HomeMy WebLinkAboutWoodruff Construction - CO #3, Contract No. 1076 - 10.2.2023CHANGE ORDER NO. 3 Owner City of Waterloo Project Gates Park Improvements Project Date: 9/13/2023 Owner's Contract No. 1076 Date of Contact Start 5/30/2023 Contractor: Woodruff Construction Contract Amount: $ 9,362,172.81 You are directed to make the following changes in the Contract Documents. Description: 5 Subgrade Preparation, 6 in. 6 Subgrade, Modified 4 in. 7 Subgrade, Modified 6 in. 16 12" RCP APRON 4030.222 17 15" RCP APRON 4030.222 18 18" RCP APRON 4030.222 19 RCP APRON FOOTINGS 4030.221 22 Subdrain, 6 in. dia. Type SP 69 Sediment Basin Dewatering Device (Perforated Riser) 130 Splash Pad Restroom Building MEPT 146 Engineering Fabric 147 Dual Tot Slide - Children's Slide TOTAL ADDITIONS 2.10 /SY x -8013 SY $ (16,827.30) (1.00) /CY x 6702 CY $ (6,702.00) (1.25) /CY x 14650 CY $ (18,312.50) (1,050.00) /EA x 1 EA $ (1,050.00) (1,000.00) /EA x 5 EA $ (5,000.00) (1,100.00) /EA x 1 EA $ (1,100.00) (950.00) /EA x 9 EA $ (8,550.00) 15.58 /LF x -1388 LF $ (21,625.04) (500.00) /EA x 6 EA $ (3,000.00) (20,513.00) /LS x 1 LS $ (20,513.00) 2.25 /SY x 11293 SY $ 25,409.25 11,460.00 /LS x 1 LS $ 11,460.00 $ (65,810.59) Reason for Change order 5 Subgrade preparation was not necessary and removed from the project due to sandy conditions. 6-7 Change of product which still meets IDOT gradation. 16-19 Switching Concrete Aprons to Steel Aprons. 22 Subdrain was removed for upper parking lot and basketball court areas. 69 Change in dewatering device style. 130 Includes the removal of pumps and associated piping from the splash pad surge tank, removal of associated conduit, wiring, disconnect, breaker, and controls for SP1 and SP2, and a new hub drain with removal drain plug as shown on attached Sheet M1.01. 146 Engineering fabric was added as a replacement of subgrade preparation. Quantity was added for basketball court paving. 147 Slide cost share with City. CONTRACT PRICE Original: Previous C.O.s (ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: To Final Completion $ 9,362,172.81 Original Working Days 2401 2401 $ (95,610.18) $ (65,810.59) Revised Working Days: - $ 9,200,752.04 CONTRACT TIME To Substantial Completion It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: 67C1tti 1/Z l'E 10/2/2023 Owner (Authorized Signature) Date ACCEPTED: BY: ractor (Authorized Signature) Da e 9/13/2023 Date AECOM 60672429 1 3 Project No. C.O. No. PETERSON CONTRACTORS, INC. EXTRA WORK AUTHORIZATION t'' IEIKKECK • - IOW PO Box A Phone: 319-345-2713 Reinbeck, Iowa 50669 Fax: 319-345-2991 i EOt �`s www.petersoncontractors.com Project Name: Date: PCI Job # Extra Work Autorization # Gate Park Improvements J23258 09/12/23 Remarks or Description of Extra Work: Below is the pricing to replace the 6" Subgrade Prep item with Seperation Fabric under the rock subbase. Item # Description Quantity Units Base Unit Rate % Mark Up % Discount Adjusted Unit Rate Total Amount 5 6" Subgrade Prep (8,013.00) SY $1.75 0.00% 0.00% $1.75 -$14,022.75 5 Engineering Fabric 8,013.00 SY $2.25 0.00% 0.00% $2.25 $18,029.25 Total Amount: The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract. $4,006.50 Work Authorized and Changes Approved by: Prime Contractor or Owner: Peterson Contractors, Inc. By: By: Chris Fleshner Title: Date: Date: 9/12/2023 IA:En PETERSON CONTRACTORS, INC.RLICZ 6 EXTRA WORK AUTHORIZATION IEIKKECK • - IOM•i PO Box A Phone: 319-345-2713 Reinbeck, Iowa 50669 Fax: 319-345-2991 i EOt �a`s www.petersoncontractors.com Project Name: Date: PCI Job # Extra Work Autorization # Gate Park Improvements J23258 09/12/23 Remarks or Description of Extra Work: Below is the cost savings to use the Recycled Concrete that PCI has available from the North Crossing. Attached is the Gradation Reports for the material, but it was not certified by IDOT for quality. Item # Description Quantity Units Base Unit Rate % Mark Up % Discount Adjusted Unit Rate Total Amount 6 4" Modified Subbase (5,792.00) SY $6.00 0.00% 0.00% $6.00 -$34,752.00 7 6" Modified Subbase (13,445.00) SY $7.50 0.00% 0.00% $7.50 -$100,837.50 1006 4" Modified Subbase (910.00) SY $6.00 0.00% 0.00% $6.00 -$5,460.00 1007 6" Modified Subbase (1,205.00) SY $7.50 0.00% 0.00% $7.50 -$9,037.50 6 4" Recycled Modified Subbase 5,792.00 SY $5.00 0.00% 0.00% $5.00 $28,960.00 7 6" Recycled Modified Subbase 13,445.00 SY $6.25 0.00% 0.00% $6.25 $84,031.25 1006 4" Recycled Modified Subbase 910.00 SY $5.00 0.00% 0.00% $5.00 $4,550.00 1007 6" Recycled Modified Subbase 1,205.00 SY $6.25 0.00% 0.00% $6.25 $7,531.25 Total Amount: The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract. -$25,014.50 Work Authorized and Changes Approved by: Prime Contractor or Owner: Peterson Contractors, Inc. By: By: Chris Fleshner Title: Date: Date: 9/12/2023 Form 821278 X Certified Sample Monitor Sample Verification Sample Source Name On -site concrete T-203 No Material Modified Subbase Class Mat'I Producer PCI Destination CERTIFIED GRADATION TEST REPORT Source Location North Crossing LLC Devlp. County Black Hawk Project North Crossing LLC Devlp. Contractor Peterson Contractors Inc. Contract # Design # Date 08/17/23 Report No. 1 Sec. Twp. Range Gradation No. 14 Beds Sampled At Streamflow County Date Sample Sampled Tested Sampled ID By By 1.5" 1" 3/4 1/2 3/8 4 8 16 30 50 100 200 Comp Tons *PRODUCTION LIMITS Max. ** 90 40 10 Min. 100 70 10 3 ***********************************************************************************************************************************************************************************************************************. 06/15/23 1 AM TG 100.0 92.5 82.8 63.9 53.0 35.2 24.3 5.3 yes 3000 07/07/23 2 AM JH 100.0 84.6 71.7 55.8 46.7 32.6 23.5 yes 3000 07/10/23 3 AM TG 100.0 93.0 83.9 63.3 54.4 38.5 27.8 7.9 yes 3000 07/11/23 4 AM TG 100.0 90.4 78.3 63.2 47.8 35.7 26.8 6.8 yes 3000 07/17/23 5 AM JH 100.0 88.0 74.7 60.0 52.8 38.1 28.4 6.4 yes 3000 07/24/23 6 AM TG 100.0 92.0 83.2 62.8 54.7 39.9 29.2 4.3 yes 3000 07/31/23 7 AM JH 100.0 79.9 70.4 56.2 43.5 30.9 20.3 * yes 3000 08/03/23 8 AM TG 100.0 87.4 71.1 55.1 45.7 32.0 23.8 5.9 yes 3000 08/08/23 9 AM TG 100.0 83.7 73.0 56.7 47.1 32.8 24.0 5.2 yes 3000 08/10/23 10 AM TG 100.0 85.6 70.6 55.8 48.8 34.4 25.1 5.3 yes 3000 * Sample contained HMA. 200 not required Average of all gradations. 100.0 87.7 76.0 59.3 49.5 35.0 25.3 ###i## ##### ##### #### 5.9 Comments: Estimated Quantity 30000 This is to certify material herein described meets the specification requirements. Total Prev. Cert. 0 Mike Peterson, Peterson Contractors Inc. Total cert. to date 30,000 Certification No. A.Mercer C1399, T.Gienau NE140, J.Hanson NE664 Reported by Mike Peterson -PCI Representing PCI WOODRUFF CONSTRUCTION 1 00% Employee Owned 1717 Falls Avenue l Waterloo, IA 50701 Ph; (319) 233-3349 Fax: (319) 233-3369 9/08/2023 Michelle Sweeney AECOM 501 Sycamore St. #222 Waterloo, IA 50703 RE: FY 2023 Gates Park Improvements 820 E Donald St. Waterloo, IA 50703 SUBJ: Potential Change Order #009 — Deduct RCP vs. Metal Aprons Storm Drainage Dear Ms. Sweeney, Per direction from email received on 9/06/23 from Chris Fleshner of PCI, we are proposing the following for the project: • DEDUCT for switching from RCP to Steel Aprons = ($11,800.00) When this potential change order is signed by the Owner and a copy is returned to the contractor, approval of change(s) is effective IMMEDIATELY and we will proceed with the change(s) described above. Approved changes will be included in a future contract change order. If you require additional clarification, please contact me. Thank you for your prompt response. Sincerely, WOODRUFF CONSTRUCTION, INC. Joshua Wolf Project Manager cc: File Owner Approval / Date Architect Approval / Date _1:10 N PETERSON CONTRACTORS, INC. �MZRLICZ 6 IC EXTRA WORK AUTHORIZATION IEIKKECK • - IOW PO Box A Phone: 319-345-2713 Reinbeck, Iowa 50669 Fax: 319-345-2991 , & � Ee. �`s www.petersoncontractors.com Project Name: Date: PCI Job # Extra Work Autorization # Gate Park Improvements J23258 09/06/23 Remarks or Description of Extra Work: Below is a cost savings option for Metal Aprons vs. RCP Aprons. Item # Description Quantity Units Base Unit Rate % Mark Up % Discount Adjusted Unit Rate Total Amount 16 12" RCP Apron (1.00) EA $2,250.00 0.00% 0.00% $2,250.00 -$2,250.00 17 15" RCP Apron (3.00) EA $2,300.00 0.00% 0.00% $2,300.00 -$6,900.00 18 18" RCP Apron (1.00) EA $2,500.00 0.00% 0.00% $2,500.00 -$2,500.00 19 Apron Toe Wall (7.00) EA $1,000.00 0.00% 0.00% $1,000.00 -$7,000.00 16 12" Metal Apron 1.00 EA $1,200.00 0.00% 0.00% $1,200.00 $1,200.00 17 15" Metal Apron 3.00 EA $1,300.00 0.00% 0.00% $1,300.00 $3,900.00 18 18" Metal Apron 1.00 EA $1,400.00 0.00% 0.00% $1,400.00 $1,400.00 19 8" Optional Toe Wall 7.00 EA $50.00 0.00% 0.00% $50.00 $350.00 0.00% 0.00% $0.00 $0.00 Total Amount: The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract. -$11,800.00 Work Authorized and Changes Approved by: Prime Contractor or Owner: Peterson Contractors, Inc. By: By: Chris Fleshner Title: Date: Date: 9/6/2023 END SECTIONS FOR HDPE PIPE Dia. Gauge Weight * A * H * L • W Slape Overall Width W Width 6" 18 10 4 3 8 12 2 20" 8" 18 14 5 3/4 4 14 1/2 16 2 1/4 27 1/2" 10" 18 17 7 5/8 6 14 1/2 20 2 1/2 35 1/4" If 16 25 7 6 21 24 2 1/2 38" 15" 16 33 8 6 26 30 2 1/2 46" 18" 16 42 8 6 31 36 2 1/2 52" 21" 16 49 9 6 36 42 2 1/2 60" 24" 16 65 10 6 41 48 2 1/2 68" 30" 14 123 12 8 51 60 2 1/2 84" 36" 14 /35 14 9 60 72 2 1/2 100" 42" 12 320 16 11 69 84 2 1/2 116" 48" 12 375 18 12 78 90 2 1/4 126" 54" 12 440 18 12 84 102 2 1/4 138" 60" 12/10 610 18 12 87 114 2 150" Toe plate extensions where specified, to be punched to match holes In apron lip. 3/8" bolts to be furnished. The length of toe plate to be as follows: W + 10" for 12" to 30" diameter pipes inclusive. W + 20" for 36" to 60" diameter pipes Inclusive. Multiple pane/ end sections shall have lap seams which are to be tightly Jointed by bolts. Comer plate, and toe plate to be same gauge as end section. + — Dimensions in Inches Plus or Minus Standard Shop Tolerance. NN,Attaches with Toe 1 Strop or Tjpe 2 Threaded Rod TAPERED SLEEVE FOR ATTACHING STEEL END SECTIONS TO SMOOTH PIPE PLAN -Reinforced edge 114 Nt al 0 12" atm. (max) FRONT Fom, 1/2"x 2 2/3" Corrugations. Maintain Inside Diameter of Sleeve. Toe Plate Extension Same Gouge os End Section NOTE: Metal to be 12 Gage Smooth Galvanized in Accordance with AASHTO M218. SMOOTH TAPERED SLEEVE DETAIL Galvanized Strap 1 2"x 6" Bolt anged Nut Pipe Pay Length TYPE 1 (10" & Smaller) TYPE 2 (12` & Larger) CONNECTIONS SHEET NO. TOTAL SHEETS No. i Date Revisions STANDARD END SECTION FOR HDPE PIPES SIDE ELEVATION OF PARALLEL DRAINAGE STRUCTURE Edge of Sidewa/ Sheet rolled snugly against steel rod Mb. 7/16" Dla Galvanized Steel Rod or Na 4 Galvanized Reinforcing Bar. t/B" (APprox.) SECTION A —A Galvanized Strap TYPE #1 CONNECTOR DETAIL 24" PARALLEL DRAINAGE STRUCTURE Pb. Sze FRONT VIEW Attaches with T, - 1 r Type 2 Threaded Rod TAPERED SLEEVE FOR ATTACHING STEEL END SECTIONS TO SMOOTH P PE 24" 1/2' Form 1/2"x 2 2/3' Corrugations. Maintain Inside Diameter of Sleeve. • Number of bars required will wry depending on the length of the End Section. Bar No. is away. located 6" above Bow line as shown. Reinforced E Full Length of End (See Section A-A) SECTION B—B END SEC770N MIN LP770WAL SAFETY BAR SNOW F04 1LLUS7RA77LW ONLY 2 2/3' NOTE Meta to be 12 Gage Smooth Galvanized in Accordance with AASHTG A1218 SMOOTH TAPERED SLEEVE DETAIL 3' 0.1,48ed Pin. Flatten end then lend mite* 4" to match end section side. PARALLEL BARS DETAIL OF OPTIONAL SAFETY BARS 48" Max 48' Max. Spa. Slope GENERAL NOTES STEEL Steel shall meet AASH.T.a Specification. SHEET NO. TOTAL SHEETS CONNECTORS Sizes thru 24' attach to pipe with Two /1 strap. A6 other sizes attach with Type /2 Rods and Lug. TOE PLATE EXTENSIONS Ilhow required toe plate extensions are to be the sane gage as End Section. Dimensions shall be Overall NTdth less 6 inches by 8 inches high. OPTIONAL SAFETY BARS Safety ha; when specified shall be Schedule 40 GavanMed Steel PO. Pipe to be Galvanized after forming. SIDE ELEVATION FOR CROSS DRAINAGE STRUCTURE Over Top of End Section. Side Lugs to be Bated to End Section. Side L. TYPE /2 CONNECTOR DETAILS For 30" and Larger CROSS DRAINAGE BAR DETAIL OF OPTIONAL SAFETY BARS Optional Ouse Drainage Bar MISCELLANEOUS DETAILS Deta,s of Construction Materials and Worlanonehb not shown on this drawing shall conform to J & J Drainage Products Standard. Sizes over 24" have mult(ae panels joined with bats and nut. Slotted holes for safety bar attachment shall be provided for all End Section. METAL END SECTIONS FOR ROUND PIPES Pipe Dia. On.)ln. Min. Thick. Dimensions + or — 2' L Dimensions + or — 2' Cage A N W Overall Ntdth Slope(ln.) Length 'S Length On.)Slope Length (In.) 12 .064 16 8 4 18 34 6.1 27 15 .064 16 8 6 21 37 4a 1 20 6,1 30 10 I• 70 18 .064 16 8 6 24 40 4e 1 32 81 48 10 I• 100 24 .064 16 8 6 30 46 4e 1 56 6,1 84 la 1. 160 30 .109 /2 12 9 36 60 4e 1 80 6,1 120 10,1• 220 38 .109 12 12 9 42 86 4.1 104 6.1 156 10,1• 280 42 .109 12 16 12 48 80 4,1 128 51 192 48 .109 12 16 12 54 86 51 152 81 228 54 .109 12 16 12 60 92 51 176 6.,1 264 60 .109 12 16 12 66 98 51 200 6.7 300 Din Head Bolts (To.) Bars shown are for Cross Drainage Structure. Cross Drainage bar rerjA only when span M greater than 30. Cro s Dra7noge bar is welded to Parallel bars for angle piece structure. CROSS DRAINAGE STRUCTURE • — Minimum Thickness of all 1O.1 Slope End Sections is 0.109' (12 Gage) No Date Revisions SAFETY SLOPE END SECTION FOR HDPE PIPES & i CJ & J DRAINAGE PRODUCTS CO 1 J & J Drainage Products Co. BOX 829 • HUTCHINSON. KS 67504-0829 • www.JJDrainage.com • (620) 663-1575 • FAX (620) 663-1701 • (800) 331-7465 .20 SMOOTH TAPERED SLEEVE Alternate View For Female End Diameter f � 1/4" . Mastic Where Required See Smooth Tapered Sleeve Detail Pay Length I Varies 24" Attaches with Type 1 Strap or Type 2 Threaded Rod END SECTION WITH OPTIONAL SAFETY BAR SHOWN FOR ILLUSTRATION ONLY TAPERED SLEEVE FOR ATTACHING STEEL END SECTIONS TO SMOOTH PIPE Nom. Dia. — 1/4" 24" /2fH 2 2/3" i Nom. Dia. + 1/8" Before Corrugating Form 1/2 x2 2/3" Corrugations. Maintain Inside Diameter of Sleeve. Finished End to be the Some Diameter os Corrugated Steel Pipe Diameter. SMOOTH TAPERED SLEEVE DETAIL PETERSON CONTRACTORS, INC. EXTRA WORK AUTHORIZATION t'' NEENNECN • - IOWA PO Box A Phone: 319-345-2713 Reinbeck, Iowa 50669 Fax: 319-345-2991 i EOt �`s www.petersoncontractors.com Project Name: Date: PCI Job # Extra Work Autorization # Gate Park Improvements J23258 09/12/23 Remarks or Description of Extra Work: Below is pricing to install Hickenbottom Basin Dewatering Devices in the ponds. Item # Description Quantity Units Base Unit Rate % Mark Up % Discount Adjusted Unit Rate Total Amount 69 Sediment Basin Dewatering Device (6.00) EA $1,750.00 0.00% 0.00% $1,750.00 -$10,500.00 69 Hickenbottom Basin Dewatering Device 6.00 EA $1,250.00 0.00% 0.00% $1,250.00 $7,500.00 Total Amount: The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract. -$3,000.00 Work Authorized and Changes Approved by: Prime Contractor or Owner: Peterson Contractors, Inc. By: By: Chris Fleshner Title: Date: Date: 9/12/2023 WOODRUFF CONSTRUCTION 414 100% Employee Owned Michelle Sweeney AECOM 501 Sycamore St. #222 Waterloo, IA 50703 RE: FY 2023 Gates Park Improvements 820 E Donald St. Waterloo, IA 50703 1717 Falls Avenue I Waterloo, IA 50701 Ph: (319) 233-3349 Fax: (319) 233-3369 8/28/2023 SUBJ: Potential Change Order #007 — Deduct Pumps SP1 & SP2 Dear Ms. Sweeney, Per direction from email received on 8/18/23, we are proposing the following for removing pumps SP1 and SP2 from project: • DEDUCT for removing pumps and associated piping from the splash pad surge tank = ($18,890.00) • DEDUCT for removing associated conduit, wiring, disconnect, breaker and controls for SP1 & SP2 = ($1,938.00) • ADD for new hub drain with removal drain plug as shown on the new plans = $315.00 Our total price to perform the subject changed work will be a credit of $20,513.00. When this potential change order is signed by the Owner and a copy is returned to the contractor, approval of change(s) is effective IMMEDIATELY and we will proceed with the change(s) described above. Approved changes will be included in a future contract change order. If you require additional clarification, please contact me. Thank you for your prompt response. Sincerely, WOODRUFF CONSTRUCTION, INC. Will McAllister Project Manager cc: File Owner Approval / Date Architect Approval / Date 2023 RITLAND+KUIPER LANDSCAPE ARCHITECTS COPYRIGHT PLUMBING FIXTURE CONNECTION SCHEDULE ITEM WASTE SIZE VENT SIZE WATER SIZE HOT COLD WATER CLOSET (FLUSH VALVE) 4" 2" - 1-1/2" URINAL 2" 1-1/2" - 1" LAVATORY 1-1/2" 1-1/2" 1/2" 1/2" SINK 1-1/2" 1-1/2" 1/2" 1/2" JANITOR SINK 3" 1-1/2" 3/4" 3/4" DRINKING FOUNTAIN 1-1/2" 1-1/2" - 1/2" VALVE BOX - - 1/2" 1/2" DRAIN BOX 2" 1-1/2" - - FLOOR DRAIN / FLOOR SINK 3" 1-1/2" - - TYPICAL VENT STACK - 3" - - NOTES: 1. ALL SANITARY SEWER BELOW GRADE SHALL BE A MINIMUM OF 3" UNLESS OTHERWISE NOTED. 2. ALL VENT BELOW GRADE SHALL BE A MINIMUM OF 2" UNLESS OTHERWISE NOTED. 3. NOT ALL FIXTURES ON THIS SCHEDULE MAY BE USED. MECH. CHASE 132 EXISTING SOUTH RESTROOM PLUMBING 1/8" = 1'-0" 2022-135 GATES PARK SPLASH PAD 2" CW DN 2" BFP WHH YYYYYYYYYYYYYYY STORAGE EWH-1 128 3/4" HW- - -3/4 CW- V = 3" V UP TO MECH/STORAGE 3" VTR 127 Oel 3/4" CW 3/4" HW- WC-2 a ,, •' WC-2 2"CW o- HB-1 I1_e'r. ` D 1I HB-1 WC-1 3 <D WC-1 WC-1 3 WC-1 U_2 4 MEN'S RESTROOM 125 X X D WC-1 WC-1 UUYX\/ / DF-1 2" CW WHA WOMEN'S RESTROOM 126 AMPHITHEATER RESTROOM PLUMBING 1/8" = 1-0" FOR CONTINUATION BY SITE CONTRACTOR. -52" F.L. FOR SS, -74" FOR CW. •-4" SS CW WH-1 L-1 L-1 L-1 x x x x x x x x x x x x x x x x x x x O C.O. 7 STORAGE 128 3" SS 1 1 1 1 1 1 1 AA AA 1 — *-3" SS 1 1 1 1 1 \/I MEN'S RESTROOM 125 i i 7 7 %\ \-0-10 3" FD-1 MECi/STORAGE 127 • w •-4" SS 3" SS WOMEN'S RESTROOM AMPHITHEATER RESTROOM UNDERFLOOR PLUMBING 1/8" = 1'-0" RESTROOM 107 WC-2 I V 2"CW L HB-1 U-2 X x LL-11 A A A A A A x RESTROOM 106 X/\/\/\/\AA WC 2 RESTROOM 1-1/2" AUTOMATIC POOL FILL. REFER TO DETAIL ON M5.01 WH-1 I DF-1 1-1/4" CW DN TO EWH RESTROOM 2 1/2" V 3/4" HW 2" CA c ' Lti .-. 2" CW • DMA nnnnn /C D r— ,C WC-2 HB-1 I IL-c I t� I I HB-1 L— • D —J 3"VUP U-2"CII i �D� U-2 TO 3" VTR O 7 3"VUP TO 4" VTR L-1❑ ® L-1/V/V/\(Jx1T I Oft' N 1"rt"-HW 2 1/2" CW MIING VALVE \� 1"HW�r \ 1 1/4" HW •• l 1 •L L1' cw EWH-2 c§-Bc 3"CWDNi L 1DN WM&3"BFP ♦3" CW 2" V-/ "V 3/4" CW PUMP ROOM 104 • r 1" CW 3 � 11 U0C) 1-1/4" TW 2" V Ail #EWS-1 JS-1 STORAGE SPLASH PAD RESTROOM PLUMBING 3/4" HW 3" V 2" CW RESTROOM 3/4" CW DF-1 1/8" = 1-0" RESTROOM 107 3" FD-1 x"AAAAAA X x RESTROOM - 106 RESTROOM 105 �/\ SURGE TANK AND VENTAR BY OTHERSQ PUMPS BY AQUATICS CONTRACTOR 3" FD-1 3" CW 4" FD-2 i I I I I 14" FD-21 1 1 �ZT'\ PUMP ROOM 104 > 4' ss A Oco 4" SS 3" FD-1 7 RESTROOM 100 X AAAAAAX X 3" FD-1 fi 3" FD-1 • 6" SS 6" SSA '-RESTROOM 101 RESTROOM 102 X /\/\/\/\/\X 6" SS 6" SS 6" SS 4" FD-2 2-1/2" CW UP FOR CONTINUATION BY SITE CONTRACTOR. -54" F.L. FOR SS, -75" FOR CW. 6" SS 4" FD-2 —4" FD-2 STORAGE 103 6" SS J/\ 3" FD-1 UV DISINFECTION BY AQUATICS CONTRACTOR SPLASH PAD RESTROOM UNDERFLOOR PLUMBING 1/8" = GENERAL NOTES: A. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY PLACEMENT OF NEW EQUIPMENT/FIXTURES PRIOR TO INSTALLATION. B. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE SPACE. C. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH FOOTINGS, FLOW LINES, LOCAL PLUMBING CODE AND THE SPECIFICATIONS. D. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK. E. COORDINATE ALL PLUMBING AND PIPING ROUTING WITH BUILDING STRUCTURE AND OTHER TRADES PRIOR TO INSTALLATION TO ALLOW FOR PROPER CLEARANCES AND FLOW REQUIREMENTS. F. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL WATER HAMMER ARRESTORS ON ALL GROUP BATHROOM COLD WATER PIPE LOCATIONS. PROVIDE WITH SHUT-OFF BALL VALVE. REFER TO SPECIFICATIONS. G. ALL CONDENSATE DRAIN PIPING SHALL BE 3/4" WITH INSULATION UNLESS NOTED OTHERWISE. H. I. J. K. L. COORDINATE ALL VENTS THROUGH ROOF WITH STRUCTURAL DRAWINGS AND MAINTAIN 10FT REQUIRED DISTANCE FROM MECHANICAL EQUIPMENT INTAKES. OFFSET PIPING AS NECESSARY. COORDINATE ALL EXPOSED PIPE ROUTING WITH DESIGN TEAM PRIOR TO ROUGH -IN. SPECIFIC RACKING REQUIREMENTS MAY BE REQUIRED. COORDINATE ALL FLOOR DRAIN LOCATIONS WITH MECHANICAL EQUIPMENT AND RESPECTIVE TRADES PRIOR TO ROUGH -IN. COORDINATE SANITARY SEWER CONNECTIONS WITH STRUCTURAL DRAWINGS TO MAINTAIN REQUIRED SLOPING AND PROPER ELEVATIONS. SEE PLUMBING FIXTURE CONNECTION SCHEDULE FOR FIXTURE CONNECTION SIZES. M. COORDINATE ALL WALL CLEANOUT LOCATIONS WITH DESIGN TEAM PRIOR TO ROUGH -IN. COORDINATE ALL FLOOR CLEANOUT LOCATIONS BEING INSTALLED IN TILE, TERRAZZO OR OTHER SPECIALTY FLOOR AREAS WITH DESIGN TEAM PRIOR TO ROUGH -IN. N. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN ACCESSIBLE LOCATIONS. 0. ALL UTILITIY ENTRANCES SHALL HAVE A MINIMUM OF 6" SEPARATION BETWEEN THEM. CIVIL SHEET UTILITY LOCATIONS AND FLOWLINES SHALL SUPERSEDE PLUMBING PLANS. COORDINATE PRIOR TO INSTALLATION. REFERENCED NOTES: 0 1. ROUTE ALL PIPING IN A MANNER THAT WATER CAN BE DRAINED DOWN FOR WINTERIZATION. SLOPE ALL PIPING TO A LOW POINT WITH A DRAIN AND VALVE. PROVIDE COMPRESSED AIR FITTING IN PIPING SYSTEMS FOR WINTERIZATION. COORDINATE PLACEMENT WITH OWNER. 2. RACK PIPING ALONG WALLS TO ALLOW FOR CLEARANCE AND WALKWAY ACCESS THROUGH PLUMBING CHASE. 3. TEST SINK FURNISHED BY POOL CONTRACTOR. INSTALLED BY PLUMBING CONTRACTOR. 4. REMOVE AND REPLACE PLUMBING FIXTURES. MODIFY/EXTEND EXISTING PIPING AS REQUIRED FOR REPLACEMENT OF PLUMBING FIXTURES TO ADA FIXTURES. FIELD VERIFY EXACT EXISTING PIPING CONNECTION LOCATIONS. 5. 4" SURGE TANK OVERFLOW DRAIN. REFER TO DETAIL 2 ON SHEET R4.05 OF AQUATICS DRAWINGS. 6. PROVIDE 6" SS HUB DRAIN FOR SURGE TANK WINTERIZATION. PROVIDE SEALED REMOVAL DRAIN PLUG FOR HUB. RESTROOM I1107 l ❑ AAAAAA-7—XA RESTROOM 106 RESTROOM 105 CORROSION RESISTANT FAN AND PVC DUCTWORK PUMP ROOM 104 1 1 1 1 1 1 1 1 1 EF-A 11 7 7 RESTROOM 1100 I XAAAAAAA 7 7 7 7 7 7 7 11o1 I RESTROOM 102 /v /v x\ /v /v /v 1 -8" EA UP TO ROOF CAP TERMINATION. (TYP. 2) 8 EF-A ,/\ jij AA 4) SPLASH PAD RESTROOM HVAC PLAN 1/8" = 1'-0" 1 1 /\ /\ /\ /\ STORAGE 103 4 10"0 EA DN TERMINATION 6" A.F.F. (TYP. 2) Gates Park F.Y. 2023 Improvements Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 Issued No. 7 Date 08/03/2023 Description CO #2 Issue Date : 03/22/2023 Designed By : Drawn By : Sheet Title Reviewed By : PLUMBING & MECHANICAL PLANS Category Sheet M1.O1 City of Waterloo Contract No. 1076 2023 RITLAND+KUIPER LANDSCAPE ARCHITECTS COPYRIGHT OVERRIDE CONTROLS FO AMPHITHEATER LIGHTIN AR-2 +48" STORAGE AR-1 128 I 48" +48" M N'S RESTROOM 125 n EWH-1 /1U+48" $ MECH/STORAGE EWH-1 / AR-7 208V-2P/20A AR-6'8 +48" +48" BURG PANEL 127 o_ CD TMGB EWC AR-3 ‹-Dr- c � LOAD CENT WOMEN'S RESTROOM 126 PANEL MDP (AMPHITHEATER) R AR O AMPHITHEATER RESTROOM POWER PLAN 1/8" = 1 0 PANEL AMP FB FA STORAGE 128 MEN'S RESTIROO —125 FA FB t- FB FB - FB FA R-4 \ MECH/STORAGE 127 ‘1-77 FB WOMEN'S RESTROOM 126 O FIRST FLOOR LIGHTING PLAN — AMPHITHEATER RESTROOM LIGHTING 1/8" = 1 0 2022-135 GATES PARK SPLASH PAD EWC SP-5 r-, RESTROOM 1107 RESTROOM 106 RESTROOM C> L - c> M 1A-8 M 1A-3 AF1A C1A-5 EWH-2 208V-3P/45A MDP SP-1,3,5 IVFDI FP1 M1A-6 EF-A 48" 120V-1P/15 M 1A-4 / EF-A 1A 120V-1P/15A 1A-9 M1A-2 P1A \EF-A EF-A IVFDI 0 CP1A 120V-1P/20A C 1A-3 P1A_ 208V-3P/50A P2A MDP SP-2,4,6 208V-3P/90A EWH 2 MDP SP 7,9,110 +48"1 \ h A \ \ +48" AP1A 120V-1P/20A C1A-4 CC1 C1A-1CC2 C1A-2 TGB SP-8 SPLASH PAD RESTROOM POWER PLAN 1/8" = SP-3 EWC SP-4 UV1A 208V-2P/20A M1A-5,7 M 1A ANEL MDP (SPLASH PAD) RESTROOM s FA 107 Q) FA _]_—I / RESTROOM " FA- I — \ � _ " FA C> 106 R TROOM 105] I FB FB I el FA 1 FB FBI- C;;► FBI FB FB / MP ROOM 104 RESTROOM 100 • FA RESTROOM vl FA OD — — NO - _ FR RESTROOM - FA 102 fWl FB FC STORAG 103 II II II I FB 1 P-6 FC 117'- 1 FIRST FLOOR LIGHTING PLAN — SPLASH PAD LIGHTING PLAN 1/8" = 1'-0" GENERAL POWER NOTES: A. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET PRIOR TO ROUGH -IN. B. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL & ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE. C. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRALS. D. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF SAME WALL ARE WITHIN 6" OF EACH OTHER. E. PROVIDE CONDUIT SLEEVES WITH INSULATED BUSHINGS SERVING ALL LOW VOLTAGE CABLING. DO NOT EXCEED 40% FILL. F. PRIOR TO ROUGH -IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER. G. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR SPECIFIC DEVICE ROUGH -IN AND PLACEMENT. ANY DEVIATIONS FROM THE ARCHITECTURAL ELEVATIONS AND RCP'S SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT PRIOR TO ROUGH -IN. IF A DEVICE IS REQUIRED PER SPECIFICATION, REQUIRED FOR OPERATION, OR IS DIFFERENT IN CONFIGURATION THAN SHOWN ON ELEVATIONS AND RCP'S, CLARIFICATION AND DIRECTION MUST BE GIVEN BY THE ARCHITECT BEFORE ROUGH -IN. DEVIATIONS OR ADDITIONAL DEVICES NOT APPROVED PRIOR TO INSTALLATION SHALL BE CORRECTED AT CONTRACTORS EXPENSE. THIS INCLUDES BUT IS NOT LIMITED TO THERMOSTATS, CONTROL SYSTEM SENSORS, ELECTRICAL DEVICES, SWITCHES, DIMMERS, TECHNOLOGY DEVICES, A/V DEVICES, SPEAKERS, FIRE ALARM DEVICES, ETC. H. ALL LOW VOLTAGE WIRING SERVING POOL EQUIPMENT IS SUPPLIED, INSTALLED, AND CONNECTED BY THE POOL CONTRACTOR. LIGHTING CONTROL INTENT TYPE FA, FA2 - SHALL BE CONTROL VIA INTEGRAL BLUETOOTH- ENABLED OCCUPANCY SENSORS. IN EACH AREA (I.E. INDIVIDUAL RESTROOMS AND AMPHITHEATER SHELTER) FIXTURES WILL BE GROUPED TO ALLOW FOR LOW LEVEL DIMMING WHEN THE SPACES ARE UNOCCUPIED. AMPHITHEATER SHALL HAVE MANUAL OVERRIDE CONTROL SWITCH LOCATED IN ADJACENT UTILITY STORAGE AREA. CONTRACTOR SHALL LABEL THE CONTROL STATION TO AVOID CONFUSION. TYPE FB, FC - SHALL BE CONTROLLED IN ALL UTILITY ROOMS AND STORAGE CLOSETS VIA MANUAL ON/OFF CONTROL AS SHOWN ON PLANS. J. ELECTRICAL CONTRACTOR SHALL REFER TO AQUATIC DRAWINGS (R SERIES) FOR ADDITIONAL INSTALLATION REQUIREMENTS. REFERENCED POWER NOTES: e (NOT ALL NOTES MAY BE APPLICABLE TO THIS SHEET) 1. WIRING (LAMP POWER CORD) FURNISHED WITH UV UNIT AND INSTALLED BY THE ELECTRICAL CONTRACTOR. FINAL CONNECTIONS TO UV CHAMBER AND CONTROL CABINET BY AQUATICS CONTRACTOR. 2. CONDUCTOR CABLE CONTAINS POWER AND SIGNAL CABLES. COORDINATE REQUIREMENTS WITH WATER LEVEL SENSOR AND CHEMICAL CONTROLLER MANUFACTURERS. 3. ELECTRICAL CONTRACTOR SHALL CLEARLY LABEL CHEMICAL FEED OUTLET (CHLORINE, ACID). MATERIALS IN THESE SPACES SHALL BE CORROSION RESISTANT. 4. VFD/MOTOR STARTERS ARE FURNISHED BY AQUATICS CONTRACTOR. INSTALLED BY ELECTRICAL CONTRACTOR. 5. FURNISH AND INSTALL EPO TO SHUT DOWN WATER AND ELECTRIC SERVICES SERVING ACTIVITIES PUMP P2A. PROVIDE EPO WITH NAMEPLATE READING "EMERGENCY P2A PUMP SHUTDOWN." FURNISH AND INSTALL ALL REQUIRED RELAYS FOR CODE COMPLIANT OPERATION. COORDINATE FINAL EPO LOCATION WITH AHJ PRIOR TO ROUGH -IN. 6. ALL MATERIALS AND INSTALLATION METHODS WITHIN THIS SPACE SHALL BE RATED AND WARRANTED FOR USE IN A CORROSIVE ENVIRONMENT. ALL DEVICES SHALL BE GFCI RATED. ALL EXPOSED CONDUITS AND FITTINGS SHALL BE RMC OR IMC. ALL NON -EXPOSED CONDUITS SHALL BE RMC, IMC, OR SCHEDULE 40 PVC WHERE CODE ALLOWED. ALL CONDUITS AND FITTINGS SERVING THE EQUIPOTENTIAL BONDING FOR THE POOL SHALL BE RMC. MOTOR STARTERS, VFDS, AND DISCONNECTS SHALL BE NEMA 4X RATED. REFER TO NEC ARTICLE 680 FOR OTHER ADDITIONAL ELECTRICAL REQUIREMENTS. 7. ROUTE CONDUITS TIGHT TO MIDDLE NORTH TO SOUTH BEAM AND PENETRATE EAST TO WEST BEAMS. ALL ROUTING OF CONDUITS SHALL BE IN A CLEAN AND ORDERLY FASHION. COORDINATE BEAM PENETRATIONS WITH STRUCTURAL BEFORE INSTALLATION. ALL CONDUIT AND ASSOCIATED ELECTRICAL CONNECTORS SHALL BE PAINTED. COORDINATE PAINTING WITH GENERAL CONTRACTOR REFER TO ARCHITECTURAL PLANS FOR FINISH INFORMATION. Gates Park F.Y. 2023 Improvements Waterloo, Iowa Project Leader/Landscape Architect: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezz. A Waterloo, Iowa 50703 Phone: 319-233-8090 Civil Engineer/Surveyor: AECOM, Inc. 501 Sycamore Street, Suite #222 Waterloo, Iowa 50703 Phone: 319-232-6531 Architect: INVISION Architecture 501 Sycamore Street, #101 Waterloo, Iowa 50703 Phone: 319-233-8419 Electrical & Lighting Engineer: MODUS Engineering 214 East 4th Street Waterloo, Iowa 50703 Phone: 319-235-0650 Aquatic Designer: Water Technology, Inc. (Headquarters) 100 Park Avenue Beaver Dam, WI 53916 Phone: 920-887-7375 Issued No. 6 7 Date 05/08/2023 08/03/2023 Description ADD#6 CO #2 Issue Date : 03/22/2023 Designed By : Drawn By : Sheet Title Reviewed By : ELECTRICAL ENLARGED PLANS Category Sheet E1.00 City of Waterloo Contract No. 1076