HomeMy WebLinkAboutITG Communications, LLC"SbALhU I3IU"
ITG ,Communications, LLC
FY 2023 CONSTRUCTION
OF A FIBLR-TO-THE-
PR[ .MISE
FEEDER/DISTRIBUTION
AND BACKBONE NETWORK
PROJECT
CONTRACT NO 1088
1
.:
• s.-
• F
'ti
•
BID BONI)
KNOW ALL BY THESE PRESENTS:
That we, ITG Communications, LLC
Fidelity end Deposit Company of Maryland and Zurich American Insurance Company
firmly bound unto city of Waterloo, Iowa
as Principal, and
, as Surety, are held and
, as
Obligee, (hereinafter referred to as the Jurisdiction"), in the penal sum of
dollars ($ ), or 5% percent of the
amount bid in lawfid money of the United States, for which payment said Principal and Surety bind
themselves, their heirs, executors, administrators, successors, and assigns jointly and severally, firmly by these
presents.
The condition of the above obligation is such that whereas the Principal has submitted to the Jurisdiction a
certain proposal, in a separate envelope, and hereby made a part hereof, to enter into a contract in writing, for
the following described improvements;
CONSTRUCTION OF A FIBER -TO -THE -PREMISE FEEDER/DISTRIBUTION AND BACKBONE
NETWORK PROJECT, CONTRACTNO.1088
The improvement includes the construction of the necessary components to create the high-speed FTTP
XGS-PON communications Network (the Project) within the City's defined Service Area and prepare it
to deliver backbone and fiber -to -the -home services. The system shall be a fully operational high-speed
communications network supporting Internet protocol technology and allowing users access to and from
the Internet. The Project requires the construction of a Fiber to the Premise feeder/distribution and a
backbone network which will support XGS-PON technologies to be utilized to deliver best -effort and
guaranteed services to its customers within the City Service Area.
The design identifies the placement of FDH's located at the City data center and network PoP's. These
locations will also house active electronics and splitters in support of the F 11 P deployment, Fiber routes
to be built by contractor and operated by the City and the Waterloo Telecommunications Utility will be
utilized to interconnect these FDHs in a fiber ring topology.
Fiber routes are Laid out logically to economically connect each service area back to the local cabinet
located at the headend or alternate node site, Architecture is a star design for the feeder network and a ring
connecting network nodes.
The Project will be located at various locations throughout the City.
The City has active grant applications into federal funding agencies for portions of the backbone only
(Division 2 work) In the event of a grant award, the City reserves the right to remove the Division 2
work from the Contract, with a reduction in fee to the Contractor equivalent to the bid price
associated with the Division 2 work. The City anticipates that a decision regarding the Division 2
work will be made on or before August 1, 2023.
FY 2023 Construction of A Fiber-To-Tho-premise Feeder/Dlatrlbullon And Backbone
(CONT. BID BOND) Project Name Network Prided, Contreot No. 1088
The Surety hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way
impaired or affected by any extension of the time within which the Jurisdiction may accept such bid or execute
such Contract and said Surety does hereby waive notice of any such extension.
In the event that any actions or prove dings am initiated with respect to this Bond, the parties agree that the
venue thereof shall be Black Hawk County, State of Iowa. If legal action is required by the
Jurisdiction against the Surety or Principal to enforce the provisions of the bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Surety or Principal agrees to pay the Jurisdiction all
damages, costs, and attorney fees incurred by enforcing any of the provisions ofthis Bond. All rights, powers,
and remedies of the Jurisdiction hereunder shall be cumulative and not alternative and shall be in addition to
all rights, powers and remedies given to the Jurisdiction, by law. The Jurisdiction may proceed against Surety
for any amount guaranteed hereunder whether action is brought against Principal or whether Principal is
joined in any such action or actions or not.
NOW, THEREFORE, if said proposal by the Principal be accepted, and the Principal shall enter into a contract
with Jurisdiction in accordance with the terms of such proposal, including the provision of insurance and of a
bond as may be specified in the contract documents, with good and sufficient surety for the faithful
performance of such contract, for the prompt payment of labor and material famished in the prosecution
thereof, and for the maintenance of said improvements as may be required therein, then
this obligation shall become null and void; otherwise, the Principal shall pay to the Jurisdiction the full amount
of the bid bond, together with cont costs, attonney's fees, and any other expense of recovery.
Signed and sealed this 12th day of June
SURETY:
Fidelity and-D
Zurieh Ame
posit Company of Maryland and
n Insurance Company
Surety Company
ey-in-Fact/Officce
�efher?r
A dtedName ofAttorney-in-Fact/Officer
Fidel ty end Deposit Company of Maryland and
Zutloh Amerban Insurance Company
Company Name
1299 Zurich Way, 61h Floor
Company Address
Schaumburg, IL 60196-1056
City, State, Zip Code
(847) 605-6000
Company Telephone Number
PRINCIPAL•
, 20 23 .
ITG Communications, LLC
152 Molly Wakon Ochre
Address
Hendersonville, TN 37075
City, State, Zip Code
305 978 9095
Telephone Ntunber
NOTE: All signatures on this bid bond must be original signatures in ink; copies, facsimile, or electronic
signatures will not be accepted. This bond must be sealed with the Surety's raised, embossing seal. The
Certificate or Power of Attorney accompanying this bond must be valid on its face and sealed with the Surety's
raised, embossing seal.
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE §1189
A notary public or other officer completing thls certificate verifies only the identity of the individual who signed the
document to which thls certificate Is attached, and not the truthfulness, accuracy, or validity of that document.
state of California
County of Los Angeles
On JUN 12 2023 before me D. Garcia, Notary Public
Date
Here Insert Name and Title of the Officer
Personally appeared Simone Gerhard
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in his/her/thelrauthorized
capacity(ies),andthatbyhis/her/theirsignature(s)ontheinstrumenttheperson(s), or the entity upon behalf of
which the person(s) acted, executed the Instrument.
D. GARCIA
COMM. #2354770 z
Notary Public • California o
Los Angeles County
Comm Expires A r. 18, 2025
Place Notary Seal Above
I certify under PENALTY OF PERJURY under the laws of the
State of California that the foregoing paragraph is true an
d correct.
WITNESS my hand and official se
Signature
OPTIONAL
Signature of Notary Public
Though this section Is optional, completing this information con deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document
Document Date
Number of Pages Signer(s) Other Than Named Above
Capacity(ies) Claimed by Signers)
Signer's Name Signer's Name
D Corporate Officer—Title(s)
Partner 1 Limited ® General
Individual jr] Attorney in Fact
DI Guardian or Conservator
Trustee
L1 Other
Signer Is Representing
iw
Corporate Officer—Title(s)
El Partner _ Limited ®General
Li Individual D Attorney In Fact
Ei Trustee 0 Guardian o Conservator
0 Other
Signer Is Representing
ZURICII AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by
Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are
set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute,
and appoint B. ALEMAN, Ethan SPECTOR, Timothy NOONAN, Janina MONROE, Adrian VALENZUELA, Jennifer OCHS, Aidan
SMOCK, Lisa CRAM, Simone GERHARD, Erin BROWN, Paul RODRIGUEZ, Emily NEWELL, D. GARCIA, KD WAPATO, Marina
TAPIA, Edward C. SPECTOR, Ethan SPECTOR of Los Angeles, California, its true and lawful agent and Attorney -in -Fact, to make,
execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution
of such bonds or undertakings in pursuance of these presents, shall he as binding upon said Companies, as fully and amply, to all intents and
purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE
COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND
SURETY COMPANY at its office in Owings Mills, Maryland,, and We regularly elected officers of the FIDELITY AND DEPOSIT
COMPANY OF MARYLAND at its office in Owings Mills, Matyland., in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 07th day ofFebruary, A.D. 2022.
�oS mm A 3afC ��' Sc'▪ `k/4P. "�!�a:
By: Robert D. Murray
Vice President
iy�C(�Vrli
By: Dawn E. Brown
Secretory
mmiii0,0. �ihu,ua nio••c`Q ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY 01 MARYLAND
State of Maryland
County of Baltimore
On this 07th day ofFebruary, A.D. 2022, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D.
Murray Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who
executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of
the Company aforesaid, and that the seals affixed to the preceding instrument aro the Corporate Seals of said Companies, and that the said Corporate Seals and
the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. •
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
R¢ ryk.sP
thr
Constance A. Dam, Notary Public
My Commission Expires: July 9,2023
Authenticity of this bond can be confirmed at bondvalidator.zudchna,com or 410-559-8790
NON -COLLUSION AFFIDAVIT OF PRIME BIDDER
State of Tennessee
) ss:
County of Coffee
Bryan Siebenberg , being first duly sworn, deposes and says
that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of ITG , the Bidder
that has submitted the attached Bid;
2. He is fully -informed respecting the preparation and contents of the attached Bid and of all pertinent
circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid:
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees,
or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed,
directly or indirectly, with any other Bidder firm or person to submit a collusive or sham Bid in
connection with the Contract for which the attached Bid has been submitted or to refrain from bidding
in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or
collusion or communication or conference with any other Bidder, firm or person to fix the price or prices
in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price
or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or
unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in
the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any
collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any of its
agents, representativ- _ owners, employees, or parties in interest, including this affiant.
(Signed
VP of Operations
Title
Subscribed and s orn a be re me this ?)f day of 16 2
nmisslon Explros 06-18-2024
My commission expires
\` SEE IANN N0 /e�
�,••• tie '.
CO •• •��
BIDDER STATUS FORM
o To be completed by all bidders
PART A
Please answer "Yes' or "No' for each of the following:
Q Yes
Q Yes No
Q Yes
Q Yes ! No
Q Yes
No
My company is authorized to transact business in Iowa.
(To help you determine if your company is authorized, please review the worksheet on the next page).
My company has an office to transact business in Iowa.
My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail.
My company has been conducting business in Iowa for at least 3 years prior to the first request for
bids on this project.
My company is not a subsidiary of another business entity, or my company is a subsidiary of
another business entity that would qualify as a resident bidder in Iowa.
If you answered "Yes' for each question above, your company qualifies as a resident bidder. Please
complete Parts B and D of this form.
If you answered "No" to one or more questions above, your company is a nonresident bidder. Please
complete Parts C and D of this form.
o To be completed by resident bidders
PART B
My company has maintained offices in Iowa during the past 3 years at the following addresses:
Dates: / / to / / Address:
City, State, Zip:
Dates: / / to / / Address:
City, State, Zip:
Dates: / / to / / Address:
You may attach additional sheet(s) if needed.
City, State, Zip:
o To be completed by non-resident bidders
PART C
1. Name of home state or foreign country reported to the Iowa Secretary of State:
2. Does your company's home state or foreign country offer preferences to resident bidders, resident labor
force preferences or any other type of preference to bidders or laborers?
3. If you answered "Yes" to question 2, identify each preference offered by your company's home
state or foreign country and the appropriate legal citation.
You may attach additional sheet(s) if needed.
o To be completed by all bidders
PART D
I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my
failure to provide accurate and truthful information may be a reason to reject my bid.
Firm Name: Bryan Siebenberg
Signature: Date: 6/13/2023
You must submit the completed form to the governmental body requesting bids per 875 Iowa Administrative Code
Chapter 156. This form has been approved by the Iowa Labor Commissioner
WORKSHEET: AUTHORIZATION TO TRANSACT BUSINESS
This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following
describes your business, you are authorized to transact business in Iowa.
O Yes
O Yes
O Yes
O Yes
O Yes
• Yes
O Yes
Q Yes
Q Yes
My business is currently registered as a contractor with the Iowa Division of Labor.
My business is a sole proprietorship, and I am an Iowa resident for Iowa income tax purposes.
My business is a general partnership or joint venture. More than 50 percent of the general
partners or joint venture parties are residents of Iowa for Iowa income tax purposes.
My business is an active corporation with the Iowa Secretary of State and has paid all fees
required by the Secretary of State, has filed its most recent biennial report, and has not filed
articles of dissolution.
My business is a corporation whose articles of incorporation are filed in a state other than Iowa,
the corporation has received a certificate of authority from the Iowa secretary of state, has filed
its most recent biennial report with the secretary of state, and has neither received a certificate of
withdrawal from the secretary of state nor had its authority revoked.
My business is a limited liability partnership which has filed a statement of qualification in this
state and the statement have not been canceled.
My business is a limited liability partnership which has filed a statement of qualification in a
state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of
cancellation has not been filed.
My business is a limited partnership or limited liability limited partnership which has filed a
certificate of limited partnership in this state and has not filed a statement of termination.
My business is a limited partnership or a limited liability limited partnership whose certificate of
limited partnership is filed in a state other than Iowa, the limited partnership or limited liability
limited partnership has received notification from the Iowa secretary of state that the application
for certificate of authority has been approved and no notice of cancellation has been filed by the
limited partnership or the limited liability limited partnership.
My business is a limited liability company whose certificate of organization is filed in Iowa and has
not filed a statement of termination.
My business is a limited liability company whose certificate of organization is filed in a state other
than Iowa, has received a certificate of authority to transact business in Iowa and the certificate
has not been revoked or canceled.
309-6001 (09-15)
CITY OF ,..
(9
ij44TERLOO IOWA MBE/WBE BUSINESS ENTERPRISE PRE -
corn munity of Opportunity BID CONTACT INFORMATION FORM
P rime Contractor Name: ITG Communications, LLC
Project: FY 2023 Construction of a FTTP Feeder/Distribution
Letting Date: 6/13/2023
N O MBE/WBE SUBCONTRACTORS: If you are NOT using any MBE/WBE subcontractors to complete this
project, sign below. AttaehTh brief explanation as to why subcontracting was not feasible with this project. If
any MBE/WBE subcontr tors will be used, please use the bottom portion of this form.
i9
Contractor Signature:
Title: VP of Operations
Date: 6/13/2023
S UBCONTRACTORS APPLICABLE. You are required, in order for your bid to be considered responsive, to
provide the information on this form showing ALL of your MBE/WBE subcontractor contacts made for your
bid submission.
This information is subject to verification. Any questions may be directed to Contract Compliance Office 319-
291- 4429.
You are required, in order for your bid to be considered responsive, to provide the information on this Form
showing your MBE/WBE Business Enterprise contacts made prior to your bid submission. This information is
subject to verifications and confirmation.
If you are unable to identify MBE/WBE firms to perform portions of the work, please contact Rudy Jones, Contract
Compliance Officer, for assistance at (319) 291-4429.
In the event it is determined that the MBE/WBE Business Enterprise goals are not met, then before awarding
the contract the City of Waterloo will make a determination as to whether or not the apparent successful low
bidder made good faith efforts to meet the goals.
TABLE OF INFORMATION SHOWING BIDDER'S PRE -
BID MBE/WBE BUSINESS ENTERPRISE
CONTACTS
Quotes
Rcccived
Quotation
used
In
bid
Subcontractors
MBE/WBE
Contacted
Dates
Yes/No
Contacted
Dates
Yes/No
Dollar
Amount
be Subcontracted
Proposed
to
Carter
Electric
4/10/23
No
4/24/23
NO
Culpepper
Electric
4/10/23
No
DC
Coproration
4/10/23
No
I-ype
text
Bryan Siebenberg
Form CCO-4 Rev. 06-20-02
MBE/WBE BUSINESS ENTERPRISE
PRE -BID CONTACT INFORMATION FORM
INSTRUCTIONS
Prime Contractor Responsibilities:
Prime Contractors bidding on City of Waterloo contract work are required to ensure that MBE/WBE
businesses are provided the opportunity to participate in the performance of contracts and subcontracts.
Prime contractors are required to assist MBE/WBE businesses in overcoming barriers to participation and
must make good faith efforts to secure bids from, and award subcontracts to, MBE/WBE businesses. For
all contract bids of $50,000 or more, the following is required to demonstrate good faith efforts in
accordance with this policy:
1. "MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION FORM" submitted with the
prime contractor bid, properly completed and signed on Form CCO-4 (Rev. 06-20-02). Please note that
this document must include all subcontractor contacts, bids received, and awarded - not just those
related to disadvantaged business enterprise vendors.
2. A minimum of three (3) MBE/WBE business contacts must be made and documented, if there are at
least three (3) MBE/WBE businesses offering services in the areas to be subcontracted (see City of
Waterloo MBE/WBE Certified List). If less than three (3) are offering the services to be subcontracted, then
a contact is required for any that are listed as providing that service. If you have submitted a MBE/WBE
contact not on the City's MBE/WBE list, attach a copy of the certification from another government agency.
3. Contacts to each MBE/WBE businesses are required to be a minimum of seven (7) working days
prior to the date the pnme contractor submits the bid to the City of Waterloo.
4. The following documentation must accompany the "MBE/WBE BUSINESS ENTERPRISE PRE -BID
CONTACT INFORMATION FORM" for each MBE/WBE business contacted:
a. A copy of the bid received from the MBE/WBE, OR
b. If no bid was received, a copy of correspondence received from the MBE/WBE with a "no
bid" response, OR
c. If no response was received, a copy of the solicitation sent to the MBE/WBE with proof of
mailing attached.
5. If any MBE/WBE business submitting bids are not selected for subcontract award, documentation
must accompany the "MBE/WBE BUSINESS ENTERPRISE PRE -BID CONTACT INFORMATION
FORM" on why the MBE/WBE was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be required for verification.
b. MBE/WBE did not bid, withdrew bid or was n o n -responsive.
c. Documentation of other business -related reason for not selecting the MBE/WBE business
for a
subcontract.
d. Prime contractor self performs work.
e. Any other reason relied on by the Prime Contractor.
f.
The Contract Compliance Officer will determine the weight to be given to each item listed above
(supported by appropriate documentation) based on overall program goals.
Fenn CCO-4A Rev. 07-013-02
FORM OF BID OR PROPOSAL
FY 2023 CONSTRUCTION OF A FIBER -TO -THE -PREMISE
FEEDER/DISTRIBUTION AND BACKBONE NETWORK
PROJECTCONTRACT NO. 1088
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council Waterloo, Iowa
Gentlemen:
The undersigned, being a Corporation existing under the laws of the State of Tx a Partnership
consisting of the following partners: Private Equity Majority Owned having familiarized (himself) (themselves)
(itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract
documents listed in the Table of Contents and Addenda (if any), as prepared by Magellan Advisors for the
City of Waterloo now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to
furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and complete this F.Y. 2023
CONSTRUCTION OF A FIBER -TO -THE -PREMISE FEEDER/DISTRIBUTION AND BACKBONE
NETWORK PROJECT, Contract No. 1088, all in accordance with the above -listed documents and for the
unit prices for work in place for the following items and quantities contained in Attachment B. The contractor
shall submit a copy of Attachment B as part of their bid. The sum of Division 1 (FTTP) Base Bid Total and
Division 2 (Backbone) Base Bid Total, plus one Alternate from Groups A, B, C, or D, shall be used to
determine the Lowest Responsible Bidder.
FY 2023 CONSTRUCTION OF A FIBER -TO -THE
PROJECT
-PREMISE FEEDER/DISTRIBUTION AND BACKBONE NETWORK
CONTRACT NO. 1088
Description
Total Cost
DIVISION 1 BASE BID WORK- FTTP
$15,100,874.07
DIVISION 1 BASE BID TOTAL PRICE
$21,244,963.93
DIVISION 2 BASE BID WORK - Backbone
based on federal funding decision)
(subject to removal
$13,281,835.68
DIVISION 2 BASE BID TOTAL PRICE
$16,448,982.14
BASE BID TOTAL (DIVISION 1 + DIVISION
2)
$ 37,693,946.07
BASE BID TOTAL (DIVISION 1 + DIVISION
2)+ALTERNATE A
$66,565,919.83
BASE BID TOTAL (DIVISION 1 + DIVISION 2) + ALTERNATE B
$66,565,919.83
BASE BID TOTAL (DIVISION 1 + DIVISION
2) + ALTERNATE C
2) + ALTERNATE D
$ 77,864,565.10
$77,864,565.1 O
BASE BID TOTAL (DIVISION 1 + DIVISION
1. It is understood that the quantities set forth are approximate only and subject to variation and that the
unit bid price for the work done shall govern in the actual payment to Contractor.
FORM OF BID
CONRACT NO. 1088
Page 1 of 3
2. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa,
to reject any or all bids. The undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificate of the insurance within ten (10) days
after the agreement is presented to him for signature and start work within five (5) days after "Notice
to Proceed" is issued.
3. Security in the sum of Dollars
($ ) in the form of is submitted herewith in accordance with the INSTRUCTIONS TO
BIDDERS.
4. Attached hereto is a Non -Collusion Affidavit of Prime Contractor.
5. Attached hereto is a Bidder Status Form.
6. The bidder is prepared to submit a financial and experience statement upon request.
7. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in
work for the City in the current calendar year, are prepared to submit an AAP or Update and an EOC,
within ten (10) days of notification that the bid submitted acceptable.
8. The bidder has received the following Addendum or Addenda:
9. Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), number of subcontracts and bid items on the
City of Waterloo Minority and/or Women Business Pre -bid Contact Information Form submitted with
this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s)
to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non -Collusion Affidavits of All Subcontractor(s).
11. The Contractor shall be required to provide a State of Iowa Contractor Registration Number for all
their employees and those of their subcontractors engaged in work at the site, in accordance with
State Laws. No bids will be awarded until the Contractor and subcontractors have been confirmed
within seven (7) days after the bid opening.
12. The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND
APPROVAL" Form to be provided by City prior to approval of contract. The Contractor shall not use
more than 50% subcontractor labor during any portion of the project unless pre -approved by the City.
13. The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer
cannot be changed except for the following reasons:
a. The City of Waterloo does not approve the subcontractors.
b. The subcontractors submit in writing that they cannot fulfill their subcontracts.
14. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none" or
"NA".
15. The bidder has attached all applicable forms.
16. This bid includes a fiber -to -the -premise and fiber backbone projects as outlined below:
FORM OF BID
CONRACT NO. 1088 Page 2 of 3
1) Fiber to the Premise (FTTP): the FTTP network will pass all residents and businesses of
Waterloo. The FTTP network includes 390.54 miles of underground construction to pass
roughly 29,400 premises throughout the City of Waterloo.
2) Fiber Backbone: the backbone includes 115.80-miles of underground construction along major
city corridors and key commercial areas connecting hundreds of City, traffic and utility sites, and
facilities.
Phasing/Work Order Plans:
• Phase 1 Fire Station 6 ("Backbone and Laterals") is an area consisting of approximately 38.99
miles of underground backbone and distribution fiber covering the South area of Waterloo, to
connect 116 city facilities. Phase will be broken into multiple work orders.
o Phase IA is a 191.81-mile underground fiber connection from Fire Station 6 Point
of Presence (PoP) location extending out to the City of Waterloo service area.
• Phase 2 Linden Tower ("Backbone and Laterals") is an area consisting of approximately 42.57
miles of underground backbone and distribution fiber covering the Northeastern area of
Waterloo, to connect 76 city facilities. Phase will be broken into multiple work orders.
o Phase 2A is a 98.58-mile underground fiber connection from Linden Tower Point
of Presence (PoP) location extending out to the City of Waterloo service area.
• Phase 3 Fletcher Lift Station ('Backbone and Laterals") is an area consisting of approximately
34.24 miles of underground backbone and distribution fiber covering the Northwestern area
of Waterloo, to connect 167 city facilities. Phase will be broken into multiple work orders.
o Phase 3A is a 100.15-mile underground fiber connection from Fletcher Lift Station
Point of Presence (PoP) location extending out to the City of Waterloo service
area.
City intends the Network to serve as a development platform for innovation, next generation
application development, workforce development, and job creation, and to provide an overall better
quality of life throughout the Service Area.
The City has active grant applications into federal funding agencies for portions of the
backbone only (Division 2 work). In the event of a grant award, the City reserves the right
to remove the Division 2 work from the Contract, with a reduction in fee to the Contractor
equivalent to the bid price associated with the Division 2 work. The City anticipates that a
decision regarding the Division 2 work will be made on or before August 1, 2023.
BY: Bryan Siebenberg VP of Operations 6/13/2023
(Name of Bidder) (Title) (Date)
Official Address: (Including Zip Code):
154 Molly Walton Dr
Hendersonville TN 37075
I.R.S. No.
FORM OF BID CONRACT NO. 1088 Page 3 of 3
Base Bid
Unts LASOR
Al I ne .terns 16ck4 rg zero coantly should ha.e al 'U-.t Cost' (rlry
Unt Cost
V n t Cost
Division 2
83 U-.ts
Division 1
FTTH Vats
Division 2
03 Cost
Division 1
Intl Cost
1
Dact-ov*B: re (1) 1',(2)2',(3) 125'->(153
LE
S 2625
3e9
•
S
1021125
S
-
2
D rcct•ovl Bde (')) I., (2) 2', (3)1 25' -1151
LE
S 2025
12E4
49
S
25.556 W
S
59225
3
D rtct-ona! Bcre (1) 1', (0) 2', (3)125" -Ili)
Lc
S 1815
136394
S
2.475.551.10
S
-
4
0recto-sal Pore (1) 1',(1)2',(3) 125'-sill)
1E
S 2325
1.018
-
1
20.61450
S
-
5
0rcctcv' ere(0) 1',(1)2',(3) 125'->(tF)
lc
S 11115
9.459
S
171/1085
S
-
6
15rectonal Bare (0)1', (G) 2'. (3) 125' ->(J)
LE
S 1585
164.244
•
S
2,(03267.4)
S
-
7
0 rcctona' Bore (2) 1', (G) 2', (3) 125' ->(t0)
LE
S 2025
176
•
S
3.564.0)
S
-
8
I)redone' Bore(G) 1',(1)2',(05125'-allF)
LE
S 11.95
S.EO2
97.E09
S
65,94390
$
1,1/381735
9
D recto -al Bsre (0) 1', (2)2L(0) 125'-sill)
LE
S 1375
3.2E5
21.972
S
45,18250
S
3)2.1150)
10
D sect cn3! Bore (0) 1',(0) 2'.(3) 125'->(Lf9
1F
S 1815
13)
•
S
2.35950
S
-
11
Dien roil Boce(1) 1',(0)2',(4) 125" ->(LFJ
LE
S 2025
626
•
S
12.676.50
S
•
12
O rectonal Bore (2) 1',(2) 2', (3)125' ->(LF]
LF
S 28-50
26
-
S
741.00
S
•
13
O rest one Bore (0) 1t(4) 2'.(0) 125'->(LFI
LF
S 1815
26
2)7
S
471.53
S
5,350-55
14
Otect anal Bore (0) 1%(012'. 12) 125'-7(1.F3
LE
S 13.75
94,929
26
S
1,305.273 75
S
357.50
15
0rect0nal Bore (1) 1',(012', (2) 125" -,(LE)
if
S 1515
113.903
151
S
1105,441 EJ
S
2,39335
16
D red *nal Bore (0) 1t(0) 2'. (1) 1.25' -s((5)
IS
S 11.95
323
S
3.8598S
S
-
17
D recta-nal Bs:e (1) 1',(&}2',(0) 125'->(LE)
LF
S 11.95
-
3,19253
S
-
S
465137335
18
D'rectonal B-re(0) 1',(3) 2', (0) 125'->(11)
LF
S 1585
-
3.650
S
-
S
59.415�50
19
Oma onal Bye (I) 1%(1)2',(0)125' ->(1.9
LF
S 13.75
-
103.676
S
S
1425.545 CO
20
Ortct teal Bore(2) 1',(0)2',(0) 125' -'(LF)
LF
S 1375
-
129
S
-
S
1,77375
21
0 rat ono? Bore (l) 1'. (2)2', (0) 125'->1t9
LE
S 1585
-
4.742
S
•
1
75.1E0.70
22
0rectonal B:re(2)1%(1)2',(0)125' -IfLE)
LF
S 1585
-
59
S
-
S
935.15
23
Oact c"vl Bore (I) 1',11)2',(2) 125'->[LE)
LE
S 1815
9.837
•
S
178541.55
S
-
24
0 ma omit Bore (0)14, (2) 2'. (2)125" -sflc)
LE
S 1815
3963
-
S
71,92345
S
-
25
Drectcial Bore (0) I'. (1)2'.(2) 125' -'(LF)
LF
5 1565
14.559
-
S
23725365
S
-
26
V ss 'e Bore (1)1'co-do t 3)'deep -7(l5)
LF
S 11.95
-
S
•
S
•
27
Pal (4) 2' sdr 11 conskuts in b' cos Ag -'(FT)
FT
S 22.50
•
•
S
•
S
-
28
Bore 6'Cas'g (Sttt)->(LF)
LE
S 6210
100
•
S
6.20000
S
-
29
Bore 6'Cas'g(FYC)-5[LF)
LF
S 340)
10)
•
5
330003
S
-
30
Bose 8' Cas rig (Steel ->[1F)
LF
S no)
1D)
S
73A-W
S
-
31
Bore 8' Cas-g(PVC) -,[1.E)
LE
S 39 CO
2,632
1.034
S
102.64S00
S
403260)
32
Deep &:re -Watt r Cross-g ->fllj
LE
S 61.50
100
-
5
6.15000
S
-
33
Instal Vuitton in lien Condo t ->frT]
FT
S 025
1.733E45
376,707
S
434151.5O
S
94176.75
34
Bore Rock Adder -sill)
LE
S 4375
-
-
5
-
S
-
35
Tre.-.ch Rock Ad-'cr -5(15)
Lc
S 3225
-
-
S
-
S
-
35
Instal *12 AWG lr.s'.'a:ed Tracer W.re ->(LE)
lc
S -
518.538
2$S5.454
S
-
S
-
37
Instal 5/81T' Copper Clad Grc+.ni Rod -1EA1
EA
S 520)
276
1,039
S
1435210
S
54.028W
33
Instal 35'DaPVC P.coniVarlet Posts M' th Orange Dome Top ->(EAI
EA
S 2510
676
6.181
S
16.95300
S
1543250)
33
Instal 35' Da FVC Coon! Marl er Posts n th Orange Oare Top vs th Test Stwm -1E4)
EA
S 650)
234
7C57
5
152100)
S
1343550)
4)
Instal RE:O Ba'/Peg hrah ers->(EA)
FA
S 5.00
-
-
S
-
S
-
41
Instal RF:D ReFe-s[ll]
LE
S -
-
S
-
S
-
42
Proof Existing Ctnivt- arys•ne -siLl)
LF
S 13S
S
S
-
43
Rod E. 4ting Coniv t as Instal FVl Tape->LLF)
LF
f 1.65
S
S
-
44
Re ciao.* tist,-gUlee -ie.coa MJt&sled par in street l gist CC -do is to rep'3ce lath f 8er->((F)
LF
S 135
•
•
S
•
S
•
45
Insta'atcn. Uvdergros,nd F.ter Cabe • r,C. 4 rg Slack (2ct F.ter)->[L5)
LF
S 1.15
S
-
S
-
45
Instela:.. Vndergro!.-dFitt/ Cable •1.<4.4 'kj vats (REgalar loose Tote F.ter)-sill)
LF
S 120
$59,118
571,020
S
7O5.941.E0
S
65522403
47
Instigation, U.-dergrct-dF.ter Cate-to{1-4 ng Slack (V coo ter most to roan in)->(19
LF
S 120
S
-
S
-
49
Lnsta"ation, MST In Pedestal _>(EA1
EA
S 35-00
-
S
-
S
-
4)
Insta'a:wn, Pedestal ->(EA)
EA
S 69.00
S
•
S
-
50
Lnst3'ation, Drop Mao 't. 12' X 12' ->(EA)
EA
S 45.0)
-
-
S
-
5
-
51
IAsta"a5on, Small Vac.\ 13' x 24' (Campos tt)-ILEA)
EA
S 150.05
S
-
S
-
52
Irsta'aton, Snail Vr.t 17' x 30' -'(EA]
EA
S 1E0.00
44
16
S
7,920-W
S
2.8E0 CO
53
1 :s+a'lotion, Vao's 244 x 35" -'(EA)
EA
S 24510
1p33
3353
S
240.720 0)
S
813,/2000
54
lrst3'a5on, Large Vaal 35' x 45' -s((A)
EA
S 42010
137
14
S
57.54).0)
S
500 W
55
rstea5on. Extra Large Vaol 45' x CO' ->(EAJ
EA
S 54010
55
122
5
29.700.43
S
65,E9)A)
56
Instal 444'44' Sp' t Concrete Ma'hee -'(EA)
EA
S 1,500150
-
-
S
•
S
-
57
P.tno.e aal Replace H ni>o'e - intid -g I rg sweeps i ::o HH ->(EA)
EA
S 775.0)
-
-
S
-
S
-
59
Prep a-4 Poor Cc.-trtte Pei for POP Ste -s(EA)
EA
S 820O03
-
-
S
S
•
59
Sae.crrt Rtnaye and Replace Asphalt 6'Thck-'(SgrFt)
SG'Ft
S 2810
6,060
13,705
S
169.670b7
S
353.77733
E0
Sanmt Pecrdwe and Replace Co crcte 6' Thck-'(S3rFt)
S, Ft
S 32 W
6.050
13.7C5
S
193.95933
S
433 0267
61
P.Emo.e an! P..ep'ace Brck Pacers ->(S, Ft)
SGrFt
S 2810
S
-
S
-
62
Sanctt. Renao.e and Revace Asphalt 6' Pack ->(Sgrft)
SGrFt
S 3000
6,060
13,705
S
181,790_03
S
411,19)W
63
SaACIA. REm].e ani Rep'ace Concrete 6' Thck->(SgrFt)
5;'Ft
S 3300
6,C60
13.705
S
19356910
S
45235910
E4
Sancot. Re.rso.e a-4 P.cp'3te Asp'aat 10' Thck->(5)41)
SGrit
S 31.00
6160
13,706
S
187149.67
S
424,6i633
65
Sancut P.e.ry.eand Rep'3Ce Concrete 10' Thck->(SgrFt)
Silt
S 34 CO
6,09)
13,7055
S
206.02867
S
4E6,01533
E5
-
•S
S
-
67
-
S
-
S
-
.. - f rla.
.1nI4.
•. ,. j J.. .t
AERIAL 4STIVADrM5N
E3
tas'vVc'.0 Cbwre->(EA)
EA
S 11503
-
S -
S -
69
B±ni Stra-d/Gtry to pole grcc,r] a materials -7(EA)
EA
S 1050
10
S 105 03
S -
70
Instal Strand ->(FT)
FT
S 1.0)
4,0)3
-
S 4.0».W
S -
71
instal Snort S>.tes->(EAJ
EA
S 105.00
-
-
S -
S •
72
InstalMN'Slack ->((A)
EA
S 1.45
400
-
S SE000
S •
73
Insta I/ Lash Aerie! Cabe->(FT1
FT
S 1-5')
4O))
-
5 6.0)0 W
S -
74
Tree Trrnrg-gm
FT
S 225
403
-
S 9)).00
S -
75
InstalI Pee R sers->((AI
EA
S 6003
8
S 45)A)
S -
76
InstaI Dona Goy 8 Anchors -'(EA)
EA
S 120 CO
8
-
S 99101)
S -
77
Pee Transfer/ Mare Rea.y(5traght Tteosgh)->((A)
EA
S 4500
2
-
5 9503
S •
78
Pee Transfer/ Male Re ads (Oeairtad) ->((A)
EA
S 4503
3
-
S 13500
S -
79
Pee Transfer/Mate Reat/(D:ob'e Dealend)->fEA)
EA
S 550)
3
-
S 16503
S -
EA
-
-
S -
S .
81
-
S -
S .
82
-
S -
S .
83
-
-
S -
S -
84
-
-
S -
S -
65
S -
S .
E6
-
S
S .
87
-
S
S -
E3
-
-
S
S -
63
-
S -
S -
SPLICING
127
instal NENSp' ceCase & Prep Cave->(E4)
EA
S 20003
220
155
S 444))W
S 3Lp))CO
128
Re -eater so' ce closure ->(EA)
EA
S 1&0 W
-
-
S -
S -
123
6reo41 Sp'ce Case •Na:er''s->IEA3
EA
S 1503
-
S -
5 -
13)
Sp' oat, lust t•1 S'rg'e F.ter->(2A)
EA
S 25W
33.511
42.523
S 537,775 CO
5 1,C4320302
131
so' 0-ijfus on,S-gef ter P.gtal at panel -'(EA)
EA
S 25.03
-
45.744
S -
S 1,143.603C')
132
SF'd-.g Vass Fos on. 12 F.ter P. Gten-s(R 33O41
P.3>.AV
f 13500
-
-
S -
S -
133
Testrg OTDk Ur:-0rect+ona. Pont/ Meter Test•-g-'(EA)
EA
S 1.03
4,416
42.528
S 44160)
S 42.523W
134
Tesl•rtg, OTDR. B.-0 reasons'. Power Meter Test'g--ILEA)
EA
S 125
1,152
3216
S 144)0)
5 4,02005
135
Test ng(.•st 'geat 'es B:-D rcctional->(EAJ
EA
S
125
•
S
•
S
-
136
DMlner,t (.•st^g sr d^g->(EA)
EA
S
020
•
•
S
S
•
137
Reel test ^g-'(EA)
EA
S
375
•
-
S
-
S
•
133
Prepcaba in F EO for NAP ->(EA)
EA
S
500)
•
•
S
•
S
•
139
S
-
S
•
14')
-
-
S
•
S
141
-
S
S
•
142
-
-
S
•
S
143
-
S
-
S
144
-
-
S
-
S
-
PATCN PANELSIWD awns
145
Instal Ufdc•.r Ponered Cab'net• S to rep ani Concrete Pai->(EA)
EA
S 2820 E0
•
-
S
S
-
145
Instal Pal rn:vtcd FOH Sp' tter Cat rat• Ste prep a-4 Prefab vw't ->(EA)
EA
S 3,70000
•
134
S
S
435.8330
147
Vital Pe'e rna.n:ed FOH Sp' «cr Cab nil ->(EA]
EA
S 750 03
•
•
S
•
S
'
143
Instal rack rrol.n:ed patch pa -.el (Any S'le) and ta's ->[EA)
EA
S 11503
143
•
S
21,62003
S
'
149
Install'73I Mc -4 F ter Endcs'_re ->(EAJ
EA
S 75003
1£3
•
S
141.CCO CO
S
•
150
Instal 7h Pack for parch panels ->(EAJ
EA
S 403.00
2
-
S
£;AC')
S
-
151
S
•
S
-
152
S
-
S
•
153
S
-
S
•
154
S
-
Si
-
155
-
-
S
-
S
•
156
-
-
S
-
S
-
157
-
-
S
-
S
•
159
S
•
S
•
159
S
-
S
•
1E0
S
.
.. _:�.
S•
.;.1( ••.IL`='... e-'.I is1.'
.: :ion
...
GEPNFRWL
161
rul f tin t:cashti_'d rg->(FT]
FT
S 2.15
3640)
-
S
79,120 CO
S
'
162
Instal 2' E'cct;c Metal Tub rg (E MT) -VS]
14
S 732
1,84)
•
S
I3,46380
S
•
163
4' Cote Be:e->[EA]
EA
S 22503
353
•
S
82.£))CO
S
•
164
2'&-'id 'g R.ser Ivth 1.8- Up to 10'->[EA]
EA
S 11200
34-3
-
S
41,2160
S
-
165
Instal Ne.'na Enclos',re ->(EA)
EA
S 55 O)
353
-
S
20.2400)
S
-
166
-
-
S
-
S
-
167
•
-
S
•
S
-
1E3
S
•
S
•
169
•
-
S
•
S
-
170
•
.
S
•
S
-
171
-
•
S
-
S
-
172
-
_
S
S
.
173
-
S
-
S
-
174
-
-
S
-
S
-
175
-
-
S
-
S
-
MATERIALS
176
2CTF.ter Cabe->IFTJ
FT
S 0.19
-
•
S
-
S
•
177
12 CT F.ter Cate • American Maie • Loose Tt.te al d C'tct;c ->(ET]
FT
S 033
-
131187
S
-
S
45,931.71
178
24 CT F.ter Cat'e • Atencan Male • loose Tute a'1 d t'ectr,c ->(FTJ
FT
S 04)
192.315
71.133
S
76.92600
S
28.45320
179
49 CT F.ter Cate -American Made • loose Tt.te al d electric ->(f l]
FT
S 044
-
19.035
S
-
S
9.136.£)
16)
55 CT F.t('Ca`_'e-Arer.can Made - Loose Tate al d e'ectrc->(F I]
FT
S 081
97543
•
S
79.CC983
S
-
181
144 CT F.ter Cabe-ATar:can Male- loose Tute al d e'ectnc->(FT)
FT
S 1.16
20377
214,415
S
23.63732
S
243,721.40
182
216 CTF.ttr Cate • A -TA Te.an Made- Loose Tate al d electric ->(FT)
FT
S 1.95
S
•
S
-
183
2E3 CT F.ter Cabe-ATarica-1 Veit - Loose Tote al dt'ectric->(FT)
FT
S 200
2788.33
127,250
S
557,76603
S
254.500.00
184
12 CT M v0 F.ter Cate • Con.nscope: SIC.Yj 5i3/D3 • B-012-tN-F-M128'JIC0 ->(FT)
FT
S 0.49
S
•
$
•
165
24 CT V v0 F.t.& Cat it • Conrscope: 81 O.(ei3.'D3. 8-0241.144F-M1280140 ->(FT)
FT
S 0.57
S
•
S
•
166
49 CT M cro F.ter Cate• Cormnsco;e:810j50t7D3.804S-tN-F-F123.014O->(FT]
FT
S 093
S
•
S
-
187
55CT M cr0 f.ter Cate• Corn'nscope: 81 O))i O3/D3-B-6064.K-EF-L11la4140 ->(IT)
FT
S 132
S
S
•
1E3
144 CT M cro F.ter Cab'e•Cc•'nrdce;e:8100003):1D3-B-144-tN,£F-N12Bt/14D->(FTJ
FT
S 2.06
S
•
S
-
1b3
2E3 CT I: cro F.ter Cabe • Cc• .nscope: 81O)9127/03 • B-2E3-t74-£F-V24%S717T 20 -IfTJ
FT
S 2.15
S
-
S
-
19)
432 CT F.ter Cate-ATarica, Male- loose Tute->(FT)
FT
S 2.70
-
•
S
-
S
-
191
E54 CTF.ter Cafe -Aver;can Made •Lcose Tute->(PT)
FT
S 540
-
•
S
-
S
-
192
Drop F.ter Cate ->(FT]
FT
S 0.12
-
-
S
-
S
•
193
•
-
S
•
S
-
194
-
-
$
S
-
155
-
-
S
-
S
•
Rt•1
11.'1-1.1U 'I IUTFI
S
i1/13 0".
UNOERGPX/Uh9
156
1'HDFE PSI Cc-4..t, Orange -SDR 11->(FT)
FT
S 039
264576
2,655.1f1
S 51773E3
S 71).589.40
197
125' HD;E Rol C0- •_ t. Orange - SOR 11 ->(FT)
FT
S 0.0
1.412469
501
S EEO.335.12
S 24343
153
2' HOFE Pc'I Cor:•.•t. Orange -5DR 11 ->IfT)
FT
S 1A0
53,845
267.323
S 59.845.01
S 2673210)
15)
4'HD7.EPoi Conlut, Orange -5DR 11 -WTI
FT
S 1.18
-
-
S •
S -
200
Vcrodcct ->(FT)
FT
S 028
-
S •
S -
201
2' PVC Sched.'e 42 eel End ->(F1)
FT
S 2 21
-
S •
S -
202
Mc'e Ta;e->(FT]
FT
S 004
1,733,£16
376.707
S 69,54584
S 1504323
203
*12 AWG Sold Win Inv -sated Tracer lV re->(FTJ
FT
S 011
518.9E3
2,055.454
S 57033E-3
S 226.101.04
204
5/4 36' Copper Cllai G cani Poi ->(EA)
EA
S 1624
276
403)
S 4.43224
S 16.87336
205
Drop Vr.t 12' x 12' ->IEAJ
EA
S 27634
-
-
S •
S -
2C6
Sntal Vac. I, 17' x 3 r - t:EWMSS • FCA173324T-C•XC6 (Or eyt, Ya a nt) ->(EA]
EA
S 403.05
44
16
S 17,554 20
S 6.528 EO
207
S al Vacit. 13' x 24'-Conposte• HU3?ELL• DTI 3241EHDHD OUV(Or ecd va'cra)->(EA]
EA
S 339.52
S -
S •
203
VMft.24'xIS* - NEW3ASS- FCA243624T-0000 (Or tys. va'ent)->(EA)
EA
S 69976
1403
3,353
S 701,85923
S 2,37O7E6E-3
203
tale Vr^Y37 x 45--P.FW3AS'S- FCA334924TLO006 (Or ey'. :a't4)-4EA)
EA
S 104477
;37
14
S 143.4)7.49
S 1465473
210
[Ora ta•ge Vail( 45'xEa' (Sp'tUd)- hE1VM95•FCA364035TN2OFc2VD1:1: C0023 (Or (yu•A'e.nt)->(EA)
EA
S 227043
55
122
S 12447365
S 276.932.46
211
4'xa'x4'Precast 'sp't'Manhole wth Fearer. Ca.er, a^ri Prs-g ->(EAJ
FA
S 8379.74
•
S •
S -
212
2' ENT Cold*, t->(GTJ
FT
S 53)
S •
S -
213
2' EMT LB ->(FA)
EA
S 2527
-
5 •
S -
214
Flea atef.l->(CYJ
CY
S 24720
S •
S
215
I'n;oned Granular Bacbf I ->(TNJ
TN
S 135.96
-
S -
S -
216
3 5' O a PVC P.cieni Mar: er Posts wth Orange Dane Top. 8 fL in length ->(EA)
FA
S 1633
676
4181
S 11,0330
S 101935.73
217
35' D a FVC Round Locate Posts wth Orange 'Top Hat', 8 ftin length wth s'e.t.g straps ->(EA]
EA
S 31.55
234
7.057
S 7,39270
S 6521385
218
PF1D 8a"Wong Ma'kea->((A)
EA
S 33.11
-
-
S •
S -
219
RFD Rope -5(F-11
FT
S 2.73
-
-
S -
S -
220
6' 5DR 11 ->IfT)
FT
S 891
100
•
S 831.0)
S -
221
8' SOR 11->(FT1
FT
S 12.72
2.632
1,034
S 3347304
S 13,15248
222
6' Steel CAS rg->(FT)
FT
S 60.10
I00
-
S 6,0100)
S •
223
6'Steel Casrg->(F1J
FT
S 85.76
200
•
S 17,1S200
S -
224
Ped • b' • Cnar'.es Ini • B0O3)4 EGT ->(EAJ
EA
S 134 70
-
S -
S -
225
Pei • 10' • Chiles lnd • BDO3)S fGT -,(EA]
EA
S 18531
-
-
S -
S -
226
EA
-
-
S -
S -
227
EA
-
-
S -
S -
228
EA
-
-
S
S •
'.\:!kGQb •.:i :'Aifk It Ita1A
;) : • ,
•
0,O54311.1
229
FOSC 4508 Closure -Cc.tr.scc-;e: FOSC450-85E-24-1-&W->(IA)
EA
S 28202
-
S •
1 -
233
Sp' ce Tray tor BGcl Closure (5M12)•Connscope: FOSC•ACC-B-TP.AY-24-4iT->(EA)
EA
S 1731
•
S •
S -
231
S'xk Basset for BG41 Closure • Comrsco;e: FOSC-ACC-B BAS• ET -TAIL ->[EAJ
EA
S 4073
-
S -
S -
232
FOSC 450( Closure ->(EA)
EA
S 30546
-
S -
S -
233
Sp' ce Tray for C-Gel Closure (51112) ->IEAJ
EA
S 19.12
•
-
S -
S •
234
Sock Basket for CLtl Closure->(EAJ
EA
S 3735
S •
S -
235
FOSC 450 D Closure• Ccmnsccpe: F0SC451135-6-72-I-D)1->(EA)
EA
1 33606
220
155
S 73.93320
S 52,C693)
236
D Sze sp' ce Tray- Cc- ensce;e: FOSC-ACC•D-TRAY•72-KIT -,(EA)
EA
1 25 91
220
155
S 5.7CO20
S 4,01645
237
S'3ck Basket for DGtl Closure • Comnscope: FOSC-ACC-D-BAS•ET-TAIL ->(EA)
EA
1 22.13
61
45
S 1,34).93
S 59565
23S
FOSC EC•) D Closure ->(EA)
EA
S 51022
-
•
S •
S '
233
EC•) D Y.e sp' ce Tray ->[EA]
EA
S 2243
-
-
S -
S •
240
S'a:k Basket for 600 DGtl Closure ->[EA]
EA
S 4445
-
S -
S •
241
FLP COYOTE HD Doze Closure (Loose tube 576E6-4 sp' cts)->(EA)
EA
S 531.16
S
S -
242
Coninsccre CSCIO)Vcro Clesare•CSC 1C•)-CSC34FSAIA1 B.4000->[EA)
EA
S 23S74
-
S -
S -
243
Cannscope CSC150 Vao Closure -(SC1S0- CSC 5C5A1A1B4C'))• can µ-de as aierrsate: OF DC -BEG •OFOC-85G-.\r0)6:1-::-72
EA
S 246 CO
•
S •
S -
244
Conescc- a CSC2C•) V cro Closure ->(EAJ
FA
S 246 CO
-
S
S •
245
-
-
S •
S -
246
-
-
S
S
247
-
S •
S •
243
•
-
S -
S -
249
-
S -
S -
25')
-
S -
1•
rl',..-I'.•:?Ils •I Tut::
. :35f
S!'. ..
PATOI PANELS AND CABMBT11
270
O.:&c.c Pane r(i Cat -net ->(EA)
EA
S 113562S
S
-
S
-
271
144F Pai mounted FDH Sp' :ter Cab net -,(EA)
EA
S 5372 46
S
-
S
-
272
2E2F Pad rnc4n:ea FDH Sp :ter Cab ntt - CLEARS.El0 - R-D32-26S-C16-020-8103F, V7Bt2P -,(EA)
EA
S 5.69129
-
129
S
-
S
73242541
273
432F Pad mounted FDH Sp' tier Cab net • CLEARF.ELD-R-FB2-432-C1E-03)>B 100F, V73,(2P->(EA)
EA
S 854932
-
5
S
•
S
42,74M0
274
145F Pc'e mounted FDH Sp' itcr Cab -et ->(EA)
EA
5 4.7E2.47
-
•
S
•
S
-
275
222F Pole mounted FDH Sp' Mr Cab xt -ILA)
EA
S 5.071.70
S
•
S
-
276
432E Nose ,rca'ced FDH Sp' ttcr Cab net ->[FA)
EA
S 7.854.12
•
-
S
•
S
-
277
tx32 Si tter - CLEAR; .ILO -KCt{M->(EA)
EA
S E6544
-
S
S
-
278
1>E4 Sp'tter- CLEAPS.E LO- liCOCAA->[EAJ
EA
S 2.126.03
2E9
S
-
S
559.7ES0)
279
12 port rack moan pail ->(EA)
EA
S 2262)
-
-
S
-
S
-
2E0
24 port rack mount pawl- CLEARF:ELD- GA3-024-CIF-822->IEA)
EA
S 35334
183
-
S
73.155-92
S
-
231
4S pert rack mount panel ->(EA)
EA
5 442.55
-
-
S
-
5
-
282
95 port rack mount panel->lFA]
EA
S 75100
-
•
S
-
S
-
233
144 port rack rr:.-4 panel ->(EA)
EA
S 1,656.05
-
•
S
-
S
-
284
263 port rack rmxnt pind-CLEARF:ELD • G-HB3-26 3-C1 F-822->JEA)
EA
S 4,78721
4
•
S
19.149E4
S
-
265
Vla I 'fount F.ter Enclosure • CLEARF.EL0 • WP•X ,.B2.24•SCA-8 ->(EAJ
EA
S 11124
183
•
S
20.913.12
S
-
2E6
7ft Pack for patch panes •CLFA5t:ELD•WA-Al AE.EVA-L12-SU3.0i31C4.(2)FVA-EZA->[EAJ
EA
S 92)34
2
-
S
1,65S ES
S
-
287
AEVA Enclosure • H0FFVAN • CSD2424125S. CP2424->(EA]
FA
5 51352
3E9
•
S
1E$97536
S
-
2E3
•
-
S
-
S
-
2E3
S
-
S
-
2-r)
-
-
S
S
-
291
-
S
-
S
-
2)2
-
•
S
-
S
-
233
S
•
S
-
294
-
S
•
S
.
2)5
-
S
•
S
.
2)6
-
•
S
•
S
-
2)7
S
•
S
.
.
:.I, ...
•'.Ili ",_)IP
\t 11 `.•41I
't lnla
_.. ..:,)
•
1.,::t1,.1
2;3
Snon S4:es- 22' So7er Shen ->(EA)
EA
S 192.73
8
•
S
1,54124
S
-
233
UGoa•d-3'Ulu a•d in "CET sect:ens->(POIEJ
POLE
5 10423
8
•
S
831E4
S
-
33)
Anchors ->(EA)
EA
S 2865
8
•
S
233EA
S
-
3)1
GryVa'ker•Ye"onp'asttco.er for V.sb•ty ofdenn guy ->(EA)
EA
S 364
8
•
S
2923
S
-
3)2
Neer 35•47 vice-itn po'e for (ter atuchnents->[EA]
EA
S 59225
2
-
S
1,18450
S
•
3)3
-
-
S
-
S
•
334
-
S
-
S
•
335
-
S
5
.
3)6
-
S
-
S
'
3)7
-
S
S
.
333
5
S
30
-
S
•
S
•
310
-
S
S
?1F '1 .. ill.'>1 TOW
.. ,..
AWL •STRA DAAS)L
-
311
Po'sA_tachtent Hvdna-e(Not needed 4tnek.-ied in the labor once) ->[POLE]
FOLE
S 197.76
10
-
S
1,977.60
S
-
312
Lash'-s W re (Foot needed d i,Cu Jed in the labor price) ->(FT)
FT
S 005
4.0))
S
2400)
S
•
313
EN Strand -sill]
FT
S 1.13
400
S
4.5200)
S
314
S
•
S
.
315
S
-
S
.
316
•
-
f
S
-
317
S
-
S
-
318
-
S
-
S
.
319
-
S
-
S
.
320
-
S
-
S
-
321
1
•
S
-
322
-
1
S
-
323
-
-
1
-
S
•!, •I
>TS • •.`
t4,*-4 VAIU =t writ
Base Bid Total
Alternate A: (1)1" installed at 42" HDD and Pedestals
Unta LABOR
n
•
Division 2 BB Base Bid Division 1 FTTH Base Bid
S 14443942.14 S 21,244.96393
FTTH Cost
'
UNDUIGNOUNO LABOR
17
Drcct cnal Bore (1) 1',(0) 2', (0) 1.25- ->[LF)
LF
S 11.55
1,5559)1
S •
S 18.6C5.042.45
26
V ss'e Bore (1) 1- cOndut 33' deep -sill)
LF
S 11.55
S •
S -
46
;Mt 'a:on. Untie rvco•.iF.ter Cab'e - InckJ rig S'ack (Rep.'s" Loose Tutt F.ttr)-->ILFI
LF
S 125
2,765202
S •
S 3.455.502-9)
47
Irsta'abc•k Unfcrgrcund F.ter Cab'e-Ir.ct4 ng S'ack (V cro f ter m.st to b'enn in)->[LF)
LF
S 125
S •
S -
49
tnsta'at.on, Peeista!->(EAl
EA
S 650)
12,336
S -
S 833.843.0)
51
insta'a ten. 5•til Vas. I, 13' x 24' (Cc•T,,os te)->(EA)
EA
S 15000
S -
S -
127
Install Nen Spce Case & Prep Cabe -'(EA)
EA
S 140 CO
3322
S •
S 66-3,4)) CO
133
Prep cable in PED for NAP --,(EA)
EA
S 50 CO
12336
S •
S 6166000
Matenal
flea
177
12 CT F.ter Ca_'e- American Male• Loose Tote al d c'earic->(FT)
FT
S 033
713.097
S •
S 235,318 71
178
24 CT 'bet Cable • Arerican Maie • Lease Tute al d t'ectoc ->(FT)
FT
S 0.40
625.044
S •
S 250.017.60
179
49 CT F.ter Cave • American PJaie • Loose Tt.te a'1 d electric -'(FT)
FT
S 0 48
470,545
S •
S 225.E51.60
1E0
95 CT f,t<r Cate • American Mai - Loose Tote a'I d Ctctr,c -it'll
FT
S 081
321.794
S -
S 20.653.14
181
144 CT F.ter Ca_'e • American Male Loose Tube d
FT
S 1.16
453353
S -
S 567.64).49
• a'i e'taU,c -'-(FT)
182
2160 Fiber Cable •American Male• Loose Tote al d t'tctric ->(FT)
FT
5 195
S •
S •
183
213 CI C.ter Cate-Ame(can Male• loose Tute a'Id (tar le -'(FT)
FT
S 240
145)79
S •
S 2)0,7S1A)
184
12 CT M cro F.ter Cat. le • CorrrsscoFe: 8100597JD3 • B0121f4-F-M122✓714D ->(F T)
FT
S 0.49
S •
S -
165
24 CT li cro F.ter Cable -Ccr.nscopt:8lf•...oas9/D3• 8024 Lt43F-3.1128014D->(FT)
FT
S 057
S •
S -
1E6
43 CT Pt cro F.ter Cable -Cornscope:81C•0930IID3. (34441U-EF-F123al4D->(FT)
FT
S 090
S -
S -
187
55 CT M cro F.ter Cab'e- Connscope: 81CO)99)3/133 - B-.0 5-tN-UAM123'114D->(FT)
FT
S 132
S -
S -
1E3
144 CT M cro F.tuCat•4• Comnsco{t:810099)4/D3-B-14iU:4F-U128'JI4O->(f1]
FT
S 206
S
S -
16)
223 CT M cro F.ttr Cable •(cni.SCP;a:81009727103-B-2E3lN-EF-M2i$!17T 20 -IFT)
FT
S 2.15
S •
S •
UNDERGROUND
207
5mal Va•_'t13*x24'•Co'ntaste• t1U33E11. 0113241EHDHD CON (0: ice- :went)->(EAJ
EA
S 403.05
S -
S •
224
Ped-6'- Charles Ini • BD03}4EGT->IEA)
EA
$ 13470
11.755
S -
S I,59S,7E650
225
Pei• 10'• (ha?(s Ini• 6D0305 EGT--'(EA)
EA
S 18531
552
S •
S 102191.12
CLOSURES
229
FOSC 450E Closure •C4mr6Cc<: FOSC404E-624-1.80V->(EAJ
EA
S 282.02
S •
S '
230
Sp ce Irayfor B Gel Oostre (SM12)- Ccm-Int.t: FOSC-ACC-B-TPAY-24-14->(EA]
EA
S 1731
S -
S -
231
Sack Bin tt for BGel Clos•.re • Comnscepe: FOSC-ACC-B-64S•ET-TALL -,(EA)
EA
S 4)73
S -
S -
235
FOSC 450 D FOSC450-D66-72 1-07/->(EA)
EA
5 335 C6
3.178
S •
S 1.057,593ES
Closure - Cannsco;e:
235
0 S2e sp' ce Tray- Cc•rnscc-;e: FOSC-ACC-D-TPAY-72a3T->((A)
EA
S 25.91
3.178
S -
S 82.341.53
237
Sack Basket for DGeI Closure • Connmstc;e: FOSC-ACC-D BAS•ET•TALL ->(EA)
EA
S 22.13
E0)
5 •
S 17,704 0)
242
Comm SCC;e CSC10) M cro(lon'e- CSC10) • CSC3USAIA1 WOO ->[EA)
EA
S 23374
S •
S -
243
Cc•rcnscc•Fe C5CISOM cro Closure-05(150-CSCSCSA1A16J1.'i>.cal quote as aternate: OFDC-BEG•OF DC-BEG-414/0}3.)e-t;.72
EA
S 245 CO
S •
S •
Option A Bid
Alternate B: (1)1" installed at 30" Missile and Pedestals
Unto LABOR
Ur, t (ost
U-•t Cost
B3 tints
Fl7H V.nts
88 Option A
S
FTTH Option A
S 28.871,973.76
B3 Cost
FTTH Cost
UNDERGROUND TABOR
17
Drcct.cnal Bore (1) 1', (0) 2',(0) 125' -Ili)
lF
S 11.95
S -
S -
26
M4s'e Bore (1) 1' con% t 3)-deep->(LFJ
LF
S 11.95
1556931
S -
S 18,05.042.45
46
insta"aton, Unitrgreoni F,ter Cable• Inc 4 ng S'ack (Rego'a• Loose Tute F.ter)->[LF)
LF
S 125
2.765202
5 -
S 3,458.50250
47
Installation. UnitegrCi.4 F.ter Cable • Incloi '18 Slack (V cro !tee most be t'^An ri) -ILFJ
LF
S 125
5 •
S -
49
Insta'aton, Pedestal ->(EA)
EA
S ES0)
12336
S •
S 813.849 CO
51
ilsta•'aton, Smal Vat. 13' x 24'(Cor{os te) -ILA)
EA
S 1500)
S -
S
SPuoF.'G
127
Instal Nett Sc' ce Case & Prep Cate ->[EA]
EA
S 20) CO
3.322
S -
S 6E4.40)0)
133
Prep table in PED for/CAP->(EA)
EA
S 5000
12336
S -
S 616.E030)
M3ttri3'
F43ER
177
12 CT F,tut Cab'e•Ar,nCan Marie • Loose Tute a'I d t'ectr,C->[FT]
FT
S 033
713,C37
S
S 235,31571
178
24 CT F,ter Cable -An er.can &tale • Loose Tote al 6 ('earn ->(FTJ
FT
S 0.40
625.044
S -
S 250.017.60
179
49 CT F.tee Cable -Ayer:can &tale • Lddse Tute al d e'ectr.c ->[FT]
FT
S 0 49
470,545
S -
S 225 41.0)
1E0
95 CT F.ter Cable -Ayer:can &Fait• Loose TLte a'1 dc'cctnc->VT)
FT
S 0.81
321,794
S -
S 260,653.14
181
144 CT F.ter Cabe- Amental Male- Loose Tute a'1 d e'tctr.e->(FT)
FT
S 1.16
459353
S •
S 567.E49.43
182
216 CT F.ter Cable -Arencan Male- loose Tute al d e'ectrc->(FT1
FT
S 1.95
S -
S -
183
2E3 CT F.ter Case • ',metrical Male • Loose Tute a'1 d electric -IV T]
FT
S 2 CO
145379
S -
S 290.759 00
184
FT
S 0.4)
S -
S -
12 CT M ao titer Cable •Conrscope:810»>vJD3. 80124N-EF-M178V14D->[FT►
165
24 CT Mao F.ter Cable- Conrscope:81Wr,ay3/03- B-024-tf4-5F-M126'/I4)->(FT)
FT
S 057
S -
S •
1E6
49 CT M cro F.ter Cable •Cc•mmsco;e:8t0:0-9)1/D3- B-049-LU$F-F113'1140->[FT)
FT
S 090
S •
S •
187
56 CTMcfo F.ter Cable -Connsco;e:810099)3tD3-B4iSLN-EF-M128014D->(FT)
FT
S 132
S -
5 •
1E9
144 CT h• cro Fiter Cat 'e- Cormsco;e:SIC},'r)47D3• B-144-1tt-EF-%41230140 ->ffT)
FT
S 2.06
S •
S -
169
2i3 CT Mao F.ter Cat 'e-Ccrenscope:8103i9727/D3•B-2691N-c.Fv24'Yr17F 20->(FT)
FT
S 2.15
S -
S -
EMOERGROUND
207
Snal Vatic, 13'x24'-Ccmtaste- HU33EtL•DT13241E?<OHD•av/(Or cGo vale n1-'(1A)
EA
S 403 C3
S -
S -
224
Pei-6'- Chrles Ili- BO03)4-EGT->(EA)
EA
S 13470
11,755
S -
S 1,5E33E650
225
Pei - 10' - Char:es hi- BD030SEGT->[EA)
EA
S 1E531
552
S -
S 102291.12
CLOSURES
223
FOSC 450 BClosure •Comnscc;e: F05C45') B54-24.1-B7/->(EA)
EA
S 12202
S •
S -
230
Sp' ce Tray for BGel(sosyre (SM12)• Connscope:f0SC-ACC-13-TRAY•24-Q1->(EA]
EA
S 17.31
S •
S -
231
5'xk Basket for Et -Gel Closure •Conoco;t: FOSC•ACC•BBAS•ET•TALL->(EA)
EA
S 40.73
S -
S -
235
FOSC 450 D Closure - Connsce;e: FO5C450O56-72•1•D7/->[EA)
EA
S 33506
3.178
S -
S 11.67,953.63
236
D S•2e sp'ce Tray- Connsccye: FOSC-ACC-O-TPAY•72 fl->(EA)
EA
S 25.91
3.178
S -
S 82,341.53
237
S'akBasket for Cs -Gel Closure - Cornsccye: FOSC-ACC-O-BAS•ET•TAlL->(EA)
EA
S 22.13
CO
S -
S 12704 0
242
Cornsccpe C5C10)11oo Closure- CSC10)-CSC3-USAIA1 BACC'3->(EA)
EA
S 23374
S -
S -
243
Cornscopt C5C150Pi ao Closure •CSC150•CSCS-CSA1A1B4?)). cal quote as a'terna:e: OFDC-BEG-OFOC•B?G-:`:'GS`444-N-72
EA
S 246.0)
S •
S -
Option B Bid
Alternate C: (1)1" installed at 42" HDD and Vaults
88 Option 8
$
FTTH Option 8
S 28.871.973.76
Ur.t•
LABOR
Un t Cost
Unt Cost
83 Vo Cs
FTTH Un t4
03 Cost
FTTH C
UNDERGROONO LABOR
17
D-recVtwl Bore) 1t(0)2', CO) 125' -VI)
LF
S 11.95
1,596.991
S
S 18.606.042.45
26
ht.ss'el9:re( I) 1' coniut 30' deep->(tij
LF
S 11.95
S •
S •
46
Insta"a:on, Unlergrooni F.ter Cable -Inoti-,g5'ack(Regular loose Tute F.ter)->(LFJ
lF
S 125
S -
S -
47
Irsta'3i;n, Unit egret ni F.ter Cable •Indod rig 5'xt (V crof ter most to t'ann In).->(LF)
LF
S 1.25
3.346433
S
S 4,183.10375
49
Insta"anon, Pcc''csta'->(EA)
EA
S 6900
S •
S •
51
Irig a'3t-on, Smal Vault, 13' x 24'(Cc r; ste)->(EA3
EA
$ 150.00
12325
S -
S 1,849,750.CO
SPLICING
127
Install Nen Sp' ce Case & Prep Cate -->((A)
EA
S 20000
15.526
S -
S 3.105.2030)
133
Prepub'e in FED for NAP ->(EA)
EA
S 5000
-
S -
S •
Maken3'
BEER
177
12 CT F.ter Cat'e- Arer:can PJaie • loose Tote al d e'ectr.c->(FT)
FT
5 033
S -
S •
178
24 CT F.terCat'.- Ate roil Male • loose Tube a'1 d electric->(FTJ
FT
5 0.40
S -
S
179
49 CT F.ter Cabe - Artr.can Male- Loose Tute al d€ectric->(FT]
FT
S 0.49
S
S •
1E0
95 CT F.ter Cab'e-Arerica, Male • Loose Tube al d electric -In)
FT
S 081
S -
S •
181
144 CT F.ter Cate -American Male • loose Tube al d f ectr,c •->(F1)
FT
S 1.16
S •
S -
182
216 CT F.ter Cate-Ar,irica, Male • loose Tote al d electric a(FT)
FT
S 1.95
S -
S -
183
2E-3 CT F.ter Cabe -American Ma_'e- Loose Tube all d electric ->(FT)
FT
S 200
S -
S
18A
12 CT le cro F.ter Cable •Cemrscope:810.v>a7VD3 • B-012-11(63-M12B'114D -'(FT)
FT
S 0.49
849.535
S -
S 415.762.64
165
24 CT f.' ao liter Cate • Comnscope: 81C'Cifl9iD3 • B-024-04-EF-5.1123014D->(FT)
FT
S 057
762354
S -
S 434.541.78
1E6
49 CTh'c,oliter Cable -Cornscope: 810099)1/D3. 6049 117<F-F12301CD -'(FT)
FT
S 090
611,118
S -
S 50.06.20
187
%CTPea°F.ter Cable •Ccr.ascope:8100:99)3403- B-095-133-EF-M128'J140 -'(FT)
FT
S 132
331,927
S •
S 504.143E4
1E9
144 CT FJ cro F.ter Cab'e- CGnnsc0;e: 810))))4.0D3-B-144 tN-EF-M128014D->(FTJ
FT
S 2.DS
572.076
S -
S 1,178.47656
IS)
2E3 CT!'<toF.ter Cat 'e-Cc.rT.sce;e:610003727/D3-B-2E317:- Ef!'24SS/17T 20)->(FTJ
Ft
S 2.15
173.472
1 -
S 3E5.514 p)
207
Sms'I Vau's.13'x24'• Composte- HU33ELL- DT 13241 EHOHDCLW (Or eau va'c-4)->(EAJ
EA
S 40805
12325
1 •
S 5.02321625
224
Pei -8'-Chaves In!-B00304-EGT->(FAJ
EA
5 134.70
-
1 •
S -
225
Ped-10'- Cnv'es I i- BD03c5 EGT->(EAJ
EA
5 18531
-
S -
S -
aGSu9.ES
223
fOSC 450 B Closure -Corens<o;4: fOS(450846-24.1.87/->(EA)
EA
S 282.02
3.17e,
$ -
S 6;6.25936
230
Sp'ce Tray forBGel Closure (SM12)•Comms<ope: fOSC•ACC•B-TPAY•24-KR->(EA)
EA
5 1731
3.I73
5 -
S 55.011.18
231
Stack Basket for 8-Gel Closure • Cornmscope: FOSC.ACC•B-BIStET•TALL -a(FA)
EA
S 4373
E i)
5 -
5 32.5!4 W
235
FOSC 450 DClosure • Commscope FOiC45006.6-72.1.00J-a(EA)
EA
S 33606
S -
S -
236
0 Sze sptce Tray • Commscopr. fOSC ACC•D•TRAY•7240T ->(EA)
EA
S 25.91
5
S -
237
Sack Basket for DGd Closute • Commscope FOSC-ACC•D-BAS'tfT-TALI -alEAJ
FA
S 2213
S -
S
242
Commscope CSC100 Mao Closure • CSC100- CSC3-USAMA1BM00 -'fEAJ
FA
S 23474
10 r.)3
5 -
5 23F&11622
243
Cammscgx CSC150 Mao Closure -CX1SO-CSCS-CSAIAIBMOO, can quote as aterna:e: OFDC-BEG-OFOC-BEGd.\.'004Y44-72
EA
S 24600
23:5
S
S 576,870 C•)
Option C Ilid
Alternate D: (1) 1' installed at 30" Missile and Vaults
LASOR
V' t COST
U-, t Cost
63 Un is
FTTH U'. is
88 Option C
$ •S 40.170.619.03
FTTH Option C
63 Cost
FT111 COST
UND(RGROONO LASOR
17
DrertC.-WBore (1) 1 ', (0) 2;(0)1.25' ->(UFJ
IF
S 11.55
S
-
S
-
26
Mss'e Care (1) 1' condut 3)' dap -VS)
IF
S 11.55
1,558531
S
-
S
18.606.04245
46
Insta"atern, OndtryoundFaber Cabt-/-adngStack (P.egi,ar lease Tute F.ber)->(le)
11
S 125
S
-
S
-
47
Insti at on, UndHyand Faber CaYe-1nckd ry Slack et cro f to must be Von" in) -silt)
IF
S 1.25
3.345.453
S
-
S
4183103 75
49
Insta'at CA Pea stat-s(EAJ
EA
S 63.00
S
•
S
•
51
Insta'at cl Smil Veit. 13' x 24'(Comps te)->(EA)
EA
5 151A0
12325
S
•
S
1 4875003
SPUONC -
127
Install New Spice Case& Prep Cade-s(EA)
FA
5 20060
15.526
S
•
S
3,1052i003
133
Prep cab'e in PEO for NAP-s(EA3
EA
S SO CO
-
S
•
S
•
!'3:er.31
0.-
FBER • .'-
177
12 Cr F.t4rCa='e-Arer,cai Male- tense T.te al d e'irtrc->(FT)
FT
S 633
S
-
S
-
178
24CTF.bc-r Cable -American Made- lone Tube alde'tctric-'(FT)
FT
S 0.40
S
•
S
-
179
48 CT fiber Cade-Artrcal Made • Loose Tube a'Id electric ->(FT)
FT
5 0.43
S
•
S
-
180
96 CTF.bee Cable -American Made• Loose Tube a'Id electric-s(FTJ
FT
S 061
S
S
-
181
144 CT Faber Cab'e • American Made- loose Tube alde'ectric -s(FTJ
FT
5 1.16
S
-
S
-
182
216 CT Faber Cade - American Made • Loose Tube al d e'4ctric -a(FT)
FT
5 1.95
S
•
S
-
183
233 CT Fiber Cable - American Made • Loose Tube al d t'tctr:c ->(FTJ
F T
5 260
S
-
S
-
184
12 CTMao Faber Cabe-Commuope 816709392A 3-8-0124N-55F-'.t1234/140->(Ff)
FT
5 0.49
848,534
S
-
S
415.782.64
165
24 CT Mao Faber Cade - Comrnscope: 81600939940e - B-024{H-E5-411234/140 -WI)
FT
s 057
762,354
S
-
S
436,541.78
186
43 CT Mao Faber Cabte-Commuope 810009901/OB-B-0z3iN-89412B4/14D->(FTJ
FT
s 0.93
611,11E
5
•
S
55000620
187
96CTM.aoEta Cable -Commscope:810009933dDa.a-0 6.tN-854.412ar/14D-alFT)
FT
S 132
331,927
S
S
504,14344
1 E 3
144 CT I.' cop Faber Cat'e - COrcnuope:810Y'990463 - B-144-tU-8F-M1284140 -'(FT)
FT
5 2 05
572,076
S
-
S
1,174476-56
169
2E3 CTV uo F.torCat 'e-Co-rrnue;e:81CCC?727/03-B-2e3-1I:-EF-!'24::Y17T2C')->(fT1
FT
S 2.15
170.472
S
•
S
3E5.51480
U? DEParkOUND -
207
Smil Vaot.13'x24•-Ccrn;,ste- HU33E11.- oT13241EHOHDC{W(Or etiuva'enU->(EA)
EA
5 4:.305
12.325
S
-
S
5.02321625
224
Pad -6'-Chr:es t.i • 6D0334-EGT->(EA)
EA
5 13470
-
S
•
S
-
225
Pad • 10'• Cha•:es Ind -BDO3)5-EGT->(EA)
EA
5 16531
•
S
-
S
-
aDsuREs aa_
'
223
FOSC 450 B Clowre • Ccanmscope: FOSC450-86-6-24.1-67/ ->(EAJ
FA
5 282.02
3.178
S
-
S
8%259-54
230
Sp.ce Trai for 8-Gel Closure (SM12)•Corrrscope: FOX•ACC-ElTRAY•24-Krt-s(EA)
EA
S 1731
3.178
S
-
S
S5.011.18
231
Slack Basket for B-Gel Closure - Commscope: FOSC•ACC•B-BAS'FT•TALL ->(EA)
EA
S 40.73
E i)
S
-
S
32.534 00
235
FOSC 4500 Closure- Cornmuope--FOX450-D6672.1•OW -,(EA)
EA
S 336-06
$
-
S
-
236
D Sze sp`-te Tray -Co'nrnscope FOSC-ACC-D-TPAY•72•KIT -'(EA)
EA
S 25.91
S
-
S
-
237
Slack Basltt for DGd Clowre- Commscope: FOSC•ACC-D-BAMET•TALL ->(EAJ
EA
s 22.13
S
-
S
-
242
ComrnscopeCSC100 Woo Closure - CSC' 00-CSC3435AIA18A000-'(EA)
EA
S 233_74
1O0)3
S
-
S
23E3,11622
243
COna mope CSC1 50 Mao Closure - CSCI 50 - CSC5-05A1A1 BA000. can gwte as aternate:Of DC-8SG • OFDC•B!G-t`G'OO.SN N•72
EA
S 24500
2 345
S
-
S
576,870.0)
Option D B{d
Base
Atern3te A: (1)1" insta'td at 42' HDD a -A Pedesta's
Aternate B: (1)1' installed at 30' M-sole a-4 Pc-lesta's
Aterna:e C: (1)1' installed at 42' HDD a d Waits
A`.erru:e 0:: (1)1' Ensta'e4 at 30' M-ss't a-.i Vauts
BB
MN
BB(OpNon
BB Option D
S
FTTH Option D
S 0,170.619.03
EMI don Total
S 16.443.532.14.
S 21244,963.93
NA
NA
NA
S -
S 28,871,973.76
S 16.443.932.14
S 50,116.937.69
S 46.565.919.83
S -
S 28.871,973.76
S 16.443.532.14
S 50,116,937.69
S C6.565.919.83
S -
S 40,170,61403
S 16,43.932.14
S 61,415,582-96
S 77.E64565.10
S -
S 40.170.619.03
S 16443332-14
S 61,415.532.96
S 77,EC4 565.10