HomeMy WebLinkAboutBrock Even Construction - FY24 Sidewalk Infill, Sidewalk Ramp and Trail Repair, Zone 3 - CO #1 - Cont. No. 1079 - 8.21.23CITY OF WATERLOO, IOWA CHANGE ORDER NO. 01 PROJECT: FY 2024 SIDEWALK INFILL, SIDEWALK RAMP & TRAIL REPAIR PROGRAM - ZONE 3, CONTRACT NO. 1079 DATE PREPARED: AUGUST 9, 2022 AMOUNT: $53,839.48 INCREASE TO: BROCK EVEN CONSTRUCTION , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated JULY 3 2023 A. Description of change to be made or extra work to be done: Increase repair quantities for items in Division 2- ADA Ramp Repairs and Division 1A—Sidewalk Infill. Reason for ordering change or extra work: Availability of additional funds has allowed for the inclusion of ADA ramp repair and sidewalk infill in other locations in the City that meet the criteria for repair. C. Settlement for cost of work to be made as follows: Estimated Unit Prices ITEM ITEM DESCRIPTION QTY UNIT PRICE COST 1 REMOVE SIDEWALK 1,622 SF $ 3.60 $ 5,839.92 2 SIDEWALK, PCC, 4" 1,325 SF $ 7.20 $ 9,540.00 3 SIDEWALK, PCC, 6" 579 SF $ 8.40 $ 4,865.28 4 138 SF $ 85.00 $ 11,730.00 DETECTABLE WARNING SURFACE 5 SAW CUT, 1/2" CURB OPENING 87 LF $ 85.00 $ 7,361.00 6 19 LF $ 15.00 $ 282.00 REMOVE CURB & GUTTER 7 CURB & GUTTER, 24", 7.5" 12 LF $ 60.00 $ 732.00 9 CURB & GUTTER, 24", 11.5" 7 LF $ 66.00 $ 435.60 14 EXCAVATION, CLASS 10 1,801 SF $ 4.50 $ 8,105.40 15 HYDROSEEDING 1,582 SF $ 1.20 $ 1,898.28 16 WATER VALVE ADJUST 1 EA $ 150.00 $ 150.00 17 MANHOLE ADJUSTMENT 1 EA $ 1000.0 $ 1000.00 18 1.0 LS $ 400.00 $ 400.00 EROSION & SEDIMENT CONTROL 19 TRAFFIC CONTROL 1.0 LS $ 1,500.00 $ 1,500.00 TOTAL INCREASE = $ 53,839.48 1 oLC(e/Z-an 8/21/2023 BY: BROCK CONSTRUCTION INC MAYOR DATE CONTRACTOR ATTEST: Kelley Felchle SIG D 8/21/2023 CITY CLERK DATE BY: DATE TITLE: 2