CHANGE ORDER NO. 01
PROJECT: FY 2024 SIDEWALK INFILL, SIDEWALK RAMP & TRAIL REPAIR PROGRAM - ZONE 3, CONTRACT NO. 1079
DATE PREPARED:
AUGUST 9, 2022 AMOUNT: $53,839.48 INCREASE
TO: BROCK EVEN CONSTRUCTION , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the following extra
work on your contract dated JULY 3 2023
A. Description of change to be made or extra work to be done:
Increase repair quantities for items in Division 2- ADA Ramp Repairs and Division 1A—Sidewalk Infill.
Reason for ordering change or extra work:
Availability of additional funds has allowed for the inclusion of ADA ramp repair and sidewalk infill in other locations
in the City that meet the criteria for repair.
C. Settlement for cost of work to be made as follows:
Estimated Unit Prices
ITEM
ITEM DESCRIPTION
QTY
UNIT
PRICE
COST
1
REMOVE SIDEWALK
1,622
SF
$ 3.60
$ 5,839.92
2
SIDEWALK, PCC, 4"
1,325
SF
$ 7.20
$ 9,540.00
3
SIDEWALK, PCC, 6"
579
SF
$ 8.40
$ 4,865.28
4
138
SF
$ 85.00
$ 11,730.00
DETECTABLE WARNING SURFACE
5
SAW CUT, 1/2" CURB OPENING
87
LF
$ 85.00
$ 7,361.00
6
19
LF
$ 15.00
$ 282.00
REMOVE CURB & GUTTER
7
CURB & GUTTER, 24", 7.5"
12
LF
$ 60.00
$ 732.00
9
CURB & GUTTER, 24", 11.5"
7
LF
$ 66.00
$ 435.60
14
EXCAVATION, CLASS 10
1,801
SF
$ 4.50
$ 8,105.40
15
HYDROSEEDING
1,582
SF
$ 1.20
$ 1,898.28
16
WATER VALVE ADJUST
1
EA
$ 150.00
$ 150.00
17
MANHOLE ADJUSTMENT
1
EA
$ 1000.0
$ 1000.00
18
1.0
LS
$ 400.00
$ 400.00
EROSION & SEDIMENT CONTROL
19
TRAFFIC CONTROL
1.0
LS
$ 1,500.00
$ 1,500.00
TOTAL INCREASE = $ 53,839.48
1
oLC(e/Z-an 8/21/2023
BY: BROCK CONSTRUCTION INC
MAYOR DATE CONTRACTOR
ATTEST:
Kelley Felchle
SIG D 8/21/2023
CITY CLERK DATE
BY:
DATE
TITLE: