Loading...
HomeMy WebLinkAbout2010-350-5 /10/2010(This Notice to be posted) NOTICE AND CALL OF PUBLIC MEETING Governmental Body: The City Council of Waterloo, Iowa. Date of Meeting: May 10 , 2010. Time of Meeting: 5:30 o'clock P.M. Place of Meeting: Council Chambers, City Hall, Waterloo, Iowa. PUBLIC NOTICE IS HEREBY GIVEN that the above mentioned governmental body will meet at the date, time and place above set out. The tentative agenda for said meeting is as follows: General Obligation Bonds. X Resolution Electing Classifications and Procedures for Proposed Bond Projects Such additional matters as are set forth on the additional 20 page(s) attached hereto. (number) This notice is given at the direction of the Mayor pursuant to Chapter 21, Code of Iowa, and the local rules of said governmental body. Suzy S hares, City Clerk, Waterloo, Iowa -1- May 10 2010 The City Council of Waterloo, Iowa, met in regular session, in the Council Chambers, City Hall, Waterloo, Iowa, at 5:30 o'clock P.M., on the above date. There were present Mayor Ernest G. Clark . in the chair, and the following named Council Members: Cole, Getty, Jones, Schmitt, Welper, Hart Absent: Greenwood -2- Council Member Welper introduced the following Resolution entitled "RESOLUTION ELECTING CLASSIFICATIONS AND PROCEDURES FOR PROPOSED BOND PROJECTS", and moved that the same be adopted. Council Member Hart seconded the motion to adopt. The roll was called and the vote was, AYES: Cole, Getty, Jones, Schmitt, Welper, Hart NAYS: none Whereupon, the Mayor declared the resolution duly adopted as follows: RESOLUTION NO. 2010-350 RESOLUTION ELECTING CLASSIFICATIONS AND PROCEDURES FOR PROPOSED BOND PROJECTS WHEREAS, this Council proposes to authorize the issuance of general obligation bonds under Chapter 3 84 of the Code of Iowa for the purpose of providing funds to pay the costs of the fiscal year 2011 capital improvements projects; and WHEREAS, the projects consist of both essential corporate purposes and general corporate purposes, as those terms are defined in Section 384.24 of the Code of Iowa; and WHEREAS, Section 384.28 of the Code of Iowa provides generally that the definitions of essential corporate purposes and general corporate purposes are not mutually exclusive, and that if a project or activity may be reasonably construed to be included in more than one classification, the Council may elect at any time between the classifications and the procedures respectively applicable to each classification; and WHEREAS, the Chief Financial Officer has proposed that the projects to be funded with the proposed general obligation bonds be classified for purposes of the applicable hearing procedures as set forth in the Requested G.O. Bonds FY2011 summary attached hereto and made a part hereof. -3- NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, that the classifications and procedures proposed in the Requested G.O. Bonds FY2011 summary attached hereto be and hereby are in all respects approved, and the City Council hereby elects the classifications and procedures indicated on said summary, as authorized by Section 384.28, for purposes of establishing the classifications and hearing procedures applicable to the proposed FY2011 project bonds. PASSED AND APPROVED this 10`x' day of May , 2010. ATTEST: Suzy Schakes, City Clerk rnest G. Clark, Mayor CIG -3 CERTIFICATE STATE OF IOWA ) ) SS COUNTY OF BLACK HAWK ) I, the undersigned City Clerk of Waterloo, Iowa, do hereby certify that attached is a true and complete copy of the portion of the corporate records of said Municipality showing proceedings of the Council, and the same is a true and complete copy of the action taken by said Council with respect to said matter at the meeting held on the date indicated in the attachment, which proceedings remain in full force and effect, and have not been amended or rescinded in any way; that meeting and all action thereat was duly and publicly held in accordance with a notice of meeting and tentative agenda, a copy of which was timely served on each member of the Council and posted on a bulletin board or other prominent place easily accessible to the public and clearly designated for that purpose at the principal office of the Council (a copy of the face sheet of said agenda being attached hereto) pursuant to the local rules of the Council and the provisions of Chapter 21, Code of Iowa, upon reasonable advance notice to the public and media at least twenty-four hours prior to the commencement of the meeting as required by said law and with members of the public present in attendance; I fiu-ther certify that the individuals named therein were on the date thereof duly and lawfully possessed of their respective city offices as indicated therein, that no Council vacancy existed except as may be stated in said proceedings, and that no controversy or litigation is pending, prayed or threatened involving the incorporation, organization, existence or boundaries of the City or the right of the individuals named therein as officers to their respective positions. WITNESS my hand and the seal of said Municipality hereto affixed this 12th day of May , 2010. SEAL / 655143.1 /MSWord\11310.086 Suzy Schkres, City Clerk, Waterloo, Iowa -5- Costs of Principal amount Issuance/Contingency "Not to exceed" Hearing of projects included allocation hearing amount ECP -1 $ 6,977,150 $113,850 $7,0913000 ECP -2 2,060,000 32,000 2,092,000 GCP-3 613,000 8,000 621,000 GCP-4 656,750 8,250 665,000 GCP-5 632,000 8,000 640,000 GCP-6 385,000 6,000 391,000 $11,323,900 $176,100 $11,500,000 Principal amount Cost of issuance "Not to exceed" Hearing of Bonds refunded allocation/continengy hearing amount ECP - 7 $4,725,000 $175,000 $4,900,000 654964 /Word\l 1310.086 Requested G.O. Bonds FY 2011-2015 J-SrD OVD Revised 2011-2015 CIP Spreadsheet April 29.xis � a Q. `J-• WQ JI CD 0 N 4 C 0 N N v 0 U N n. U 0 N O O N O O O O O O O OO O O O O O O G O 0 0 0 000 0000 0 O O O O �D O N O N. O tr1 to N tri M- oo in M O O �n N Vi d 0 0 0 0 0,0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ate+ rt{ O O O O O O O O O O O O O O O O O O O O O N Vj rd %n �n vi N h cn 00 .-- ui M N tn .. N O O O O O O O O O O O 0 O 0 O 0 O 0 O 0 O O O O O 0 O 0 ri 0 kr 0 O 0 O 0 a1 0 �D 0 h 01c: �G 0 O O O" V"�O �O N N � N N 14 N dl 'moi,•• S�+ M .��. 01 ld zw O •� •v „kn a . o a o N H Q (7 Z '01 O1:4 ^d ON y ^+ vi N N U C.' -S M p U O 'o N/ � � cOi CN rO N N n ... a•+ U U .-. .... 0 14 CD PL PL N CL ,23 r. 4) d ca ►"tic `' Z 9 o •'" , 4 0 � ,� ; ��.? •� • � Vy6� ..OV. • '0 O O O O ... N y. .'3 m N a, Gi U O p U; ^r; y O U O a"= r- 00 ONS. . . h oOO', N M �O O N M h' . t O o0 aN O OO O .+ v -+ + •+ N N N v M v t- Vl t. �A. CD 0 N 4 C 0 N N v 0 U N n. U 0 N O O N 22 Vehicle & Equipment Storage Building 27 Black Hawk St Fuel Site Im rovements 41 Black Hawk St Fuel Site Software Im r. 13 Central Garage Facilities Centralization - 85,000 85,000 0 0 15,000 35,000 �y GP - 0 . 45,000 45,000 0 700,000 700,000 700,000. C— cP—�. 2010-2014 CIP Second Revision 01-21-09 aj}1 >i�A�%>1 vt s t r ,..... ... 471b kF �f ',1���.r�,Q.Cr p � �r. MAN 121 City Facility New Construction/Remodeling Fund ,. Y 50,000 ueset �� 175,000 r r . 122,000 101 5 Sullivan Bros Convention Cntr Improvements 80,000 130,000 50,000 50,000 37 Swimming Pool Renovations 20,000 150,000 130,000 106 ADA Compliance 50,000 50,000 25,000 36. Library Improvements 5,000 61.0;000 55,000 23 Fire Station Improvements 40,000 120,000 70,000 127 Downtown Parking Garages 100,000 150,000 100,000 112 Central Gary a Facilities 100,000 0 0 103 Street Department 5,OQO 5,000 0 { 39 Young Arena Improvements 40,000 150,000 150;000 . 150,000 47 Center For The Arts 50,000. 350,000 185,000 1. �E.. a,.�Y Additional Reduction Revised Total 2010-2014 CiP Second Revision 01-21-09 Gc P-3 (SGP—& 107 79 125 54 1'47 31 57 185 Downtown Development Plan 100,000 100,000 .60,000 60,000. r- C P— Downtown Acquisitions 300,000 450,000 450,000. 450,000 MidPort 0 0 0 Bikefaz Development 50,000 0 0 Rath Tax Increment 50,000 `8002000 350,000 350,000 350,000 Logan Tax Increment. 50,000 0 100,000.. ' 100,000 100,00:0 GIS/GPS' Mapping 5,000. 5,000. 3,000'�,p --� Trail Blazing',Signs 0 0 0. San Mannan Drive 1 conomic Develo rnent 50,000 600,000 0 Demolition Projects 1.00;000' 200,000 200;000 . 2.06906D 57cA-1 Chamberlain Demolition & ie -development 75;000 0. .0 Martin Road 50,000 0 . 0 Waterloo Eliminates L.eAd HazarDs 0 0 0 Tower Park Trail/Ansborou h Ave Sidewalk. 50,000 .0 0 Sidewalk Infill Project 0 0 .0 Northeast Industrial.Park 0 500,000 200,00E 200,0.00 200,000. ;L f '. Additional Reduction Revised Total 363-,00 1 } 2010-2014 CIP Second Revision 01-21-09 Revised Total 63,000 2010-2014 CIP Second Revision 01-21-09 a 6CP-3 81 t x�y wil Flood Control Improvements 50,000 50,000 50,000 82 Storm Sewer Replacements 0 50,000 0 83 Cloverdale Acres/Outlet Storm Sewer 0 0 0 52 Sidewalk Repair 50,000 50,000 50,000 167 Clark Street Drainage Improvements 430,000 430,000. 0 75 Lower. Sink Creek Improvements 0 0 0 16 Bikeway Maintenance 50,000 50,000 50,000 24 Storm Water Management(Quality) 0 40,000 0 ;. 80 Allen Hospital Area Storm Water Improvements 50,000 0 0 99 Virden Creek Tributary Improvements 400,000 500,000 400,000 154 E 4th St & Ralston Rd?aving 230,000. 150,000 0 124 14th St Bride Walkwa Canopy Repairs & Painting 0 0 0 193 IBridge Inspections' 25,000 25,000 25,000 194 US 63 Improvements - Design/Construction Match 0 463,000 0 .195. US 63 Improvements - Enhancements 100% Const 01 0 .0 77 Kimball Ave Traffic Study and; Im tovements 0 10,000 10,000 .. 69 Hammond Ave Paving 0 0 0 173 Pavement Management Software Upgrades. 0 8,000 0 192 CAD U rades 0 .. 30,000 .0 2010-2014 CIP Second Revision 01-21-09 rn O N O C O .N Q.' � 3 _d U 0 N O O • N 21 Relocation of Fire Station #5 0 0 0 29 Station #5 Apparatus Bay Door Enlargement 0 30,000 28,000 155 Engine 305 Replacement 500,000 600,000 600,000 156 E— and Uniforms 40,000 25,000 25,000 30 Replacement of 75' Quint Fire Engine 0 0 0 170 Replacement of Medic 338 0 0 0 26 84 108. BOOM Replacement of Self Contained Breathing App. Repair of Aerial 311 Office Furnishings and E ui ment 50,000 0 0 80,000 70,000. 35,000 75,000 69,000 0 Additional Reduction g3ggg Revised Total !797,8A0 2010-2014 CIP Second Revision 01-21-09 ECP-/ ECP- / 2010-2014 CIP Second Revision 01-21-05 60>-`f Additional Reduction Revised Total 2010-2014 CIP Second Revision 01-21-09 IF .Gc..P- 3 e C,P- r Gc P- ig 3Ccp- f GG p- 3 114 1 LhO 4mergency Li htbars 10 116 113ody Armor Replacement 15 117 Weapon Replacement Program 10 118 Office Equipment and Furniture Replacement 7 161 Copy Machine Replacement 10 158 Police Information System program 100 159 In Car AudioNideo Cameras 10 160 Radar Units - 2 Hand held, 2 Mobile 13. 129 Police Training Center Unarades 5. 1 Additional Reduction Revised Total 30,000 10,000 42,000 42,000 10,000 9,000 30,000 0 0 0 150,000. 100,000 42,000 42,000 12,000 12,000 5,000 5,000 9,000 9,000 20,000 5,000 4-,M �439ee . 2010-2014 CI Second Revision 01-21-09 4 J -Pll$ zx.'A:� Additional Reduction 24"N Revised Total 368,400 2010-2014 CIP Second Revision 01-21-09 l FCp-r F-, � �� a r'►. �c , 56 Traffic Signal Im rovements 20,000 30,000 30,000 60 Parkin Meter Replacement 50,000 95,000 50,000 130 Street Light Improvements 5,000 15,000 15,000 131 Downtown Lighting 3,600 5,000 3,600 162 Street Sign Upgrades 12,000 43,000 23,000 163 LED Replacement Program 60,000. 0 0 68 Traffic Communications Infrastructure 40,000 3.0,000 20,000 73 Seed Hums 5,000 9,000 9,000 102 Video MonitoringSys. San Marnan/Crossroads Area 25,000 25,000 25,000 175 Traffic Sgety Awareness Cam ai n 12,400. 12,400 12,400 i 178 Broadway & Parker Pro'ect 55,000 55,000 10;000 181 Traffic Safe Improvement Pro'ects 40,000 30,000 30,000 . 179 Hammond Ridgeway&Pro'ect 0 70,000 70,000 111 Central Garage Building Renovation 50,000 0 p 51 Park Avenue Lane Configuration p 0 100 Com uter & GPS%GIS Software Program 0 20,000 0 20,000 20 Drive Safe Cedar Valley Program 0 5,000 5,000 32 Reduce Red Light RunningInitiative 10,000 5,000 5,000 105 O ticom (Emergency Vehicle Pre -Em tion 0 17,OOOF 0 143 TSFG/Franklin & E 5th St Project 0 23,000 0 177 TSFG/San Marnan & La Porte Rd Project 0 33,000 p 119 TSFG/218 Off Ramp & US 63 Project `I'SFG/US63 0 17,000 14,000 25 & Universi -Ave Project 0 13.,000 10,000 38 TSFG/Universi Ave & Progress Ave Project 0 24,000 16,400 46 TSFG/W 4th St & Fletcher Ave Pro'ect 0 32,000 0 d 4 y T4i� ax.%SieS9��:" ¢,s .`I; k�` ..'sstdfinn x_ o n +' ti.nri.ut. -Pll$ zx.'A:� Additional Reduction 24"N Revised Total 368,400 2010-2014 CIP Second Revision 01-21-09 l FCp-r 78 Northwest Interceptor Sewer 1,000,000 200,000 151 Plant Effluent Disinfection 2,500,000 2,500,000 1,500,000 SAGR Treatment System MidPort 0 0 2,500,000 191 Storm Water Bypass Treatment 0 141 Titus Street'Pump Station 0 0 144 Aeration Basin Renovations 400,000' 400,000 139 9th Street Corridor Relief Sewer 0 0 142 East/West Side Interce tors 0 0 171 Demolition of Unused Plant Structures 0 300,000 176 Lift Station Rehabilitation 0 0 137 Addition of 3rd Filter-.Press/Sludge Dewatering Bldg 0 0 153 Easton Avenue Elevation 0 0 164 Virginia Street Sanitary Pump Station Rehabilitation 0 250,000 174 Hackett Road Force Main 0 750,000 150 lBackup Generation for Lift Stations 0 115,000 Collection System Improvements - Manhole Rehab 19.4 CTS A la 631m rovements 0 , 358,000 2010-2014 C!P Second Revision 01-21-09 ] 6c P- f