Loading...
HomeMy WebLinkAboutWayne Claassen Engineering - Hammond Bridge Replacement CES Supplemental 8 - 8.21.23WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. 2705•University Avenue P.O. Box 898 Waterloo, Iowa.50704 Fax 319/235-0028 319/235-.6294 July 20, 2023 Wayne Castle, P. E. City of Waterloo 715 Mulberry Street Waterloo, IA 50703 RE: Hammond Ave. Bridge Replacement Dear Jamie: We are enclosing herewith two (2) copies of the Supplemental Agreement No. 8 for approval on the above Project. Please return one (1) signed copy. Very truly yours, WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. J K. William J. Claaen, P. E. WJC/dad Enclosures • (Folder\Misc Corres\WayneCastle-supplemental No 7-Hammond Ave Bridge-1.Itr) Supplemental Agreement No. 8 to the Hammond Ave. Bridge Replacement Project Professional Service Agreement between the City of Waterloo, Iowa and Wayne Claassen Engineering and Surveying, Inc. PROJECT: Hammond Avenue Bridge Replacement Project TO: Wayne Claassen Engineering and Surveying, Inc. (CES) FROM: City of Waterloo, Iowa You are hereby ordered to make the following changes to the existing Agreement for Professional Services for the Hammond Avenue Bridge Replacement project, dated 10/ 02/ 2017 1. Add the following to said existing Agreement: Part III. TERMS AND CONDITIONS Article 1. ENGINEERING SERVICES 1.1 Basic Services - The Engineer agrees to perform professional services in connection with the Project, as set forth below and contained within this Agreement: A. Final Engineering Phase Task 24. Additional hydraulic modeling and exhibits for the completing Iowa DOT Hydraulic Modeling Form. This task will be completed by H.R. Green, as a sub - consultant to CES. 2. Settlement for cost of work to be made as follows: Tasks 24. These tasks increase the Basic Services Amount by $6,000.00. The Professional Services Agreement is increased by $6,000 by this Supplemental Agreement 7 to a total of $269,350. 3. All other sections of said existing Agreement remain unchanged. Page 1 of 2 CITY OF WATERLOO APPROVED: BY: Quertarz fir( Quentin Hart, Mayor of Waterloo ATTEST BY: Kerrey 'Fe[ch[e Kelley Felchle, City Clerk 8/21 /2023 Date WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. BY: William aassen, President ATTEST BY: Maxwell W. Claassen Date Page 2 of 2 1-IRGreen. HR GREEN, INC. PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 5 THIS AMENDMENT, made this 17th day of July 2023 by and between, Wayne Claassen Engineering & Surveying, Inc. the CLIENT, and HR GREEN, INC. (hereafter "COMPANY"), for professional services concerning: Hammond Avenue Bridge Over Sink Creek Hydraulic Analysis COMPANY Project Number: 181817 hereby amends the original Professional Services Agreement dated 4/18/2019 as follows: The CLIENT and COMPANY agree to amend the Scope of Services of the original Professional Services Agreement and previous amendments as follows: General 1. Project Management as necessary to complete the tasks below. DOT Hydraulic Form/Modelling 1. Add cross section downstream of crossing and adjust model accordingly 2. Perform updated encroachment analysis 3. Sensitivity analysis in attempt to match previous model 4. Complete Iowa DOT bridge/culvert form Deliverables: 1. DOT form and supporting documents Items not Included The following items are not included as part of this AGREEMENT: 1. Any design/coordination activities associated with stream mitigation for the USACE permit. 2. Site visits by COMPANY staff. 3. Surveying 4. Floodway no -rise certification 5. Locating storm sewer system structures and outfalls 6. Evaluation of proposed condition alternatives 7. Additional modelling work not outlined in the scope of services 8. Additional responses, over and above the response to the first 2 rounds of DNR and FEMA reviews of the application packet. If additional responses are necessary for CLOMR/LOMR approval, the COMPANYs required time on these will be evaluated in detail and the AGREEMENT amended to right -size the effort. 9. Wetland Delineation(s). In consideration for these services, the CLIENT AGREES to adjust the payment for services performed by COMPANY on the following basis: Per current rate schedule with a maximum fee to be increased by Six Thousand Dollars ($6,000.00) Version2.0 12172018 Amendment #5 to Professional Services Agreement Hammond Avenue Bridge Over Sink Creek: Hydraulic Analysis 181817 Page 2 of 2 HRGreen, The total authorized compensation after this Amendment, including the original Professional Services Agreement and all previous Amendments, is outlined in the table below: Change in Agreement Fee Running Fee Total Original Agreement - $12,000 Amendment #1 +$36,500 $48,500 Additional Agreement (2/19/2021) +$4,100 $52,600 Amendment #2 +$3,600 $56,200 Amendment #3 +$35,800 $92,000 CLOMR Permit Fee +$6,500 $98,500 Amendment #4 +$29,800 $128,300 Amendment #5 +$6,000 $134,300 THIS AMENDMENT is subject to all provisions of the original Professional Services Agreement. THIS AMENDMENT, together with the original Professional Services Agreement and all previous amendments represents the entire and integrated AGREEMENT between the CLIENT and COMPANY. THIS AMENDMENT executed the day and year written above. Wayne Claassen Engineering & Surveying, Inc. HR GREEN, INC. By: Bill Claassen, PE By: Teresa Stadelmann, PE, Principal Versionl.0 07012017