Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation FY24 Byrnes Aquatic Ctr, Cont. No. 1077
FY24 Byrnes Aquatic Center, Cont. No. 1077 Bid Opening — 10/26/2023 Engineer's Estimate: $7,400,000.00 Bidder Bid Security Base Bid Amount Total: $7,799,033.30 Larson Construction Co. Inc Alt 1: Add $28,000.00 Independence, IA 5% Alt 2:Deduct ($12,000.00) Alt 3:Deduct ($18,135.00) Total: $6,993,816.62 Peters Construction Corp. Alt 1: Add 59,261.93 Waterloo, IA 5 o�0 Alt 2: Deduct ($4,060.00) Alt 3: Deduct ($34,037.00) Total: $7,357,800.00 Woodruff Construction Alt 1: Add $54,000.00 Waterloo, IA 5% Alt 2:Deduct ($7,500.00) Alt 3:Deduct ($50,000.00)