HomeMy WebLinkAboutBoulder Contracting, LLC - Final Qty Summary - Contract No. #1090 - 10.2.2023CITY OF WATERLOO, IOWA ANAL QUANTITY ADJUSTMENT PROJECT: FY 2024 W AIRLINE HWY RAILROAD CROSSING REPAIR CONTRACT NO. 1090 Date Prepared: September21, 2023 AMOUNT: $168.61 INCREASE TO: BOULDER CONTRACTING, LLC , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated August 7. 2023. A. Description of change to be made or extra work to be done: Adjust construction quantities to actual construction quantities B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: QueizEiiz 9/arE s�HE J 10/2/2023 Mayor ATTEST: TOTAL INCREASE $168.61 BOULDER CONTRACTING, LLC Date CONTRACTOR Kelley rFeCcfife 10/2/2023 City Clerk Final Qty Adjustment TITLE: R%stC7 1 e;qe Date APPROVED: ity Engine ' r Contract No. 1090 0547 Date Sheet 1 of 2 FY 2024 W. AIRLINE HWV RAILROAD CROSSING REPAIR CONTRACT NO. 1090 PERIOD: FINAL BID ITEM ITEM DESCRIPTION UNIT ORIGINAL BID QTY. FINAL QUANTITY QUANTITY DIFFERENCE CONTRACTOR UNIT PRICE CONTRACTOR BID PRICE EXT. INCREASE/ DECREASE EXCAVATION, CLASS 10 - WASTE CY 40.0 40.0 $ 27.00 $ 1,080.00 2 REMOVAL OF PAVEMENT SY 230.3 230.3 $ 20.00 $ 4,606.00 3 REMOVAL OF PAVED DRIVEWAY SY 63.0 63.0 26.00 $ 1,638,00 SUODRAIN TILE, 6-INCH LE 95.0 112.0 17.0 $ 15.75 $ 1,496.25 267.8 5 SUBDRAW OUTLET, DR-305 EA 2.0 2.0 500.00 $ 1,000.00 6 MODIFIED SUBBASE CY 80.0 80.0 $ 60.00 $ 4,800.00 7 GRANULAR SHOULDERS. TYPES TON 10.0 17.11 7.L1 $ 45,00 $ 450.00 320.0 SURFACING, DRIVEWAY TON 27.1 24.59Sj $ 189.00 $ 5,121.90 1398.8 9 PAVED SHOULDER, PCC, 10-INCH SY 22.7 32.4 9.7 $ 118.00 $ 2,678.60 1,144.6 10 RAILROAD APPROACH SECTION, PCC SY 62.5 57.6 (4.9) 136.00 $ 8,500.00 (666.4) 11 STANDARD/SLIP-FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 10-INCH SY 167.7 159.0 (8.71 84.00 $ 14,086.80 (730.8) 12 CD JOINT ASSEMBLY EA 4.0 4.0 $ 430.00 $ 1,720.00 13 JOINT ASSEMBLY, EF EA 2.0 2.0 816.00 $ 1,632.00 14 PAINT MARKINGS, SOLVENT OR WATER -BOURNE STA 5.14 6.15 1.01 230.00 $ 1,182.20 232.3 15 TRAFFIC CONTROL 1.0 1.0 $ 5,800.00 $ 5,800.00 16 SAFETY CLOSURE EA 3.0 3,0 $ 105.00 315.00 17 MOBILIZATION LS 1.0 1.0 $ 4,000.00 $ 4,000.00 Final Quantity Adjustment PROJECT TOTALS $ 60,106.75 168.61 PAYMENTS: AMOUNT AMT. TO DATE PAY ESTIMATE 81 $ 57,261.59 $ 57,261.59 RETAINAGE 5 3,013.77 $ 60,275.36 TOTAL PAYMENTS: $ 60,275.36 CHANGE ORDERS: AMOUNT NONE $ CHANGE ORDER TOTAL $ - AMOUNT ORIGINAL CONTRACT AMOUNT $ 60.106.75 CHANGE ORDER TOTAL $ - REVISEDCONTRACTAMOUNT $ 60:106.75 FINAL QUANTITY SUMMARY $ 168.61 FINAL CONTRACT AMOUNT $ 60,275.36 Contract P1090 Sheet 2 of