Loading...
HomeMy WebLinkAboutMunicipal Pipe Tool Co., CO #3 - Cont. No. 1063 - 9.18.2023CHANGE ORDER NO. 3 Owner City of Waterloo Project FY 2023 CIP PIPELINING PHASE IVA3 Date: August 28, 2023 Owner's Contract No. 1063 Contractor Municipal Pipe Tool Co. LLC SRF NON-SRF Date of Contact Start 6-tu1-21 Contract Amount: $ 1,010,539.90 $ You are directed to make the following changes in the Contract Documents. Description: 201 36" PATCHING OR GROUTING - ADDITIONAL TIME AND MATERIALS $ 49,098.50 501 ADDITIONAL CLEANING $ 14,983.00 TOTAL' $ 64,081.50 ADDITION Reason for Change Order QUANTITY RECONCILIATION - See the attached AECOM Change Order No. 1 Tabulation CONTRACT PRICE Original: $ 1,010,539.90 Previous C.O.s {ADD/DEDUCT} $ This C.O. {ADD/DEDUCT) $ 64,081.50 Contract Price with all approved $ 1,074,621.40 Total Change Orders: $ 64,081.50 6.34% Total CO % SRF $ 1,010,539.90 $ $ 64,081.50 $ 1,074,621.40 NON- SRF $ 33,812.45 $ 33,812.45 TOTAL $ 1,108,433.85 Original Completion Date: CONTRACT TIME To Substantial To Final Completion Completion 6/23/2023 Revised Completion Date: 1 12/31/2023 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the changels) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND All STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: Q te/2il/Z 9cl'E SI NED SIGNED Owner (Authorized Signature) ACCEPTED: _ BY: -'5EIGLAXVI tAktACt&A.&fr 9/18/2023 Date August 28, 2023 Contractor (Authorized Signature} Date ACCEPTED: BY: August 28, 2023 AECOM Date AECOM 60682318 I 3 Project No. C.O. No. A COM August 28, 2023 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject. FY 2023 CIP Pipelining Phase IVA3 Change Order No. 3 City of Waterloo, Iowa City Contract No. 1063 AECOM #60682318 Dear Mr Gaherty AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www aecom com Attached is Change Order No. 3 for the FY 2023 CIP Pipelining Phase IVA3. The 36-IN pipe Included in Bid Alternate No. 2 (201, $49,098.50) had many more Teaks that previously noted The leak discovery during the bidding process was under full flow conditions. Once Municipal Pipe Tool Co LLC (MP) bypassed the segment 50 additional leak locations were noted. This change order request is based on the extra time It took to repair the pipe and extra materials to grout the leaks. MP requested that they get compensated for extra time for cleaning the segments prior to lining, see that attached spreadsheet. City Staff and AECOM recommends paying 33% of the request (501 - $14,983.00) AECOM has reviewed the work described in this change order We recommend that the City of Waterloo approve Change Order No 3 in the amount of $64,081.50 (SRF). The revised contract amount of $1,074,621.40 (SRF) and $33,812.45 (non-SRF) brings the total contract to $1,108.433.85 That is a total increase to the contract of 6.34% Yours sincerely, Christopher G. Oelkers, PE Enclosure Change Order No. 3 Tabulation and Signature Form Additional Cleaning Spreadsheet Municipal Pipe Tool Co. LLC Change Order No 3 Request Form Letter from Brian Bowman to Municipal Pipe Tool Co. LLC L \DCS\Projects\WTR\60682318_CIPP_Ph_IVAY600_Construction_Support\660_Change_Orders\CO NO 3 - SRF\Wat CIPP PH IVA - Change Order No 3 LTR docx Owner: Project: Location: City Project No.: Contractor: CONTRACT CHANGE ORDER CITY OF WATERLOO Change Order No.: 3 FY 2023 CIP PIPELINING PHASE IVA3 WATERLOO. IOWA Date: July 22, 2023 CONTRACT#1063 Municipal Pipe Tool Co. LLC PO Box 398 Hudson, IA 50643 You are hereby requested to comply with the following changes from the contract plans and specifications Justification: Extra time and labor to seal pipe. Pre bid video showed 24 spots. there were 74 when the bypass was up and running to seal Bid included 160 hours for MPT Acutal hours was 362 50 Bid included 52238 in pump fees. actual was $3894 Item No. 1 2 3 Qty 202.5 1 1 Description Extra grouting labor MPT Bypass pumps and hoses Dependable's extra materials and labor The Contract Period provided for completion increase by days: Unit HR LS LS Unit Price 165.00 1.656 00 14,030.00 Change Order $ This document will become a supplement to the contract and all provisions will apply hereto. Requested: Contractor Title Accepted: Owner Title. Municipal Pipe Tool Co LLC Project Manager CITY OF WATERLOO Ext Price sharovt. Waschleat 33.412.50 1,656.00 14,030.00 49,098.50 0 Date July 22, 2023 Date VIDEO ID BASEJALT # MAP # US MH DS MH Pipe Size Prep Crew Verified Dia 1 Map Length Prep Date Prep Heavy Clean Prep Lumberjac k FT LJ Hours At 83 BASE 38 03-21 03-20 8 8 297 11/21/22 297 297 17 $ 64 BASE 31 23-06-02 23-06-01 8 8 275 11/10/22 0 276 1125 $ 72 BASE 32 05-44 05-43 8 8 373 12/06/22 0 375 7 5 $ 37 BASE 30 23-11 23-10 8 8 293 10/19/22 0 294 6 25 $ 84 BASE 38 03-23 03-22 8 8 240 11/18/22 0 245 4.75 $ 13 BASE 29 01-21-04 01-21-03 8 8 380 12/12/22 0 383 4 5 $ 53 BASE 31 22-01 23-04 8 8 i 301 11/14/22 0 303 4.5 $ 27 BASE 30 01-19-03 01-19-02 8 8 230 10/28/22 0 230 4 $ 5 BASE 29 01-20-02 01-20-01 8 8 349 10/27/22 0 348 4 $ 78 BASE 34 03-10-14 03-10-13 8 8 305 11/16/22 0 310 4 $ 57 BASE 31 22-03-02 22-03-01 8 8 206 11/09/22 0 208 3.75 $ 22 BASE 30 01-18-01 01-18 8 8 299 10/31/22 0 300 3.5 $ 15 BASE 29 01-22 01-21 10 8 370 12/07/22 0 373 3.25 $ 47 BASE 31 01-13-03 01-13-02 8 8 289 11/08/22 0 292 3.25 $ 50 BASE 31 01-15-01 01-15 8 8 300 11/04/22 0 302 3.25 $ 31 BASE 30 23-08 23-07 8 8 290 10/26122 0 290 2 75 $ 34 BASE 30 23-09-03 23-09-02 8 8 252 10/20/22 0 255 2.75 S 20 BASE 30 01-17-01 01-17 8 8 343 11/02/22 0 346 2 75 $ 26 BASE 30 01-19-02 01-19 8 8 402 10/31/22 0 405 2 5 $ 4 BASE 29 01-20-01 01-20 8 8 253 10/27/22-10/2/ 0 243 2.5 $ 56 BASE 31 22-03 22-02 8 8 294 11/10/22 0 297 2.5 $ 2 BASE 28 23-10 23-09 8 8 327 09/20/22 227 2.5 $ 91 ALT 1 ALT 1 03-16-01 03-16 8 8 255 01/13/23 0 290 2 5 $ 33 BASE 30 23-09-02 23-09 8 8 243 10/20/22 0 245 2.25 $ 25 BASE 30 01-19 01-18 10 8 328 12/08/22 332 332 2 25 $ 51 BASE 31 01-15-02 01-15-01 8 8 316 11/04/22 0 320 2.25 $ 75 BASE 34 03-10-08 03-10-07 8 8 375 11/17/22 0 378 2.25 $ 16 BASE 29 01-22-02 01-22 8 8 235 11 /11 /22 0 242 2.25 $ $ 1' ACCORDING TO BRIAN BOWMANS 08/28/2023 LETTER, THE CITY WILL PAY 33% OF THE EXT