Loading...
HomeMy WebLinkAboutPeterson Contractors - CO#13, Cont. No. 971 - 11.20.2023CHANGE ORDER NO. 13 Owner City of Waterloo Date: 11/15/2023 Project University Avenue Reconstruction - Phase 3 Owner's Contract No. 971 Contractor: Peterson Contractors, Inc. Date of Contact Start 3/16/2020 Contract Amount: $ 14,387,651.08 You are directed to make the following changes in the Contract Documents. Description 13-1 ONSITE TOPSOIL 13-2 EXCAVATION, CLASS 10, WASTE $ 22.50 /CY x 155 CY $ 3,487.50 $ 17.50 /CY x 778.5 CY $ 13,623.75 13-3 SUBGRADE PREPARATION, 12-INCH $ 3.00 /SY x 1518 SY $ 4,554.00 13-4 SUBBASE, MODIFIED $ 54.00 /CY x 656.9 CY $ 35,472.60 13-5 PCC PAVEMENT, CLASS C, CLASS 3 $ 115.00 /SY x 1058 SY $ 121,670.00 PCC COLORED PAVEMENT, CLASS C- 13-6 4,CLASS 3 DURABILITY, 6 IN. (GREY) $ 150.00 /SY x 284.6 SY $ 42,690.00 PCC COLORED PAVEMENT, CLASS C- 13-7 4,CLASS 3 DURABILITY, 6 IN. (RED) $ 150.00 /SY x 175.4 SY $ 26,310.00 13-8 REMOVAL OF PAVEMENT $ 20.00 /SY x 66.7 SY $ 1,334.00 13-9 CURB AND GUTTER REMOVAL $ 13.00 /LF x 698.8 LF $ 9,084.40 PAINTED PAVEMENT MARKINGS, 13-10 SOLVENT/WATERBORNE $ 60.00 /STA x 2.41 STA $ 144.60 13-11 TRAFFIC CONTROL $ 12,000.00 /LS x 1 LS $ 12,000.00 13-12 TYPE A SIGNS, SHEET ALUMINUM $ 35.00 /SF x 24 SF $ 840.00 13-13 PERFORATED SQUARE STEEL TUBE POSTS $ 15.00 /LF x 27.5 LF $ 412.50 PERFORATED SQUARE STEEL TUBE POST 13-14 ANCHOR,BREAK-AWAY SOIL $ 200.00 /EA x 3 EACH $ 600.00 SEEDING, FERTILIZING AND MULCHING 13-15 FOR HYDRAULIC SEEDING, TYPE 1 $ 30,000.00 /AC x 0.1 ACRES $ 3,000.00 OPEN -THROAT CURB INTAKE SEDIMENT 13-16 FILTER $ 150.00 /EA x 4 EACH $ 600.00 MAINTENANCE OF OPEN -THROAT CURB 13-17 INTAKE SEDIMENT FILTER $ 50.00 /EA x 4 EACH $ 200.00 REMOVAL OF OPEN -THROAT CURB 13-18 INTAKE SEDIMENT FILTER $ 50.00 /EA x 4 EACH $ 200.00 13-19 MOBILIZATION $ 27,500.00 /LS x 1 LS $ 27,500.00 13-20 CONCRETE WASHOUT $ 1,500.00 /LS x 1 LS $ 1,500.00 13-21 PUSHBUTTON REPLACEMENT $ 15,345.00 /LS x 1 LS $ 15,345.00 13-22 STREETLIGHT RELOCATION $ 37,290.00 /LS x 1 LS $ 37,290.00 TOTAL ADDITIONS $ 357,858.35 Reason for Change Order 3-1-13-20 These bid items includes all labor, equipment and supplies to construct the left -turn lane into the developable site north of University Avenue and east of Black Hawk Creek. 13-21 This bid item includes all labor, equipment and supplies to replace the pushbuttons along University Avenue. 13-22 This bid item includes all labor, equipment and supplies to relocate the streetlights at Fletcher Avenue. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 14,387,651.08 Original Completion Date: 11/20/20201 11/20/20201 Previous C.O.s (ADD/DEDUCT) $ 68,274.09 This C.O. (ADD/DEDUCT) $ 357,858.35 Revised Completion Date: Contract Price with all approved Change Orders: $ 14,813,783.52 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALI STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO, APPROVED:Ottertail9-tart BY: 11/20/2023 Owner (Authorized Signature) Date l., signed by Chris D. Fleshner ACCEPTED:CI I.,Iris D. FIes lidIJyh S, E cfleshner@pcius.com, leshner BY: 023.11.17 11:06:34-06'00' Contractor (Authorized Signature) Date ACCEPTED: ��yy""/���//������// c�jf BY: //��G„L(, /or Smweer AECOM Date 11 /17/23 AECOM 60630288 I 13 Project No. C.O. No.