HomeMy WebLinkAboutWoodruff Construction - FY23 Gates Park Improvement, Cont. No. 1076, CO #1 - 8.7.2023CHANGE ORDER NO. 1 Owner City of Waterloo Date: 7/18/2023 Project Gates Park Improvements Project Owner's Contract No. 1076 Contractor: Woodruff Construction Date of Contact Start 5/30/2023 Contract Amount: $ 9,362,172.81 You are directed to make the following changes in the Contract Documents. Description; 1 Clearing and Grubbing $ 41,952.73 /LS x -1 LS $ (41,952.73) 13 Storm Sewer, Trenched, RCP, Class III, 15 in $ 73,12 /LF x 25 LF $ 1,828.00 17 15" RCP Apron 4030.222 $ 2,756.94 /EA x 2 EA $ 5,513.88 19 RCP Apron Footings 4030.221 $ 1,198.71 /EA x 2 EA $ 2,397.42 51 Removal of Playground Surfacing $ 7.19 /SY x -633 SY $ (4,551.27) 54 Painted Pavement Markings, Solvent/Waterborr $ 95.90 /STA x -40.53 STA $ (3,886.83) 55 Painted Pavement Symbols, Solvent/Waterborn+ $ 59.94 /EA x -16 EA $ (959,04) 57 Type A Signs, Sheet Aluminum $ 29.98 /SF x -57 SF $ {1,708.86) 58 Perforated Square Steel Tube Posts $ 19.18 /LF x -220 LF $ {4,219.60) 59 Perforated Square Steel Tube Anchor $ 467.48 /EA x -22 EA $ {10,284.56) 120 Large Shrubs (5 GAL. CONT. B&B) $ (15.79) /EA x 120 EA $ (1,894.80) 125 Wood mulch for planting beds $ (0.29) /SF x 24120 SF $ (6,994.80) TOTAL ADDITIONS $ (66,713.19) Reason for Change Order 1 This work will be removed from the contract. 13, 17, 19 Increase in quantities required as shown on the attached C Sheets showing the revised grading changes to allow for contractor to dispose of material onsite and raise soccer field elevation. 51, 54, This work for these seven bid items will be removed from the contract. 55, 57, 58, 59 120 Large #5 shrubs to be changed to smaller #3 shrub of the same variety for the reduced unit cost. 125 This bid item eliminates weed barrier under mulched areas for a reduced unit cost. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 9,362,172.81 Original Working Days 2401 2401 Previous C.O.s (ADD/DEDUCT) $ This C.O. (ADD/DEDUCT) $ (66,713.19) Revised Working Days: 1- Contract Price with all approved Change Orders: $ 9,295,459.62 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO, APPROVED: BY: Quertli Z J tci E 8/7/2023 Owner (Authorized Signature) Date ACCEPTED: BY: ` 6/ 3AL 3 ontractor (Authorized Signature) Date' ACCEPTED: � �� BY: 77/ /:, $ /fter 8-3-2023 AECOM Date AECOM 60672429 ( 1 Project No. C.O. No, Sweeney, Michelle From: TRAVIS NICHOLS <TRAVIS.NICHOLS@WATERLOO-IA.ORG> Sent: Tuesday, June 27, 2023 9:15 AM To: Sweeney, Michelle; mark (mark@ritlandkuiper.com) (mark@ritlandkuiper.com) Cc: PAUL HUTING; TODD DERIFIELD; JAMES BOLGER Subject: Notice to Proceed-V/E and City Items Attachments: +2023-05-31 City Woodruff VE Meeting.pdf Michelle, Leisure Staff reviewed items that we said could possibly be covered by City Staff and have compiled this list as ones that we will complete in house. If Woodruff could give us a timeline for completing these it would be appreciated. We would like you to give the Notice to Proceed subject to all items listed on your V/E meeting minutes attached above as soon as possible to get the project moving. We would like to address any individual V/E items as they appear so we can give responses in a timely fashion and allow Woodruff time to implement those changes. We would like to think that V/E pricing for electrical, trail lights, fencing, block and signage should be completed by now. If there is something we need to do on our end to expedite the process let us know. Thanks Line item 1 Clearing and Grubbing Line item 48 Removal of Granular Surfacing Material (both locations) Line item 51 Removal of Playground Surfacing to include timbers Line item 54 Painted Pavement Markings Line item 55 Painted Pavement Symbols Line item 57 Type "A" Signs Line item 58 Perforated Square Steel Tube Post Line item 59 Perforated Square Steel Tube Anchors Travis Nichols Facilities/Project Manager Waterloo Leisure Services CITY OF WATERLOO 0: 319-291-4370 F: 319-291-4297 SCITY OF WATERLOO Leisure Services www.waterlooleisureservices.org Iriy Linked ,7ro€iI' DISCLAIMER The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, i 3 J • D 6_ IN PCC RECREATIOItJ TRAIL (203.5SY) SEWER MANHOLE ADJUSTMENT EX EIM:867.26 PRO R\IM:869.06 95LF PC STANDARD IN PCC CUR AND GUTTE /\E /DiaiLE STREET II Li V \ 11 1 > 4 C U C RELOCAtED GATE / I / / I 1--" / I I / i / / / I I i I I \ I 1 I \ E I 1 I 1 I \ I I I \ > 1 1 \ 1 E I I I 1 1 I i 1 I 1 1 17 I 1 1 1 17 I 1 a1 I 1 1 14 1 1 I &I I i \ 1 1 2 I I 11 1 I i. I1 I II 1 II I i I 1 a 1,,1I A 1 a i`, 1 VI 1 \\ a N. 1 I1 V A / v v • vv 1 I I IiII:IIv v 1 1 1 — JIIIIII1II1II——- . — — ▪ v v V �� 1 la a1 • / v I I •�� I/ -------------- V A V v • • \ I \ I A // / I A\ \ 2.MILL EXISTING CURB AT / \\ •\\ \\\ ' -CURB �R i P OPENING / ( \2. N. , a ■ I I i DETECTABLE WANING PANELS / -• \ r/• Iv v \ \ • • - -fEir -/--1Lir - -2 /- SfJr 'tlt-.Cli �, GRAVEL —SHAPING• • • • • • • • • • • • Loge \ --- -- ' \ AND GRADING'• • x� \ \V A \ \V A A A / , zz i PROTECT PRIVATEvv PROPERTY NN- I I I • • N. N.Q. • STAGE 2 BOUNDARY 6 IN PCC RECREATION TRAIL(840.8SY) R LOCATION SEWER MAN OLE EX •0.41 PRO RIB=,:.61. SOCCER FIELD FLOODWAY BOUNDARY EXISTING FLOODPLAIN 0' SCALE • CO 1 Gates Park F.Y. 2023 Improvements Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 Issued No. CO Date Description CHANGE ORDER 1 Issue Date : 03/22/23 Designed By : JLK Drawn By : JLK Sheet Title Reviewed By : JLK SITE PLAN Upper Gates Category Sheet C1.02 City of Waterloo Contract No. Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y `C `C `C `C `C `C `C `C `C `C `C `C `C `C `C `C `C `c `c `c `C NNNNN C C C `c `c `c `c N `c N N N N N `c N I N N I I N N N N N N N E DALE ST 1 1 • E LOUISE ST 7 :.. • / • • / 7 / 7• •7 / 7 • ♦ / / • • l \ \ => v / • • / / / � / • 7 / 7 / • EXISTI\G FLOODPLAIN / / j // / / EXISTING FLOODPLAIN SCALE Gates Park F.Y. 2023 Improvements Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 Issued No. CO' Date Description Issue Date : 03/22/23 Drawn By : JLK Sheet Title CHANGE ORDER 1 Designed By : JLK Reviewed By : JLK SITE GRADING PLAN Upper Gates Category Sheet C3.02 City of Waterloo Contract No. (1) 0 0 W 0 0 0 Z J W d_ 5 0 z J N N N 2 >- 0 0 0 / • • • / / / � *4 I o J� O e / / 1; \ It\ • • 5 \ \ \/ \ „ tf'�4 V V fie. 0 0 4 1\ l + / / 0 4 II \ / �V Ai' ".. ' , \ \ice/ -_ - - - ii),410r Gates Park - '� �'e� _ 1. _Ihr 3 �.-.. F•Y• Jmprovements Water 2023 � oo, Iowa ° A@l ` \ \ ,/ s/ NC° v �` /Q 15 IN RCP APRONS Ru�u 4 k )1 1 ' v v . $ 6 PE"FORATE 235LF I N SUBDR "IN �1 v D - - - ....... EX STRUCTURE LT --__ STA 24+ORIM�, 0' 869.98 INV IN=859.22 o p, , , ''.e\ .,,, , , ,... gy V\ N \ v. 1 �+, \it4 �� aVD N, �'�, ��-/' `S '*14LF 61N OUTLET P P \ 0 , \*, --, - \ \ \ 'ERFORATEq \il '� : N, ��,.TP-2 / .� h , t�sl,\ / pr / \ ham h -40 Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: urveyor: Inc.Iv 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 EXISTING CULVERT TO BE CLEANED AND FLUSHED "� ��,'�� �' / \ �i v STI 22ECOM, STA 25+32 8\�� 8 0' R T wv , y �� - - A\ _ _ = ;� RIM 865 69 -� �� INV IN=863.00 INV OUT=860.50 © vv ' y /' v /' �,,, �� 880 880 �I C O I -C 875 875 875 EX STRUCTURE STA 24+04.42 FG = 8 6 9. 6 8 875 870 870 -( -< -< . Issued No. Date Description STP-24 FL=859.22 STP-23 STI-22 STA 25+32.88 FG=865.69 FL=863.00 - ', CHANGE ORDER 1 CO 870 STP-24 FL=860.50 870 865 ---- _ 865 -C 865 ---- ------ --- ---- 865 30 LF CO CRETE P-E-0-0-50% -( 13 LF PVC P E @ 0.00% ` I \ IPE @ 1.00% i 860 860 128 LF CONCRETE Issue Date : 03/22/23 Designed By : JLK ns T' 860 855 855 -< 860 855 855 Drawn By : JLK Reviewed By : JLK 850 850 .< -< 850 850 Sheet Title STORM DRAINAGE PLAN Upper Gates �• 032 , .� • co. ,�• 00 co. ^ -� 845 845 36+80 37+00 38+038+05 -'1 ) ' 0' 20' 40' - in• te•a, � � �� � � �ro O� •o �� �ro oo �°' �� MM ter` �� �� co �ao • Category C6.04 City of Waterloo Contract Sheet No. 23+50 24+00 25+00 26+00 0' SCALE 26+50 20' 40 m SCALE m - IA A \ I \\ \ I A / A 1 I 1 / v 1 / , 1 1 �v 1 / I i I I 1 1 N il — e. 885 864 863 FLOODWAY BOUNDARY FLOODPLAIN BOUNDARY 885 0' SCALE 880 00 + 0 ram) + 0 863.851 FLOODPLAIN BOUNDARY I N + 0 N NCO 0000 Na) o co 880 875 O o O o (n — II 000 Q (/) II W W N O + 0 III aDa co ELEV H 0 ^ O N 01 a0 )3+12.37 N N II Q N II W w )4+37.16 O CO 0) > Q J n ``' r; + o o 0• co 0 00 0- + 0 CO 875 870 o II H 0) II Y Ww ct Wm w 8 II (n IIY Ww Wm w o II H cn II W w '-- II I- in II W w Y W 0] w — II I- cn II W W IC CO w ' II H N II W W a II I- cn II W W II H N II W W 870 865 PROPOSED GRADE o 0 W a EXISTING GRADE 865 r _ ------- - \ — FLOODWAY BOU �DARY ---- 855 GRADE ELEV BREAK STA = 860.25 = 105+05.10 855 N co 00 O co CO (V Op '- N O 00 I'7 00 � O CO O O OD M O CO 00 � •4 a co O CO DD Cn N CD CO O CO N ^ Cn O CO 00 r` � 00 00 (O CO N N 00 N. (O ao r` Cn M 00 fir` O ao N M 00 �_ O N � M 00 � O c0 co N N M 00 � O co co r` Cn • N 00 N O CO co N r` N 00 o O CO co r` � • N 00 O O CO co N N N 00 O CO co I� Ob ' O O0 O CO co N 1' 3 (o O N O CO 0) r` � • 3 (o co i"'7 O CO 00 N N • ( (o 0o O CO co CO 0o CO O O O co r` O CO 0o r` O CO co co O CO 00 C M O 99+50 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 1t1 80' Gates Park F.Y. 2023 Improvements Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 Issued No. Date Description Issue Date : 03/22/23 Designed By : JLK Drawn By : JLK Reviewed By : JLK Sheet Title FLOODWAY GRADING EXHIBIT Upper Gates Category Sheet 1 City of Waterloo Contract No. WOODRUFF CONSTRUCTION 1 00% Employee Owned 1717 Falls Avenue I Waterloo, IA 50701 Ph: (319] 233-3349 Fax: [319] 233-3369 6/28/2023 Michelle Sweeney AECOM 501 Sycamore St. #222 Waterloo, IA 50703 RE: FY 2023 Gates Park Improvements 820 E Donald St. Waterloo, IA 50703 SUBJ: Potential Change Order #002 — Landscaping VE Items Dear Ms. Sweeney, Per your direction from the VE meeting discussion on 5/30/23 and our discussion with Matthias Landscaping on 6/7/23, we are proposing the following for landscaping VE Items: • Bid Item #120 Large Shrubs — DEDUCT to change #5 shrubs to #3 @ $15.79/shrub (QTY. 120) = ($1,894.80) • Bid Item #123 Wood Mulch for Planting Beds — DEDUCT weed barrier from amount = ($7,000.00) • Please see attached sheet regarding other items that were discussed during the VE meeting on 6/7 in response to other possible cost reduction measures Our total price to perform the subject changed work will be a credit of $8,894.80. When this potential change order is signed by the Owner and a copy is returned to the contractor, approval of change(s) is effective IMMEDIATELY and we will proceed with the change(s) described above. Approved changes will be included in a future contract change order. If you require additional clarification, please contact me. Thank you for your prompt response. Sincerely, WOODRUFF CONSTRUCTION, INC. Will McAllister Project Manager cc: File 62uertEi� r( sus o / 8/7/2023 Owner Approval / Date Architect Approval / Date Will McAllister From: Nathan Lansing <nate@matthiaslandscaping.com> Sent: Tuesday, June 27, 2023 5:24 PM To: Will McAllister Cc: Doug Matthias Subject: External: Re: Gates Park Landscaping VE Recap All, Following up on some action items/notes from yesterday's electrical VE meeting — 1. Matthias mentioned that their irrigation sub has included to use a backhoe for the 3" irrigation line. There were questions on why this couldn't be trenched in. Matthias to check with his irrigation sub to see if that is a possibility / supply team with more info on why we need to backhoe the 3" line a. Could the golf course assist with 3" install if irrigation sub does not feel it is possible to open trench with a 3" line? Confirmed with irrigation company they are trenching not backhoe, misunderstanding on my part b. Matthias is to check in with sub to see if they are comfortable with Toro Links system and control programming Irrigation company does feel comfortable they will be able to program the links system their supplier Site One is a Toro Dealer and Originally designed the system at that golf course, and their Site One Rep will be assisting our contractor with this task. 2. Breakout of central control system cost was requested by design team and city The price is the price. Doug, Mark, and John talked about this at the preconstruction meeting a couple weeks ago. 3. Matthias to give credit for switching #5 shrubs to #3 shrubs Bid Item 120: If we switch the #5 Shrubs to #3 price is $63.62 each. $79.41-$63.62= $15.79 savings ea$15.79 * 120shrubs = $1,894.80 savings 4. Matthias to give credit for eliminating weed barrier under mulched areas $7,000 savings