May 8, 2023
City of Waterloo
Attn: Noel Anderson
noel.anderson@waterloo-ia.org
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
Reference: Electric distribution to serve future development(s) along Warp Dr., Waterloo,
IA. WMIS: 3006919 ā City Portion Revision II
Dear Noel:
We are pleased to submit the Refundable Advance for Construction Underground
Electric Service Extension Proposal for Speculative Use for the above project. This
proposal is valid for 90 days and if MidAmerican Energy construction has not
commenced within 12 months it may be voided.
Please sign and return the proposal as soon as you are ready to commit to the work. You
may withhold payment until 30 days before MidAmerican Energy Company is ready to
schedule the work. In the meantime, please keep me informed of your schedule. After
we have received your payment, we will sign and return a copy of the proposal for your
records.
If you have any questions, please call me at (515) 252-6701.
Sincerely,
MidAmerican Energy Company
Amy M Adams
Customer Project Coordinator
Enclosures
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT roam SIRVICf.
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
REFUNDABLE ADVANCE FOR CONSTRUCTION
UNDERGROUND ELECTRIC DISTRIBUTION EXTENSION PROPOSAL
FOR SPECULATIVE USE ā WMIS: 3006919 ā City Portion Revision II
MidAmerican Energy Company, an Iowa corporation and the City of Waterloo
("Applicant"), agree as follows:
1. MidAmerican Energy Company will extend its electric lines underground to serve
3PHS, 120/208V service to future development(s) along Warp Dr., Waterloo, IA
as shown on the attached drawings.
2. MidAmerican Energy Company will furnish the necessary labor and materials
required to fulfill its undertaking, as specified above, and will commence such
work as soon as reasonable and practicable after the execution of this Proposal
and receipt of Applicant's cash deposit indicated below and will prosecute such
work to completion with reasonable diligence.
3. In consideration of the receipt of a payment in the amount of $24,374.56 which is
a refundable Advance for Construction, MidAmerican Energy Company agrees to
construct necessary electric facilities as set forth above. Please submit payment
with Applicant's signed acceptance of this Proposal. If MidAmerican Energy
Company is required to work during the winter construction season, Applicant
agrees to pay an additional sum of $4.93 per trench foot as a refundable Advance
for Construction for all required trenching.
4. The Advance for Construction to the transformer North of 108 Warp Dr.,
Waterloo, IA shall be subject to refund by MidAmerican Energy Company to
Applicant based upon the following terms and conditions:
a. Advances shall not accrue interest and shall be subject to refund from the
date of original advance payment. This will span a six -year period at the
rate of fifty percent (50%) of the annual metered electric service bill of the
above Applicant. Base revenue shall be estimated annual kilowatt hours
based on similarly situated customers, less the cost of fuel.
b. If additional customers are connected to the above described line
extension, the above Applicant shall receive refunds equal to three times
estimated base revenue for each additional new customer to the extent the
base revenue exceeds the additional distribution construction costs
incurred by MidAmerican Energy Company. Base revenue shall be
estimated annual kilowatt hours based on similarly situated customers, less
the cost of fuel.
Micamerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT roam SIRVICf.
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
c. Refunds shall be made on the anniversary date of the original advance
payment or sooner at the option of MidAmerican Energy Company.
d. Revenue for un-metered private lighting shall not be included in any
refund.
e. No refunds shall be made for revenue received after six (6) years from the
date of the original advance payment.
f. Never shall the total of refunds exceed the refundable portion of the
payment stated above.
g.
No refunds shall be made for customers served from a further extension of
the above described electric line extension.
5. This section refers to any connection made to the primary line extension.
Pursuant to MidAmerican Energy Company's electric tariff, Refundable Advances
are paid by the customer prior to construction, and may be refunded in whole or in
part based upon the following terms and conditions.
a. Refundable Advance shall be subject to refund to the Applicant for a ten-
year period from the date of the original Refundable Advance payment.
b. Refundable Advance shall not accrue interest.
c. Refunds shall be made annually on or about the anniversary date of the
original advance payment.
d. Annual refunds will be based on the number of new customers at the
identified lots that have directly connected to the electric distribution
expansion in the prior year. The amount refunded will be equal to the
estimated three-year base revenue from those customers less any additional
costs to extend service to them. Base revenue is equal to estimated annual
revenue, less fuel expenses and energy efficiency cost recovery charges,
based on revenue received from similarly situated customers. Base revenue
amounts to be applied to new customers are re -estimated each year using
the most current information available, and may adjust upward or
downward depending on the circumstances.
e. No refunds shall be made for revenue received after ten (10) years from the
date of the original advance payment.
Micamerican
ENERGY
OBSESSIVELY, RELENTLESSLY AT roam SIRVICf.
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
f. At no time shall the total of refunds exceed the original Refundable
Advance payment.
gā¢
No refunds shall be made for customers served from a further extension of
the above described electric line extension. Distribution System Expansions
without end -user attachments shall not be eligible for refunds unless the
following circumstances are met: If a Distribution System Expansion
connected during the ten year period off of an already existing Distribution
System Expansion, the Revenue Credit shall be applied to the new
Expansion first. Any Revenue Credit remaining shall be applied to the
connected existing Expansions provided that they have not received a full
reimbursements for its Refundable Advance and are within the ten year
attachment period. The Revenue Credit will continue to apply to connected
existing Expansions until the Revenue Credit is either exhausted, the ten
year attachment period has closed, or all Refundable Advances have been
reimbursed in full. Total refunds for any Expansion shall not exceed the
original Refundable Advance.
6. Except as may hereinafter be provided, MidAmerican Energy Company shall:
a. Not tamp the backfill. Applicant agrees to indemnify and hold
MidAmerican Energy Company harmless from any and all damages that
may result from the non -tamping of backfill operations conducted by
MidAmerican Energy Company. In case any action is brought against
MidAmerican Energy Company, or any of its agents or employees,
relative to such backfill operations, the Applicant shall assume full
responsibility for the defense thereof. Upon failure to do so on proper
notice, MidAmerican Energy Company reserves the right to defend such
action and charge all costs to the Applicant provided, however, that
nothing herein shall be construed as an assumption of liability by the
Applicant for damages and claims attributable to MidAmerican Energy
Company negligence.
7. Applicant shall provide, without cost to MidAmerican Energy Company, such
easements as are necessary and incidental to such installation and use of
MidAmerican Energy's facilities on private property within the area served. If a
3rd party easement is required any cost associated in obtaining the easement will
be paid by the applicant.
Micamerican
ENERGY
OBSESSIVELY, RELENTLESSLY AT roam SIRVICf.
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
8. Pursuant to MidAmerican's tariff, the Applicant is required to pay actual permit
fees. Permit fees may not be offset by Revenue Credit and are to be paid
regardless of whether the applicant is required to pay a Refundable Advance or a
Nonrefundable Contribution.
9. Applicant shall be responsible for complying with all aspects of compliance as
required by any local, state, or federal permit or plan associated with storm water
pollution prevention or erosion control. It is specifically understood and agreed
that MidAmerican Energy Company is providing the service requested by the
Applicant solely for the Applicant. MidAmerican Energy Company will not
become or agree to become a co-permittee or operator for the purpose of
applicants' compliance with any local, state or federal permit or plan associated
with storm water pollution prevention or erosion control.
10. Applicant shall be responsible for locating and marking all privately owned
systems such as water services, culverts, irrigation systems, drainpipes, septic
lines, and underground wiring before MidAmerican Energy Company's
construction.
11 It is specifically understood and agreed that any distribution systems, or other
facilities constructed or installed by MidAmerican Energy Company under terms
of this Proposal shall remain the sole property of MidAmerican Energy Company
and MidAmerican Energy Company shall determine, as its own judgment
indicates, the manner and method of utilization thereof and to extend the same or
connect other facilities there to and serve other customers there from as it shall
see fit, subject only to such obligations as MidAmerican Energy Company shall
have assumed in this Proposal; and no other person shall have any right, title,
interest or claim, in or to the said distribution system or other facilities by virtue
of any provision of this Proposal.
12. Furnish and install the transformer pad with moat including specified elbows and
ducts, according to the enclosed transformer pad drawings and minimum
specifications. A level graded, 10-foot minimum clearance is to be maintained
from the front of the pad to the nearest fixed structure.
13. Furnish and install an additional secondary duct for temporary service (if
required).
14. All duct elbows shall be fiberglass, forty-eight inches in radius, heavy wall, with
factory assembled plastic couplings on each end to mate with schedule 40 PVC
duct.
MidAmerican
ENERGY
OBSESSIVELY. RELENTLESSLY AT roam SIRVIc .
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306
15. Furnish and install barrier walls around the transformer that may be required by
the governing authorities' standards to shield windows, doors, and other building
openings.
16. Furnish and install guard post around transformer (if needed).
17. Notify MidAmerican Energy Company 48 hours before pouring the concrete
transformer pad. Please contact me at (515) 252-6701 to arrange for an inspection.
18. Furnish, install, own, and maintain all secondary cable between the transformer
and metering point.
19. Install metering instrument transformers sized and furnished by MidAmerican
Energy Company, furnish and install the meter socket and test switch for all
instrument transformer services.
20. Furnish and install an electric meter setting for each tenant, applicable sockets,
conduit, cabinets and wiring according to MidAmerican Energy Company's
standards. Please contact your local customer project coordinator to complete the
service application to initiate new meter and service connection.
21. Applicant shall furnish, install, own and maintain all 4-inch ducts as shown on
attached prints. All ducts shall be black w/red stripe or grey in color, PVC type
schedule 40 or schedule 40 HDPE coil -able. Applicant shall install ducts a
minimum of forty-two (42) inches and a maximum of forty-eight (48) inches
below finish grade with capped and staked ends and equipped with pull wires.
MidAmerican Energy Company will provide marker balls for the duct ends.
These are available at MidAmerican Energy Company's storeroom. Applicant is
responsible for correct placement and depth of conduit. Note: No more than ten
(10) conduits allowed within the secondary compartment of the transformer
pad.
MidAmerican
ENERGY
OBSESSIVELY, RELENTLESSLY AT YOUR SIAVICf.
Proposed this 9th day of May, 2023
MIDAMERICAN ENERGY COMPANY
By:
Title:
APPLICANT:
By: QuerEi/z J it
Title: Mayor of Waterloo, IA
MidAmerican Energy
Attn: Amy M Adams - DMGF
PO Box 657
Des Moines, IA 50306