June 29, 2023
City of Waterloo / Leisure Services
Attn: Travis Nichols
TRAVIS.NICHOLS @WATERLOO-IA.ORG
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
Reference: Electric distribution to serve an existing home, proposed splash pad and
amphitheater at Gates Park located near E Donald St. and Mildred Ave., Waterloo, IA.
WMIS: 3008127 — Revision I
Dear Travis:
We are pleased to submit the Refundable Advance for Construction Underground
Electric Service Extension Proposal for Speculative Use for the above project. This
proposal is valid for 90 days and if MidAmerican Energy construction has not
commenced within 12 months it may be voided.
Please sign and return the proposal as soon as you are ready to commit to the work. You
may withhold payment until 30 days before MidAmerican Energy Company is ready to
schedule the work. In the meantime, please keep me informed of your schedule. After
we have received your payment, we will sign and return a copy of the proposal for your
records.
If you have any questions, please call me at (515) 252-6701.
Sincerely,
MidAmerican Energy Company
A1N Ykk -Mow)
Amy M Adams
Customer Project Coordinator
Enclosures
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream some .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
REFUNDABLE ADVANCE FOR CONSTRUCTION
UNDERGROUND ELECTRIC DISTRIBUTION EXTENSION PROPOSAL
FOR SPECULATIVE USE — WMIS: 3008127
MidAmerican Energy Company, an Iowa corporation and the City of Waterloo
("Applicant"), agree as follows:
1. MidAmerican Energy Company will extend its electric lines underground to serve
3PHS, 120/208V to the existing home, splash pad and amphitheater near E
Donald St. and Mildred Ave., as shown on the attached drawings.
2. MidAmerican Energy Company will furnish the necessary labor and materials
required to fulfill its undertaking, as specified above, and will commence such
work as soon as reasonable and practicable after the execution of this Proposal
and receipt of Applicant's cash deposit indicated below and will prosecute such
work to completion with reasonable diligence.
3. In consideration of the receipt of a payment in the amount of $77,880.29 which is
a refundable Advance for Construction, MidAmerican Energy Company agrees to
construct necessary electric facilities as set forth above. Please submit payment
with Applicant's signed acceptance of this Proposal. If MidAmerican Energy
Company is required to work during the winter construction season, Applicant
agrees to pay an additional sum of $4.93 per trench foot as a refundable Advance
for Construction for all required trenching.
4. The Advance for Construction shall be subject to refund by MidAmerican Energy
Company to Applicant based upon the following terms and conditions:
a. Advances shall not accrue interest and shall be subject to refund from the
date of original advance payment. This will span a six -year period at the
rate of fifty percent (50%) of the annual metered electric service bill of the
above Applicant. Base revenue shall be estimated annual kilowatt hours
based on similarly situated customers, less the cost of fuel.
b. If additional customers are connected to the above described line
extension, the above Applicant shall receive refunds equal to three times
estimated base revenue for each additional new customer to the extent the
base revenue exceeds the additional distribution construction costs
incurred by MidAmerican Energy Company. Base revenue shall be
estimated annual kilowatt hours based on similarly situated customers, less
the cost of fuel.
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream some .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
c. Refunds shall be made on the anniversary date of the original advance
payment or sooner at the option of MidAmerican Energy Company.
d. Revenue for un-metered private lighting shall not be included in any
refund.
e. No refunds shall be made for revenue received after six (6) years from the
date of the original advance payment.
f. Never shall the total of refunds exceed the refundable portion of the
payment stated above.
g.
No refunds shall be made for customers served from a further extension of
the above described electric line extension.
5. Except as may hereinafter be provided, MidAmerican Energy Company shall:
a. Not tamp the backfill. Applicant agrees to indemnify and hold
MidAmerican Energy Company harmless from any and all damages that
may result from the non -tamping of backfill operations conducted by
MidAmerican Energy Company. In case any action is brought against
MidAmerican Energy Company, or any of its agents or employees,
relative to such backfill operations, the Applicant shall assume full
responsibility for the defense thereof. Upon failure to do so on proper
notice, MidAmerican Energy Company reserves the right to defend such
action and charge all costs to the Applicant provided, however, that
nothing herein shall be construed as an assumption of liability by the
Applicant for damages and claims attributable to MidAmerican Energy
Company negligence.
6. Applicant shall provide, without cost to MidAmerican Energy Company, such
easements as are necessary and incidental to such installation and use of
MidAmerican Energy's facilities on private property within the area served. If a
3rd party easement is required any cost associated in obtaining the easement will
be paid by the applicant.
7. Pursuant to MidAmerican's tariff, the Applicant is required to pay actual permit
fees. Permit fees may not be offset by Revenue Credit and are to be paid
regardless of whether the applicant is required to pay a Refundable Advance or a
Nonrefundable Contribution.
8. Applicant shall be responsible for complying with all aspects of compliance as
required by any local, state, or federal permit or plan associated with storm water
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT ream swim .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
pollution prevention or erosion control. It is specifically understood and agreed
that MidAmerican Energy Company is providing the service requested by the
Applicant solely for the Applicant. MidAmerican Energy Company will not
become or agree to become a co-permittee or operator for the purpose of
applicants' compliance with any local, state or federal permit or plan associated
with storm water pollution prevention or erosion control.
9. Applicant shall be responsible for locating and marking all privately owned
systems such as water services, culverts, irrigation systems, drainpipes, septic
lines, and underground wiring before MidAmerican Energy Company's
construction.
10. It is specifically understood and agreed that any distribution systems, or other
facilities constructed or installed by MidAmerican Energy Company under terms
of this Proposal shall remain the sole property of MidAmerican Energy Company
and MidAmerican Energy Company shall determine, as its own judgment
indicates, the manner and method of utilization thereof and to extend the same or
connect other facilities there to and serve other customers there from as it shall
see fit, subject only to such obligations as MidAmerican Energy Company shall
have assumed in this Proposal; and no other person shall have any right, title,
interest or claim, in or to the said distribution system or other facilities by virtue
of any provision of this Proposal.
11. Applicant shall furnish and install the transformer pad with moat including
specified elbows and ducts, according to the enclosed transformer pad drawings
and minimum specifications. A level graded, 10-foot minimum clearance is to be
maintained from the front of the pad to the nearest fixed structure.
12. Applicant shall furnish and install an additional secondary duct for temporary
service (if required).
13. Applicant shall ensure that all duct elbows shall be fiberglass, forty-eight inches
in radius, heavy wall, with factory assembled plastic couplings on each end to
mate with schedule 40 PVC duct.
14. Applicant shall furnish and install barrier walls around the transformer that may
be required by the governing authorities' standards to shield windows, doors, and
other building openings.
15. Applicant shall furnish and install guard post around transformer (if needed).
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT roam SIRVIC&.
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
16. Applicant shall notify MidAmerican Energy Company 48 hours before pouring
the concrete transformer pad. Please contact me at (515) 252-6701 to arrange for
an inspection.
17. Applicant shall furnish, install, own, and maintain all secondary cable between the
transformer and metering point.
18. Applicant shall install metering instrument transformers sized and furnished by
MidAmerican Energy Company, furnish and install the meter socket and test
switch for all instrument transformer services.
19. Applicant shall furnish and install an electric meter setting for each tenant,
applicable sockets, conduit, cabinets and wiring according to MidAmerican
Energy Company's standards. Please contact your local customer project
coordinator to complete the service application to initiate new meter and service
connection.
20. Applicant shall furnish, install, own and maintain all 4-inch ducts as shown on
attached prints. All ducts shall be black w/red stripe or grey in color, PVC type
schedule 40 or schedule 40 HDPE coil -able. Applicant shall install ducts a
minimum of forty-two (42) inches and a maximum of forty-eight (48) inches
below finish grade with capped and staked ends and equipped with pull wires.
MidAmerican Energy Company will provide marker balls for the duct ends.
These are available at MidAmerican Energy Company's storeroom. Applicant is
responsible for correct placement and depth of conduit. Note: No more than ten
(10) conduits allowed within the secondary compartment of the transformer
pad.
Proposed this 29th day of June, 2023
MIDAMERICAN ENERGY COMPANY
By:
Title:
APPLICANT:
By: Quentin. I-Lart
Title: Mayor of Waterloo, IA
012755
453362
000100 J0
0019389405
001006412
455693
455694
0017221435
0001006415
001806283
005949857
12714.9.
JJ�
INU •`
'I
I
I p
3352
..:: 4.8.
— -10001003181 200K
%, 1j 366700
� x
0513
90
EN ERCY COMPA
Crew HQ:WAT
30344576
108-39
_,0365
0015208078
OT
0012714998
453353
0014998024
••—•••—••• ••••—•••0001003177
0010250833
367106
���'��"" E DONALD ST
0001003173 367108 367109 �o` 367120 ID 05F05605
0001003175 0005948693 1 4BC
U 367145
KEYSTONE ST
608 610 1 612
000100 168
\ :WP((3/0 AC •m.. 0031-1
96:5548669
Rem
rim
607 609
337440
• ZEI212
arm
ing
Install 45' pole with
8' tangent crossarm.
Install cutouts and 1/0 riser.
Install #4dx from txf to light
Fuse size: 25T
Fuse label: 05F05605
619 621 623
- - 0005948670 O 107 336.4 ACSR 1 1 (3/0 ACSR 6/1)) 00010136 8 2E1212 45-3 WOODIS-
0, 0015009780 MEC
0005949840
/ ..
454199
Install 45' pole with
8' deadend crossarm
and down guys.
Install cutouts and 1/0 riser.
Fuse size: 25T
Fuse label: 05F05606
Remove crossarm and down guy
Install 8' tangent crossarm
0014134180
0014134080
18062818
E DALE°J I 25T
Add one
new span of 1/0 ACSR
R658-414
000594989
Gust: GATES PARK
NY Addr: MILDRED AVE AND DONALD ST
City: WATERLOO
X = 1956454
Remove existing poles,
primary, secondary, and lights
Install 150VA 120/208V transformer
on customer pad.
Txf label: 05T04545
Install 1/0 30 cable in 4" conduit
from transformer to pole
400'
ZEI212
•••—• ••—•1/O AL PARR
00213193 3
05T0454
A ABC PHS 150 KVA
208/120
• • zo212
PARA
Install 45' pole with 8' deadend crossarm.
Install single-phase deadend to the south.
Install down guys.
Install 1/0 primary riser.
Fuse label: 05F05613
Fuse size: 15T
Y = 923214
WMS_REV:3008127-1
Date: 3/23/2023
Scale: 1 IN = X FT
Designer: KLINE,DAVID
05T045
B PHS 25
119Wp281346
35-5 WOOD
Couple to
customer
conduit
11 S 25KVA
OD
-4 WOOD
II
00101 0 •
S 50K 240 0001013604
S 50KVA
0/240
Remove pole and txf bank
431083
0016296389
Remove pole
Install 45' pole with
8' tangent crossarm.
Install 50-50-50kVA 240V txf bank
Connect to existing 3-ph PAC
to the east
833 843
3/0 ACSR (4 ACSR )
Install 35' secondary pole
Install #4tx from txf
to city siren
Remove two existing poles
and secondaries
Install 75kVA 120/208V transformer
on customer pad.
Txf label: 05T04544
Install 1/0 30 cable in 4" conduit
from transformer to pole
220'
-4 WOOD
Install 3" secondary riser
on existing pole and connect
to existing service.
062968
Install 25kVA padmount transformer
with 4/0 UG cable to existing pole
Install 1-ph 1/0 cable
in 2" conduit.
Conduit installed by MEC/Hoffman
500'
Job Desc: NB OMM: Please provide cost/design for upgrades to Gates Park. File path: W:\Distribution Engineering\Central\Central Drawing\CustProjDrwgs - Wate
0001013602 _ 65
367123
000101359
0001013140
0 820-830
000101359
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims at liability and responsibility for all claims and damages including but not limited to, personal injury, death and property damage,
resulting from any authorized or unauthorized use of, or reliance upon, this drawing for any purpose.
loo\Gates Park (e) - 3008127