcs'_re ->(EAJ EA S 75003 1£3 • S 141.CCO CO S • 150 Instal 7h Pack for parch panels ->(EAJ EA S 403.00 2 - S £;AC') S - 151 S • S - 152 S - S • 153 S - S • 154 S - Si - 155 - - S - S • 156 - - S - S - 157 - - S - S • 159 S • S • 159 S - S • 1E0 S . .. _:�. S• .;.1( ••.IL`='... e-'.I is1.' .: :ion ... GEPNFRWL 161 rul f tin t:cashti_'d rg->(FT] FT S 2.15 3640) - S 79,120 CO S ' 162 Instal 2' E'cct;c Metal Tub rg (E MT) -VS] 14 S 732 1,84) • S I3,46380 S • 163 4' Cote Be:e->[EA] EA S 22503 353 • S 82.£))CO S • 164 2'&-'id 'g R.ser Ivth 1.8- Up to 10'->[EA] EA S 11200 34-3 - S 41,2160 S - 165 Instal Ne.'na Enclos',re ->(EA) EA S 55 O) 353 - S 20.2400) S - 166 - - S - S - 167 • - S • S - 1E3 S • S • 169 • - S • S - 170 • . S • S - 171 - • S - S - 172 - _ S S . 173 - S - S - 174 - - S - S - 175 - - S - S - MATERIALS 176 2CTF.ter Cabe->IFTJ FT S 0.19 - • S - S • 177 12 CT F.ter Cate • American Maie • Loose Tt.te al d C'tct;c ->(ET] FT S 033 - 131187 S - S 45,931.71 178 24 CT F.ter Cat'e • Atencan Male • loose Tute a'1 d t'ectr,c ->(FTJ FT S 04) 192.315 71.133 S 76.92600 S 28.45320 179 49 CT F.ter Cate -American Made • loose Tt.te al d electric ->(f l] FT S 044 - 19.035 S - S 9.136.£) 16) 55 CT F.t('Ca`_'e-Arer.can Made - Loose Tate al d e'ectrc->(F I] FT S 081 97543 • S 79.CC983 S - 181 144 CT F.ter Cabe-ATar:can Male- loose Tute al d e'ectnc->(FT) FT S 1.16 20377 214,415 S 23.63732 S 243,721.40 182 216 CTF.ttr Cate • A -TA Te.an Made- Loose Tate al d electric ->(FT) FT S 1.95 S • S - 183 2E3 CT F.ter Cabe-ATarica-1 Veit - Loose Tote al dt'ectric->(FT) FT S 200 2788.33 127,250 S 557,76603 S 254.500.00 184 12 CT M v0 F.ter Cate • Con.nscope: SIC.Yj 5i3/D3 • B-012-tN-F-M128'JIC0 ->(FT) FT S 0.49 S • $ • 165 24 CT V v0 F.t.& Cat it • Conrscope: 81 O.(ei3.'D3. 8-0241.144F-M1280140 ->(FT) FT S 0.57 S • S • 166 49 CT M cro F.ter Cate• Cormnsco;e:810j50t7D3.804S-tN-F-F123.014O->(FT] FT S 093 S • S - 187 55CT M cr0 f.ter Cate• Corn'nscope: 81 O))i O3/D3-B-6064.K-EF-L11la4140 ->(IT) FT S 132 S S • 1E3 144 CT M cro F.ter Cab'e•Cc•'nrdce;e:8100003):1D3-B-144-tN,£F-N12Bt/14D->(FTJ FT S 2.06 S • S - 1b3 2E3 CT I: cro F.ter Cabe • Cc• .nscope: 81O)9127/03 • B-2E3-t74-£F-V24%S717T 20 -IfTJ FT S 2.15 S - S - 19) 432 CT F.ter Cate-ATarica, Male- loose Tute->(FT) FT S 2.70 - • S - S - 191 E54 CTF.ter Cafe -Aver;can Made •Lcose Tute->(PT) FT S 540 - • S - S - 192 Drop F.ter Cate ->(FT] FT S 0.12 - - S - S • 193 • - S • S - 194 - - $ S - 155 - - S - S • Rt•1 11.'1-1.1U 'I IUTFI S i1/13 0". UNOERGPX/Uh9 156 1'HDFE PSI Cc-4..t, Orange -SDR 11->(FT) FT S 039 264576 2,655.1f1 S 51773E3 S 71).589.40 197 125' HD;E Rol C0- •_ t. Orange - SOR 11 ->(FT) FT S 0.0 1.412469 501 S EEO.335.12 S 24343 153 2' HOFE Pc'I Cor:•.•t. Orange -5DR 11 ->IfT) FT S 1A0 53,845 267.323 S 59.845.01 S 2673210) 15) 4'HD7.EPoi Conlut, Orange -5DR 11 -WTI FT S 1.18 - - S • S - 200 Vcrodcct ->(FT) FT S 028 - S • S - 201 2' PVC Sched.'e 42 eel End ->(F1) FT S 2 21 - S • S - 202 Mc'e Ta;e->(FT] FT S 004 1,733,£16 376.707 S 69,54584 S 1504323 203 *12 AWG Sold Win Inv -sated Tracer lV re->(FTJ FT S 011 518.9E3 2,055.454 S 57033E-3 S 226.101.04 204 5/4 36' Copper Cllai G cani Poi ->(EA) EA S 1624 276 403) S 4.43224 S 16.87336 205 Drop Vr.t 12' x 12' ->IEAJ EA S 27634 - - S • S - 2C6 Sntal Vac. I, 17' x 3 r - t:EWMSS • FCA173324T-C•XC6 (Or eyt, Ya a nt) ->(EA] EA S 403.05 44 16 S 17,554 20 S 6.528 EO 207 S al Vacit. 13' x 24'-Conposte• HU3?ELL• DTI 3241EHDHD OUV(Or ecd va'cra)->(EA] EA S 339.52 S - S • 203 VMft.24'xIS* - NEW3ASS- FCA243624T-0000 (Or tys. va'ent)->(EA) EA S 69976 1403 3,353 S 701,85923 S 2,37O7E6E-3 203 tale Vr^Y37 x 45--P.FW3AS'S- FCA334924TLO006 (Or ey'. :a't4)-4EA) EA S 104477 ;37 14 S 143.4)7.49 S 1465473 210 [Ora ta•ge Vail( 45'xEa' (Sp'tUd)- hE1VM95•FCA364035TN2OFc2VD1:1: C0023 (Or (yu•A'e.nt)->(EA) EA S 227043 55 122 S 12447365 S 276.932.46 211 4'xa'x4'Precast 'sp't'Manhole wth Fearer. Ca.er, a^ri Prs-g ->(EAJ FA S 8379.74 • S • S - 212 2' ENT Cold*, t->(GTJ FT S 53) S • S - 213 2' EMT LB ->(FA) EA S 2527 - 5 • S - 214 Flea atef.l->(CYJ CY S 24720 S • S 215 I'n;oned Granular Bacbf I ->(TNJ TN S 135.96 - S - S - 216 3 5' O a PVC P.cieni Mar: er Posts wth Orange Dane Top. 8 fL in length ->(EA) FA S 1633 676 4181 S 11,0330 S 101935.73 217 35' D a FVC Round Locate Posts wth Orange 'Top Hat', 8 ftin length wth s'e.t.g straps ->(EA] EA S 31.55 234 7.057 S 7,39270 S 6521385 218 PF1D 8a"Wong Ma'kea->((A) EA S 33.11 - - S • S - 219 RFD Rope -5(F-11 FT S 2.73 - - S - S - 220 6' 5DR 11 ->IfT) FT S 891 100 • S 831.0) S - 221 8' SOR 11->(FT1 FT S 12.72 2.632 1,034 S 3347304 S 13,15248 222 6' Steel CAS rg->(FT) FT S 60.10 I00 - S 6,0100) S • 223 6'Steel Casrg->(F1J FT S 85.76 200 • S 17,1S200 S - 224 Ped • b' • Cnar'.es Ini • B0O3)4 EGT ->(EAJ EA S 134 70 - S - S - 225 Pei • 10' • Chiles lnd • BDO3)S fGT -,(EA] EA S 18531 - - S - S - 226 EA - - S - S - 227 EA - - S - S - 228 EA - - S S • '.\:!kGQb •.:i :'Aifk It Ita1A ;) : • , • 0,O54311.1 229 FOSC 4508 Closure -Cc.tr.scc-;e: FOSC450-85E-24-1-&W->(IA) EA S 28202 - S • 1 - 233 Sp' ce Tray tor BGcl Closure (5M12)•Connscope: FOSC•ACC-B-TP.AY-24-4iT->(EA) EA S 1731 • S • S - 231 S'xk Basset for BG41 Closure • Comrsco;e: FOSC-ACC-B BAS• ET -TAIL ->[EAJ EA S 4073 - S - S - 232 FOSC 450( Closure ->(EA) EA S 30546 - S - S - 233 Sp' ce Tray for C-Gel Closure (51112) ->IEAJ EA S 19.12 • - S - S • 234 Sock Basket for CLtl Closure->(EAJ EA S 3735 S • S - 235 FOSC 450 D Closure• Ccmnsccpe: F0SC451135-6-72-I-D)1->(EA) EA 1 33606 220 155 S 73.93320 S 52,C693) 236 D Sze sp' ce Tray- Cc- ensce;e: FOSC-ACC•D-TRAY•72-KIT -,(EA) EA 1 25 91 220 155 S 5.7CO20 S 4,01645 237 S'3ck Basket for DGtl Closure • Comnscope: FOSC-ACC-D-BAS•ET-TAIL ->(EA) EA 1 22.13 61 45 S 1,34).93 S 59565 23S FOSC EC•) D Closure ->(EA) EA S 51022 - • S • S ' 233 EC•) D Y.e sp' ce Tray ->[EA] EA S 2243 - - S - S • 240 S'a:k Basket for 600 DGtl Closure ->[EA] EA S 4445 - S - S • 241 FLP COYOTE HD Doze Closure (Loose tube 576E6-4 sp' cts)->(EA) EA S 531.16 S S - 242 Coninsccre CSCIO)Vcro Clesare•CSC 1C•)-CSC34FSAIA1 B.4000->[EA) EA S 23S74 - S - S - 243 Cannscope CSC150 Vao Closure -(SC1S0- CSC 5C5A1A1B4C'))• can µ-de as aierrsate: OF DC -BEG •OFOC-85G-.\r0)6:1-::-72 EA S 246 CO • S • S - 244 Conescc- a CSC2C•) V cro Closure ->(EAJ FA S 246 CO - S S • 245 - - S • S - 246 - - S S 247 - S • S • 243 • - S - S - 249 - S - S - 25') - S - 1• rl',..-I'.•:?Ils •I Tut:: . :35f S!'. .. PATOI PANELS AND CABMBT11 270 O.:&c.c Pane r(i Cat -net ->(EA) EA S 113562S S - S - 271 144F Pai mounted FDH Sp' :ter Cab net -,(EA) EA S 5372 46 S - S - 272 2E2F Pad rnc4n:ea FDH Sp :ter Cab ntt - CLEARS.El0 - R-D32-26S-C16-020-8103F, V7Bt2P -,(EA) EA S 5.69129 - 129 S - S 73242541 273 432F Pad mounted FDH Sp' tier Cab net • CLEARF.ELD-R-FB2-432-C1E-03)>B 100F, V73,(2P->(EA) EA S 854932 - 5 S • S 42,74M0 274 145F Pc'e mounted FDH Sp' itcr Cab -et ->(EA) EA 5 4.7E2.47 - • S • S - 275 222F Pole mounted FDH Sp' Mr Cab xt -ILA) EA S 5.071.70 S • S - 276 432E Nose ,rca'ced FDH Sp' ttcr Cab net ->[FA) EA S 7.854.12 • - S • S - 277 tx32 Si tter - CLEAR; .ILO -KCt{M->(EA) EA S E6544 - S S - 278 1>E4 Sp'tter- CLEAPS.E LO- liCOCAA->[EAJ EA S 2.126.03 2E9 S - S 559.7ES0) 279 12 port rack moan pail ->(EA) EA S 2262) - - S - S - 2E0 24 port rack mount pawl- CLEARF:ELD- GA3-024-CIF-822->IEA) EA S 35334 183 - S 73.155-92 S - 231 4S pert rack mount panel ->(EA) EA 5 442.55 - - S - 5 - 282 95 port rack mount panel->lFA] EA S 75100 - • S - S - 233 144 port rack rr:.-4 panel ->(EA) EA S 1,656.05 - • S - S - 284 263 port rack rmxnt pind-CLEARF:ELD • G-HB3-26 3-C1 F-822->JEA) EA S 4,78721 4 • S 19.149E4 S - 265 Vla I 'fount F.ter Enclosure • CLEARF.EL0 • WP•X ,.B2.24•SCA-8 ->(EAJ EA S 11124 183 • S 20.913.12 S - 2E6 7ft Pack for patch panes •CLFA5t:ELD•WA-Al AE.EVA-L12-SU3.0i31C4.(2)FVA-EZA->[EAJ EA S 92)34 2 - S 1,65S ES S - 287 AEVA Enclosure • H0FFVAN • CSD2424125S. CP2424->(EA] FA 5 51352 3E9 • S 1E$97536 S - 2E3 • - S - S - 2E3 S - S - 2-r) - - S S - 291 - S - S - 2)2 - • S - S - 233 S • S - 294 - S • S . 2)5 - S • S . 2)6 - • S • S - 2)7 S • S . . :.I, ... •'.Ili ",_)IP \t 11 `.•41I 't lnla _.. ..:,) • 1.,::t1,.1 2;3 Snon S4:es- 22' So7er Shen ->(EA) EA S 192.73 8 • S 1,54124 S - 233 UGoa•d-3'Ulu a•d in "CET sect:ens->(POIEJ POLE 5 10423 8 • S 831E4 S - 33) Anchors ->(EA) EA S 2865 8 • S 233EA S - 3)1 GryVa'ker•Ye"onp'asttco.er for V.sb•ty ofdenn guy ->(EA) EA S 364 8 • S 2923 S - 3)2 Neer 35•47 vice-itn po'e for (ter atuchnents->[EA] EA S 59225 2 - S 1,18450 S • 3)3 - - S - S • 334 - S - S • 335 - S 5 . 3)6 - S - S ' 3)7 - S S . 333 5 S 30 - S • S • 310 - S S ?1F '1 .. ill.'>1 TOW .. ,.. AWL •STRA DAAS)L - 311 Po'sA_tachtent Hvdna-e(Not needed 4tnek.-ied in the labor once) ->[POLE] FOLE S 197.76 10 - S 1,977.60 S - 312 Lash'-s W re (Foot needed d i,Cu Jed in the labor price) ->(FT) FT S 005 4.0)) S 2400) S • 313 EN Strand -sill] FT S 1.13 400 S 4.5200) S 314 S • S . 315 S - S . 316 • - f S - 317 S - S - 318 - S - S . 319 - S - S . 320 - S - S - 321 1 • S - 322 - 1 S - 323 - - 1 - S •!, •I >TS • •.` t4,*-4 VAIU =t writ Base Bid Total Alternate A: (1)1" installed at 42" HDD and Pedestals Unta LABOR n • Division 2 BB Base Bid Division 1 FTTH Base Bid S 14443942.14 S 21,244.96393 FTTH Cost ' UNDUIGNOUNO LABOR 17 Drcct cnal Bore (1) 1',(0) 2', (0) 1.25- ->[LF) LF S 11.55 1,5559)1 S • S 18.6C5.042.45 26 V ss'e Bore (1) 1- cOndut 33' deep -sill) LF S 11.55 S • S - 46 ;Mt 'a:on. Untie rvco•.iF.ter Cab'e - InckJ rig S'ack (Rep.'s" Loose Tutt F.ttr)-->ILFI LF S 125 2,765202 S • S 3.455.502-9) 47 Irsta'abc•k Unfcrgrcund F.ter Cab'e-Ir.ct4 ng S'ack (V cro f ter m.st to b'enn in)->[LF) LF S 125 S • S - 49 tnsta'at.on, Peeista!->(EAl EA S 650) 12,336 S - S 833.843.0) 51 insta'a ten. 5•til Vas. I, 13' x 24' (Cc•T,,os te)->(EA) EA S 15000 S - S - 127 Install Nen Spce Case & Prep Cabe -'(EA) EA S 140 CO 3322 S • S 66-3,4)) CO 133 Prep cable in PED for NAP --,(EA) EA S 50 CO 12336 S • S 6166000 Matenal flea 177 12 CT F.ter Ca_'e- American Male• Loose Tote al d c'earic->(FT) FT S 033 713.097 S • S 235,318 71 178 24 CT 'bet Cable • Arerican Maie • Lease Tute al d t'ectoc ->(FT) FT S 0.40 625.044 S • S 250.017.60 179 49 CT F.ter Cave • American PJaie • Loose Tt.te a'1 d electric -'(FT) FT S 0 48 470,545 S • S 225.E51.60 1E0 95 CT f,t<r Cate • American Mai - Loose Tote a'I d Ctctr,c -it'll FT S 081 321.794 S - S 20.653.14 181 144 CT F.ter Ca_'e • American Male Loose Tube d FT S 1.16 453353 S - S 567.64).49 • a'i e'taU,c -'-(FT) 182 2160 Fiber Cable •American Male• Loose Tote al d t'tctric ->(FT) FT 5 195 S • S • 183 213 CI C.ter Cate-Ame(can Male• loose Tute a'Id (tar le -'(FT) FT S 240 145)79 S • S 2)0,7S1A) 184 12 CT M cro F.ter Cat. le • CorrrsscoFe: 8100597JD3 • B0121f4-F-M122✓714D ->(F T) FT S 0.49 S • S - 165 24 CT li cro F.ter Cable -Ccr.nscopt:8lf•...oas9/D3• 8024 Lt43F-3.1128014D->(FT) FT S 057 S • S - 1E6 43 CT Pt cro F.ter Cable -Cornscope:81C•0930IID3. (34441U-EF-F123al4D->(FT) FT S 090 S - S - 187 55 CT M cro F.ter Cab'e- Connscope: 81CO)99)3/133 - B-.0 5-tN-UAM123'114D->(FT) FT S 132 S - S - 1E3 144 CT M cro F.tuCat•4• Comnsco{t:810099)4/D3-B-14iU:4F-U128'JI4O->(f1] FT S 206 S S - 16) 223 CT M cro F.ttr Cable •(cni.SCP;a:81009727103-B-2E3lN-EF-M2i$!17T 20 -IFT) FT S 2.15 S • S • UNDERGROUND 207 5mal Va•_'t13*x24'•Co'ntaste• t1U33E11. 0113241EHDHD CON (0: ice- :went)->(EAJ EA S 403.05 S - S • 224 Ped-6'- Charles Ini • BD03}4EGT->IEA) EA $ 13470 11.755 S - S I,59S,7E650 225 Pei• 10'• (ha?(s Ini• 6D0305 EGT--'(EA) EA S 18531 552 S • S 102191.12 CLOSURES 229 FOSC 450E Closure •C4mr6Cc<: FOSC404E-624-1.80V->(EAJ EA S 282.02 S • S ' 230 Sp ce Irayfor B Gel Oostre (SM12)- Ccm-Int.t: FOSC-ACC-B-TPAY-24-14->(EA] EA S 1731 S - S - 231 Sack Bin tt for BGel Clos•.re • Comnscepe: FOSC-ACC-B-64S•ET-TALL -,(EA) EA S 4)73 S - S - 235 FOSC 450 D FOSC450-D66-72 1-07/->(EA) EA 5 335 C6 3.178 S • S 1.057,593ES Closure - Cannsco;e: 235 0 S2e sp' ce Tray- Cc•rnscc-;e: FOSC-ACC-D-TPAY-72a3T->((A) EA S 25.91 3.178 S - S 82.341.53 237 Sack Basket for DGeI Closure • Connmstc;e: FOSC-ACC-D BAS•ET•TALL ->(EA) EA S 22.13 E0) 5 • S 17,704 0) 242 Comm SCC;e CSC10) M cro(lon'e- CSC10) • CSC3USAIA1 WOO ->[EA) EA S 23374 S • S - 243 Cc•rcnscc•Fe C5CISOM cro Closure-05(150-CSCSCSA1A16J1.'i>.cal quote as aternate: OFDC-BEG•OF DC-BEG-414/0}3.)e-t;.72 EA S 245 CO S • S • Option A Bid Alternate B: (1)1" installed at 30" Missile and Pedestals Unto LABOR Ur, t (ost U-•t Cost B3 tints Fl7H V.nts 88 Option A S FTTH Option A S 28.871,973.76 B3 Cost FTTH Cost UNDERGROUND TABOR 17 Drcct.cnal Bore (1) 1', (0) 2',(0) 125' -Ili) lF S 11.95 S - S - 26 M4s'e Bore (1) 1' con% t 3)-deep->(LFJ LF S 11.95 1556931 S - S 18,05.042.45 46 insta"aton, Unitrgreoni F,ter Cable• Inc 4 ng S'ack (Rego'a• Loose Tute F.ter)->[LF) LF S 125 2.765202 5 - S 3,458.50250 47 Installation. UnitegrCi.4 F.ter Cable • Incloi '18 Slack (V cro !tee most be t'^An ri) -ILFJ LF S 125 5 • S - 49 Insta'aton, Pedestal ->(EA) EA S ES0) 12336 S • S 813.849 CO 51 ilsta•'aton, Smal Vat. 13' x 24'(Cor{os te) -ILA) EA S 1500) S - S SPuoF.'G 127 Instal Nett Sc' ce Case & Prep Cate ->[EA] EA S 20) CO 3.322 S - S 6E4.40)0) 133 Prep table in PED for/CAP->(EA) EA S 5000 12336 S - S 616.E030) M3ttri3' F43ER 177 12 CT F,tut Cab'e•Ar,nCan Marie • Loose Tute a'I d t'ectr,C->[FT] FT S 033 713,C37 S S 235,31571 178 24 CT F,ter Cable -An er.can &tale • Loose Tote al 6 ('earn ->(FTJ FT S 0.40 625.044 S - S 250.017.60 179 49 CT F.tee Cable -Ayer:can &tale • Lddse Tute al d e'ectr.c ->[FT] FT S 0 49 470,545 S - S 225 41.0) 1E0 95 CT F.ter Cable -Ayer:can &Fait• Loose TLte a'1 dc'cctnc->VT) FT S 0.81 321,794 S - S 260,653.14 181 144 CT F.ter Cabe- Amental Male- Loose Tute a'1 d e'tctr.e->(FT) FT S 1.16 459353 S • S 567.E49.43 182 216 CT F.ter Cable -Arencan Male- loose Tute al d e'ectrc->(FT1 FT S 1.95 S - S - 183 2E3 CT F.ter Case • ',metrical Male • Loose Tute a'1 d electric -IV T] FT S 2 CO 145379 S - S 290.759 00 184 FT S 0.4) S - S - 12 CT M ao titer Cable •Conrscope:810»>vJD3. 80124N-EF-M178V14D->[FT► 165 24 CT Mao F.ter Cable- Conrscope:81Wr,ay3/03- B-024-tf4-5F-M126'/I4)->(FT) FT S 057 S - S • 1E6 49 CT M cro F.ter Cable •Cc•mmsco;e:8t0:0-9)1/D3- B-049-LU$F-F113'1140->[FT) FT S 090 S • S • 187 56 CTMcfo F.ter Cable -Connsco;e:810099)3tD3-B4iSLN-EF-M128014D->(FT) FT S 132 S - 5 • 1E9 144 CT h• cro Fiter Cat 'e- Cormsco;e:SIC},'r)47D3• B-144-1tt-EF-%41230140 ->ffT) FT S 2.06 S • S - 169 2i3 CT Mao F.ter Cat 'e-Ccrenscope:8103i9727/D3•B-2691N-c.Fv24'Yr17F 20->(FT) FT S 2.15 S - S - EMOERGROUND 207 Snal Vatic, 13'x24'-Ccmtaste- HU33EtL•DT13241E?<OHD•av/(Or cGo vale n1-'(1A) EA S 403 C3 S - S - 224 Pei-6'- Chrles Ili- BO03)4-EGT->(EA) EA S 13470 11,755 S - S 1,5E33E650 225 Pei - 10' - Char:es hi- BD030SEGT->[EA) EA S 1E531 552 S - S 102291.12 CLOSURES 223 FOSC 450 BClosure •Comnscc;e: F05C45') B54-24.1-B7/->(EA) EA S 12202 S • S - 230 Sp' ce Tray for BGel(sosyre (SM12)• Connscope:f0SC-ACC-13-TRAY•24-Q1->(EA] EA S 17.31 S • S - 231 5'xk Basket for Et -Gel Closure •Conoco;t: FOSC•ACC•BBAS•ET•TALL->(EA) EA S 40.73 S - S - 235 FOSC 450 D Closure - Connsce;e: FO5C450O56-72•1•D7/->[EA) EA S 33506 3.178 S - S 11.67,953.63 236 D S•2e sp'ce Tray- Connsccye: FOSC-ACC-O-TPAY•72 fl->(EA) EA S 25.91 3.178 S - S 82,341.53 237 S'akBasket for Cs -Gel Closure - Cornsccye: FOSC-ACC-O-BAS•ET•TAlL->(EA) EA S 22.13 CO S - S 12704 0 242 Cornsccpe C5C10)11oo Closure- CSC10)-CSC3-USAIA1 BACC'3->(EA) EA S 23374 S - S - 243 Cornscopt C5C150Pi ao Closure •CSC150•CSCS-CSA1A1B4?)). cal quote as a'terna:e: OFDC-BEG-OFOC•B?G-:`:'GS`444-N-72 EA S 246.0) S • S - Option B Bid Alternate C: (1)1" installed at 42" HDD and Vaults 88 Option 8 $ FTTH Option 8 S 28.871.973.76 Ur.t• LABOR Un t Cost Unt Cost 83 Vo Cs FTTH Un t4 03 Cost FTTH C UNDERGROONO LABOR 17 D-recVtwl Bore) 1t(0)2', CO) 125' -VI) LF S 11.95 1,596.991 S S 18.606.042.45 26 ht.ss'el9:re( I) 1' coniut 30' deep->(tij LF S 11.95 S • S • 46 Insta"a:on, Unlergrooni F.ter Cable -Inoti-,g5'ack(Regular loose Tute F.ter)->(LFJ lF S 125 S - S - 47 Irsta'3i;n, Unit egret ni F.ter Cable •Indod rig 5'xt (V crof ter most to t'ann In).->(LF) LF S 1.25 3.346433 S S 4,183.10375 49 Insta"anon, Pcc''csta'->(EA) EA S 6900 S • S • 51 Irig a'3t-on, Smal Vault, 13' x 24'(Cc r; ste)->(EA3 EA $ 150.00 12325 S - S 1,849,750.CO SPLICING 127 Install Nen Sp' ce Case & Prep Cate -->((A) EA S 20000 15.526 S - S 3.105.2030) 133 Prepub'e in FED for NAP ->(EA) EA S 5000 - S - S • Maken3' BEER 177 12 CT F.ter Cat'e- Arer:can PJaie • loose Tote al d e'ectr.c->(FT) FT 5 033 S - S • 178 24 CT F.terCat'.- Ate roil Male • loose Tube a'1 d electric->(FTJ FT 5 0.40 S - S 179 49 CT F.ter Cabe - Artr.can Male- Loose Tute al d€ectric->(FT] FT S 0.49 S S • 1E0 95 CT F.ter Cab'e-Arerica, Male • Loose Tube al d electric -In) FT S 081 S - S • 181 144 CT F.ter Cate -American Male • loose Tube al d f ectr,c •->(F1) FT S 1.16 S • S - 182 216 CT F.ter Cate-Ar,irica, Male • loose Tote al d electric a(FT) FT S 1.95 S - S - 183 2E-3 CT F.ter Cabe -American Ma_'e- Loose Tube all d electric ->(FT) FT S 200 S - S 18A 12 CT le cro F.ter Cable •Cemrscope:810.v>a7VD3 • B-012-11(63-M12B'114D -'(FT) FT S 0.49 849.535 S - S 415.762.64 165 24 CT f.' ao liter Cate • Comnscope: 81C'Cifl9iD3 • B-024-04-EF-5.1123014D->(FT) FT S 057 762354 S - S 434.541.78 1E6 49 CTh'c,oliter Cable -Cornscope: 810099)1/D3. 6049 117<F-F12301CD -'(FT) FT S 090 611,118 S - S 50.06.20 187 %CTPea°F.ter Cable •Ccr.ascope:8100:99)3403- B-095-133-EF-M128'J140 -'(FT) FT S 132 331,927 S • S 504.143E4 1E9 144 CT FJ cro F.ter Cab'e- CGnnsc0;e: 810))))4.0D3-B-144 tN-EF-M128014D->(FTJ FT S 2.DS 572.076 S - S 1,178.47656 IS) 2E3 CT!'<toF.ter Cat 'e-Cc.rT.sce;e:610003727/D3-B-2E317:- Ef!'24SS/17T 20)->(FTJ Ft S 2.15 173.472 1 - S 3E5.514 p) 207 Sms'I Vau's.13'x24'• Composte- HU33ELL- DT 13241 EHOHDCLW (Or eau va'c-4)->(EAJ EA S 40805 12325 1 • S 5.02321625 224 Pei -8'-Chaves In!-B00304-EGT->(FAJ EA 5 134.70 - 1 • S - 225 Ped-10'- Cnv'es I i- BD03c5 EGT->(EAJ EA 5 18531 - S - S - aGSu9.ES 223 fOSC 450 B Closure -Corens<o;4: fOS(450846-24.1.87/->(EA) EA S 282.02 3.17e, $ - S 6;6.25936 230 Sp'ce Tray forBGel Closure (SM12)•Comms<ope: fOSC•ACC•B-TPAY•24-KR->(EA) EA 5 1731 3.I73 5 - S 55.011.18 231 Stack Basket for 8-Gel Closure • Cornmscope: FOSC.ACC•B-BIStET•TALL -a(FA) EA S 4373 E i) 5 - 5 32.5!4 W 235 FOSC 450 DClosure • Commscope FOiC45006.6-72.1.00J-a(EA) EA S 33606 S - S - 236 0 Sze sptce Tray • Commscopr. fOSC ACC•D•TRAY•7240T ->(EA) EA S 25.91 5 S - 237 Sack Basket for DGd Closute • Commscope FOSC-ACC•D-BAS'tfT-TALI -alEAJ FA S 2213 S - S 242 Commscope CSC100 Mao Closure • CSC100- CSC3-USAMA1BM00 -'fEAJ FA S 23474 10 r.)3 5 - 5 23F&11622 243 Cammscgx CSC150 Mao Closure -CX1SO-CSCS-CSAIAIBMOO, can quote as aterna:e: OFDC-BEG-OFOC-BEGd.\.'004Y44-72 EA S 24600 23:5 S S 576,870 C•) Option C Ilid Alternate D: (1) 1' installed at 30" Missile and Vaults LASOR V' t COST U-, t Cost 63 Un is FTTH U'. is 88 Option C $ •S 40.170.619.03 FTTH Option C 63 Cost FT111 COST UND(RGROONO LASOR 17 DrertC.-WBore (1) 1 ', (0) 2;(0)1.25' ->(UFJ IF S 11.55 S - S - 26 Mss'e Care (1) 1' condut 3)' dap -VS) IF S 11.55 1,558531 S - S 18.606.04245 46 Insta"atern, OndtryoundFaber Cabt-/-adngStack (P.egi,ar lease Tute F.ber)->(le) 11 S 125 S - S - 47 Insti at on, UndHyand Faber CaYe-1nckd ry Slack et cro f to must be Von" in) -silt) IF S 1.25 3.345.453 S - S 4183103 75 49 Insta'at CA Pea stat-s(EAJ EA S 63.00 S • S • 51 Insta'at cl Smil Veit. 13' x 24'(Comps te)->(EA) EA 5 151A0 12325 S • S 1 4875003 SPUONC - 127 Install New Spice Case& Prep Cade-s(EA) FA 5 20060 15.526 S • S 3,1052i003 133 Prep cab'e in PEO for NAP-s(EA3 EA S SO CO - S • S • !'3:er.31 0.- FBER • .'- 177 12 Cr F.t4rCa='e-Arer,cai Male- tense T.te al d e'irtrc->(FT) FT S 633 S - S - 178 24CTF.bc-r Cable -American Made- lone Tube alde'tctric-'(FT) FT S 0.40 S • S - 179 48 CT fiber Cade-Artrcal Made • Loose Tube a'Id electric ->(FT) FT 5 0.43 S • S - 180 96 CTF.bee Cable -American Made• Loose Tube a'Id electric-s(FTJ FT S 061 S S - 181 144 CT Faber Cab'e • American Made- loose Tube alde'ectric -s(FTJ FT 5 1.16 S - S - 182 216 CT Faber Cade - American Made • Loose Tube al d e'4ctric -a(FT) FT 5 1.95 S • S - 183 233 CT Fiber Cable - American Made • Loose Tube al d t'tctr:c ->(FTJ F T 5 260 S - S - 184 12 CTMao Faber Cabe-Commuope 816709392A 3-8-0124N-55F-'.t1234/140->(Ff) FT 5 0.49 848,534 S - S 415.782.64 165 24 CT Mao Faber Cade - Comrnscope: 81600939940e - B-024{H-E5-411234/140 -WI) FT s 057 762,354 S - S 436,541.78 186 43 CT Mao Faber Cabte-Commuope 810009901/OB-B-0z3iN-89412B4/14D->(FTJ FT s 0.93 611,11E 5 • S 55000620 187 96CTM.aoEta Cable -Commscope:810009933dDa.a-0 6.tN-854.412ar/14D-alFT) FT S 132 331,927 S S 504,14344 1 E 3 144 CT I.' cop Faber Cat'e - COrcnuope:810Y'990463 - B-144-tU-8F-M1284140 -'(FT) FT 5 2 05 572,076 S - S 1,174476-56 169 2E3 CTV uo F.torCat 'e-Co-rrnue;e:81CCC?727/03-B-2e3-1I:-EF-!'24::Y17T2C')->(fT1 FT S 2.15 170.472 S • S 3E5.51480 U? DEParkOUND - 207 Smil Vaot.13'x24•-Ccrn;,ste- HU33E11.- oT13241EHOHDC{W(Or etiuva'enU->(EA) EA 5 4:.305 12.325 S - S 5.02321625 224 Pad -6'-Chr:es t.i • 6D0334-EGT->(EA) EA 5 13470 - S • S - 225 Pad • 10'• Cha•:es Ind -BDO3)5-EGT->(EA) EA 5 16531 • S - S - aDsuREs aa_ ' 223 FOSC 450 B Clowre • Ccanmscope: FOSC450-86-6-24.1-67/ ->(EAJ FA 5 282.02 3.178 S - S 8%259-54 230 Sp.ce Trai for 8-Gel Closure (SM12)•Corrrscope: FOX•ACC-ElTRAY•24-Krt-s(EA) EA S 1731 3.178 S - S S5.011.18 231 Slack Basket for B-Gel Closure - Commscope: FOSC•ACC•B-BAS'FT•TALL ->(EA) EA S 40.73 E i) S - S 32.534 00 235 FOSC 4500 Closure- Cornmuope--FOX450-D6672.1•OW -,(EA) EA S 336-06 $ - S - 236 D Sze sp`-te Tray -Co'nrnscope FOSC-ACC-D-TPAY•72•KIT -'(EA) EA S 25.91 S - S - 237 Slack Basltt for DGd Clowre- Commscope: FOSC•ACC-D-BAMET•TALL ->(EAJ EA s 22.13 S - S - 242 ComrnscopeCSC100 Woo Closure - CSC' 00-CSC3435AIA18A000-'(EA) EA S 233_74 1O0)3 S - S 23E3,11622 243 COna mope CSC1 50 Mao Closure - CSCI 50 - CSC5-05A1A1 BA000. can gwte as aternate:Of DC-8SG • OFDC•B!G-t`G'OO.SN N•72 EA S 24500 2 345 S - S 576,870.0) Option D B{d Base Atern3te A: (1)1" insta'td at 42' HDD a -A Pedesta's Aternate B: (1)1' installed at 30' M-sole a-4 Pc-lesta's Aterna:e C: (1)1' installed at 42' HDD a d Waits A`.erru:e 0:: (1)1' Ensta'e4 at 30' M-ss't a-.i Vauts BB MN BB(OpNon BB Option D S FTTH Option D S 0,170.619.03 EMI don Total S 16.443.532.14. S 21244,963.93 NA NA NA S - S 28,871,973.76 S 16.443.932.14 S 50,116.937.69 S 46.565.919.83 S - S 28.871,973.76 S 16.443.532.14 S 50,116,937.69 S C6.565.919.83 S - S 40,170,61403 S 16,43.932.14 S 61,415,582-96 S 77.E64565.10 S - S 40.170.619.03 S 16443332-14 S 61,415.532.96 S 77,EC4 565.10