HomeMy WebLinkAboutPeters Construction - Airport Parking Lot Canopy Project, Cont. No. 0004232 - 11.6.2023FORM OF CONTRACT
FOR THE CONSTRUCTION OF
Terminal Parking Canopy Structure
WATERLOO REGIONAL AIRPORT
In the City of Waterloo, Iowa
ICAIF PROJECT NO.9I220ALO400
CONTRACT NO. 0004232
This contract made and entered into this 6th day of November 2023, by and between the City of Waterloo, Iowa, a
Municipal Corporation, (hereinafter referred to as City), and Peters Construction Corporation of 901 Black Hawk Road,
Waterloo, IA 50701, (hereinafter referred to as Contractor),
WITNESSETH.
PAR. 1
Contractor agrees to build and construct the Terminal Parking Canopy Structure and furnish all
necessary tools, equipment, materials, and labor necessary to do all the work called for in the plans and
specifications in a workmanship like manner and for the prices set forth in Contractor's proposal
included as Attachment A for the Base Bid and Additive Alternates No. 1 and No.2 in the amount of
two million three hundred eighty-two thousand eight hundred fifty-four and no/one hundred dollars
($2,382,854.00), which was accepted by the City, and which is understood and agreed to be a part of
this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the construction of
the improvement, the Notice to Contractors as published, the Instruction to Bidders, the Form of
Proposal, the Construction and Maintenance Bonds, the Council Proceedings relating to this matter, and
the Plans and Specifications shall all be considered as forming a part of the contract the same as though
they were each set out in said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials and labor for said
work and to construct said improvements in a thorough, substantial, and workmanlike manner, and in
strict accordance with the requirements of this contract, and of the plans and specifications made a part
hereof by reference, and to the satisfaction and approval of the City and its engineer.
PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms set out in bid or
proposal to the City which has been accepted by the City and which is by reference made a part of this
contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to
Proceed" and complete within 380 calendar days unless an extension of time is granted in writing by
the Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the terms and
conditions of this contract, or the plans and specifications therefor promptly by the date herein specified,
the City may pay such additional sums as it may be required to pay by reason of the failure of said
contractor and deduct any and all such sums from any amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo, Iowa, relating
to the obstruction of streets and alleys, keeping open passage ways for water, traffic, and protecting any
excavations in any street or alley, and maintaining proper and sufficient barricades with lights and
signals during all hours of darkness, to see that the backfilling is properly done, and agrees to keep the
City whole and defend any and all suits that may be brought against the City by reason of any injuries
that may be sustained by any person or property allegedly caused by the Contractor, or his agents, while
work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for damages allegedly
sustained by reason of any act, omission or negligence of the Contractor or its agents, or on account of
any injuries allegedly sustained by reason of any obstruction, hole, depression or barrier placed or dug
Contract No. CNTRT-000423 C-1 of 3 Airline Terminal Parking Canopy Structure
Form of Contract Waterloo Regional Airport — 60694338
by the defendant or its agents, in the doing of the work herein contracted for, that it will defend said suit
and save the City harmless therein, and in case judgment is rendered against the City, the Contractor
agrees to pay the same promptly. The Contractor agrees to carry public liability insurance in a solvent
company in a sufficient amount to protect the City and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall review the
progress of the work in detail; also, to make any test or any material to be used in such work. No
material shall be used in any work until the same has first been approved by the construction reviewer.
Such construction reviewer shall have full authority to pass judgment upon all materials and upon the
manner of doing the work, and their judgment on rejecting any materials, substance, or manner of work
shall be final unless it is revoked or modified by the City Engineer.
PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once removed from the
line of work and shall not be again taken thereon or placed with the material proposed to be used without
the written consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays and prosecution
of work, but if said work is delayed by the City, the Contractor shall have such extra time for completion
of the job as was lost by reason of the delay caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or subcontractors who
shall perform labor or furnish materials entering into this improvement. It is agreed that the City need
not pay the Contractor until all such claims are paid by the Contractor. It is agreed that the City shall
not be liable for said labor, material, or men under this contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a form to be
provided by the City in the amount provided by law as stated in the Notice to Bidders, which shall be
for the benefit of the City, and any and all persons injured by the breach of any of the terms of this
contract. Said bond shall be filed with the City Clerk and shall be subject to the approval of the City
Council and is by reference made a part of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the prosecution thereof
for a period of thirty (30) consecutive days without reasonable cause, and should it fail to proceed with
said work within ten (10) days after a notice to continue or carry it on has been mailed to it at the address
given herein by the City, or after such notice has been served on it, then the City may proceed to
complete said work, using any material, tools, or machinery found along said line of work, doing the
work either by contract or as it may elect, and the Contractor and the sureties on its bond shall be liable
to the City for the costs and expenses so paid out. Said costs shall be retained by the City from any
compensation due, or to become due the Contractor, and may be recovered by the City in an action upon
Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all the provisions, stipulations,
and conditions hereof, or contained in the various instruments made a part of this contract by reference,
and upon completion and acceptance of said work, the City agrees to pay to the Contractor, in the
manner set out in the Notice to Contractors, the amount of money due the Contractor for work performed
and accepted, at the unit prices set out in the Contractor's proposal, which has been accepted by the City.
PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and the Contractor's
unit bid prices, and for which 100% surety bond is required, in the amount of two million three hundred
eighty-two thousand eight hundred fifty-four and no/one hundred dollars ($2,382,854.00).
PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and clean up said streets,
and to save the City harmless from any damage allegedly resulting from a failure to clean up and remove
the debris or put the street back in a proper condition for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and the various
instruments incorporated by reference, this contract shall govem.
Contract No. CNTRT-000423 C-2 of 3 Airline Terminal Parking Canopy Structure
Form of Contract Waterloo Regional Airport — 60694338
PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this contract, it
shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract,
same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and
which bond is in addition to the bond given by the Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of two (2) years
from and after the date it is accepted by the Council of the City of Waterloo, Iowa. Said maintenance
shall be made without expense to the City or the abutting property. In the event of the failure or default
of the Contractor to remedy any or all defects appearing in said work within a period of two (2) years
from the date of its acceptance by said Council, and after having been given ten (10) days' notice so to
do by registered letter deposited in the United States Post Office in said town, addressed to said
contractor at the address herein given, then the City may proceed to remedy such defects. The costs and
expenses thereof to be recovered from the Contractor and the sureties on its maintenance bond by an
action brought in any court of competent jurisdiction.
PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or City
Clerk/Auditor thereof not more than four (4) and not less than three (3) months prior to the expiration
of the term during which the Contractor is required to maintain said improvements, in good repair by
the terms of its Contract. The liability of the Contractor and of the sureties on its bond for maintenance
of the said improvements shall continue until three (3) months after such notice has been given to the
City, and, in any event, until two (2) years after the acceptance of the work.
CITY OF WATERLOO, IOWA
Qaertiun crt
Mayor
R1el[ey 'FelcIiCe
City Clerk
Pe4tvr C,r�y3raeri v
Contractor �] %�
BY: f ' v `—
Title:
yrwd\e 1 F. C3zsk-
NprA- s; J1a.41k-
Approved by the City Council of the City of Waterloo, Iowa, this 6th day of November 20 23
ATTEST: Kelley Fercfile Stir City Clerk
Waterloo, Iowa
Contract No. CNTRT-000423 C-3 of 3 Airline Terminal Parking Canopy Structure
Form of Contract Waterloo Regional Airport — 60694338
FORM OF BID OR PROPOSAL
Terminal Parking Canopy Structure
WATERLOO REGIONAL AIRPORT
In the City of Waterloo, Iowa
ICAIF PROJECT NO. 9I220AL0400
CONTRACT NO. 0004232
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
Attachment "A"
1. The undersigned, being a Corporation existing under the laws of the State of Iowa , a Partnership
consisting of the following partners: Bradley F _Best - President of $ Corp having familiarized
(himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work,
and with all the contract documents listed in the Table of Contents and Addenda (if any), as prepared by
AECOM now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all
supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services,
including utility and transportation services required to construct and complete this Terminal Parking Canopy
Structure, all in accordance with the above -listed documents and for the unit prices for work in place for the
following items and quantities:
Ref.
Item
Item
Unit
Estimated
Quantity
Unit Bid
Price
Total Bid Price
1
Entrance Canopy
LS
1
_
$ ? r ? 7r 7
$ 3 3;1; T Y- CO
2
Exit Canopy
LS
1
$ 470, cad
$ N;O, OOO Q.d
3
Parking Lot Canopy
LS
1
$07it 9 2)
$1, .1 , 1 2 / , GD
4
2" Mill and Asphalt Overlay
SF
10,780
$ S's' S 'r Oo
$ Cs S�'5 OC)
5
Airport Branding, Allowance
LS
1
$10,000.00
$10,000.00
TOTAL BASE BID
$ 4,j57, 763 00
ADD ALTERNATE NO. 1
1
• Additional Parking Lot Canopy Module
1 LS
1
1 $ 001 0 -} 0
$ 1?-0, 0 70. Od
TOTAL ADD ALTERNATE NO.1
$ J i� O72. 0 d
ADD ALTERNATE NO. 2
1
I CCTV Cameras 1 LS
1
$ rill 411.49
$ 6'41,_9 a/. Oa
TOTAL ADD ALTERNATE NO. 2
$ s'y 9 4). OO
i
ADD ALTERNATE NO. 3
1
Translucent Panels in ParkinR Lot Canopy
LS
1 1
$177 a) 0
$ 13 ? d / 0. O 7
TOTAL ADD ALTERNATE NO. 3
$ / 17, ] I p, ad
ADD ALTERNATE NO. 4
1
Translucent Panels in Additional Parking Lot
Canopy
LS
1
$ Lq ict� 00
$ Oa n'Y, Od
TOTAL ADD ALTERNATE NO. 4
$ i-1 J, iick o 0
2. It is the City's intention to evaluate bids reviewing both the Base Bid and Add Alternate Bids. The City
has limited funds available and will award only what funding allows. The City reserves the right to award
the contract based on the Base Bid only or the Base Bid plus any and all Add Alternate Bid Options.
3. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid
price for the work done shall govern in the actual payment to Contractor.
Contract No. CNTRT-000423
Form of Bid
BF -I of 2 Airline Terminal Parking Canopy Structure
Waterloo Regional Airport— 60694338
4. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa, to reject
any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the
undersigned within thirty (30) days after the opening thereof, or at any time thereafter before this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the prescnbed form and furnish the
required bond and certificate of the insurance within ten (10) days after the agreement is presented to him far
signature, and start work within ten (10) days after "Notice to Proceed" is issued.
5. Security in the sum of 5% of the bid amount
Dollars ($ 5% of the bld amount ) in the form of Bld Bond Certificate, is submitted herewith in
accordance with the INSTRUCTIONS TO BIDDERS.
6. Attached hereto is a Non -Collusion Affidavit of Prime Contractor.
7. Attached hereto is a Bidder Status Form indicating Resident Bidder Certification ( X ), or Non -
Resident Bidder Certification ( ). (Mark one.)
8. The bidder is prepared to submit a financial and experience statement upon request.
9. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in work for
the City in the current calendar year, are prepared to submit an AAP or Update and an EOC, within ten (10)
days of notification that the bid submitted is lowest and acceptable.
10. The bidder has received the following Addendum or Addenda:
Addendum No.
1
1
3
Date 9/15/2023
9/29/2023
10/03/2023
11. The bidder shall list the MBEJWBE subcontractor(s) amount of subcontracts and bid items on the City of
Waterloo Minority and/or Women Business Pre -bid Contact Information Form submitted with this Form of
Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this
Project to the City of Waterloo by 5:00 p.m. the business day following the day Bids on this Project are due
along with the Non -Collusion Affidavits of All Subcontractor(s).
The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND
APPROVAL" Form to be provided by City prior to approval of contract.
The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer cannot be
changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their subcontracts.
12. The bidder has felled in all blanks on this proposal. Those blanks not applicable are marked "none" or "NA",
13. The bidder has attached all applicable forms.
14. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior to the
award of a contract due to budgetary limitations.
Peters Construction Corporation 10105/2023
e of : idd (Date)
BY: Title President
Official Address: (including Zip Code):
901 Black Hawk Rd
Waterloo, Iowa 50701
I.R.S. No, 42-1414218
Contract No. CNTRT-000423
Form of Bid
BF-2 of2 Airline Terminal Parking Canopy Structure
Waterloo Regional Airport — 60694338