Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation - FY24 Byrnes Aquatic Ctr, Cont. No. 1077
FY24 Byrnes Aquatic Center, Cont. No. 1077 Bid Opening — 10/26/2023 Engineer's Estimate: $7,400,000.00 Bidder Bid Security Base Bid Amount Total: $7,799,033.30 Larson Construction Co. Inc Alt 1: Add $28,000.00 Independence, IA 5% Alt 2:Deduct ($12,000.00) Alt 3:Deduct ($18,135.00) Total: $7,357,800.00 Peters Construction Corp. Alt 1: Add $54,000.005% Alt 2:Deduct ($7,500.00) Waterloo, IA Alt 3:Deduct ($50,000.00) Total: $6,993,816.62 Woodruff Construction Alt 1: Add 59,261.93 Waterloo, IA 5% Alt 2: Deduct ($4,060.00) Alt 3: Deduct ($34,037.00)