HomeMy WebLinkAbout24. Telecom Board Agenda Packet - December 11, 2023 - Special SessionWaterloo
FIBER
BOARD
MEMBERS
Andrew
Van Fleet
Board Chair
Theodore
Batemon
Ritch
Kurtenbach
Mike
Young
Amy
Wienands
City Council
Liaison:
Rob
Nichols
WATERLOO
Telecommunications Utility Board of Trustees
December 11, 2023
City Clerk's Office
10:00 a.m.
1. Roll call.
2. Approval of the agenda, as presented.
3. Public Hearing to adopt 2024 Budget.
3.1. Motion to open public hearing and receive and file proof of
publication of notice of said hearing.
3.2. Motion to close the public hearing.
3.3. Resolution adopting the budget for calendar year ending December
31, 2024.
4. Motion approving purchase of OTDR from VeEX, Inc., in the amount of
$16,120.00.
5. Motion approving Change Order No. CR-2023-006 with ITG
Communications, fora net increase of $9,141.59, in conjunction with the
Construction of a Backbone and Fiber -To -The -Premise Project, Contract No.
1088.
6. Adjourn.
Kelley Felchle
Board Secretary
Aug-14
Department of Management
ADOPTED BUDGET SUMMARY
Waterloo Telecommuniations Utility
NAME OF ENTERPRISE
(specify budget years)
REVENUES & OTHER FINANCING SOURCES
CALENDAR
(specify fiscal or calendar year budget)
Budget
2024
YEAR 2024
Re -Estimated
2023
Actual
2023
Use of Money and Property (line 398)
241
0
271
0
301
0
Charges for Services (line 414)
243
530,511
273
0
303
0
Miscellaneous (line 416)
245
0
275
0
305
0
Operating Transfers In (line 417)
247
0
277
0
307
0
Proceeds of Long Term Debt (line418)
248
31,627,664
278
0
308
0
Proceeds of Fixed Asset Sales (line 419)
249
0
279
0
309
0
Total Revenues & Other Financing Sources
250
32,158,175
280
0
310
0
EXPENDITURES & TRANSFERS OUT
Expenditures (line 386)
255
31,628,529
285
0
315
0
Transfers Out (line 387)
259
0
289
0
319
0
Total Expenditures & Transfers Out
260
31,628,529
290
0
320
0
Excess of Revenues & Other Sources
Over (Under) Expenditures & Transfers Out
261
529,646
291
0
321
0
BEGINNING Fund Balance (line 390)
262
0
292
0
322
0
ENDING Fund Balance (line 388)
263
529,646
293
0
323
0
Waterloo Fiber
Ian Crowther -Green
625 Glenwood St.
Waterloo, IA 50703
Quotation
Phone: 319-529-4489
Fax:
Email: ian.crowther-green@waterloofiber.com
Contact Email
Phone
Quote No. Date
Kipp Botner
kbotner@veexinc.com
317-363-8916
102023VeEX0
Incl. FX120 Chassis/Battery Pack, AC Adaptor/Power Cord, OTG Cable microUSB to USB, Carrying Case, 1-Year Warranty Card.
10/20/23
Part Number Description
Quantity
Unit Price Ext. Price
Z06-05-055P
Z66-00-106G
499-05-072
499-05-879
CO2-00-042G
Z06-99-120P
Z66-00-082G
Z66-00-082G
Z66-00-229P
F05-00-063G
FX120
FX120 PON Analyzer and Multi -Gig Service Test Set,
1270/1310//1490/1577nm, Fixed SC/APC
WiFi and Bluetooth for Remote Control and File Transfer
Advanced Management (Enables the test set to
upload/download results and profiles from R-Server web,
requires R-Server package Z88-00-007P)
V-Test/V-Perf Line Rate HTTP Throughput up to 10GE
Advanced Carrying Pouch (recommended for FX120)
OPX BOXe
OPX-BOXe, 1310/1550//1625nm(F) 36/34//38dB (VFL not
supported)
Fixed SCAPC Connector (ASC)
Fixed SCAPC Connector (ASC)
OPX-BOXe BT/WiFi Hardware Option
Fiber Launch Reel*, SM 9/125um G.652.D Fiber with SC/APC
to SC/APC Connector, 100 meters
2 $3,245.00
2 Included
2 Included
$6,490.00
Included
Included
2 Included Included
2 Included Included
2 $2,790.00 $5,580.00
2 Included Included
2 Included Included
2 Included Included
2 Included Included
Stand Alone OTDR
Z06-05-083P FX150+, (S) 1310/1550//1625nm(F) 40/38//39dB 1 $4,050.00 $4,050.00
Z66-00-336P Light Source, shares optical connector with OTDR port 1 Included Included
Z66-00-155G High Power (CATV) OPM, +25dBm to-50dBm, incl. SC 1 Included Included
adaptor
Z66-00-106G WiFi and Bluetooth for Remote Control and File Transfer 1 Included Included
499-05-638 V-Scout Link Mapper 1 Included Included
Z66-00-116G Universal 2.5mm Interface (Keyed*) - APC Polish, with Dust 1 Included Included
Cap
F99-00-177G SC/APC Adaptor for Universal Interface (Keyed*) 2 Included Included
Subtotal $16,120.00
- A 25% restocking fee may apply to cancelled orders.
- This quotation is valid for 30 days from the date listed above.
Please remit Purchase Orders to:
2827 Lakeview Court, Fremont, CA 94538 USA
Tel: +1-510-651-0500 Fax: +1-510-651-0505
https://www.veexinc.com, orders@veexinc.com
(c)2006-2023 VeEX Inc, VeEX, VePAL are registered trademarks of VeEX Inc.
Specifications on this document are subject to change without notice.
All prices are EXW Factory in USD, exclude taxes, shipping, duties, other fees and are subject to change without notice.
Change Order Request
Change r er a
Retainage
CITY OF
�J��TERLOO rNTRUST
SOLUTIONS GROUP
Magellan
Community
Design/Engineering
No
ofOpportunity
Will Be Subject To The Withholdings and Release Set Forth In The
' . ntract Sections 6.2(f)(i) an)
Change Order Name:
CR-2023-0006
.• rder Cost $9,141.59
ITG
equest Date: 12/5/2023
Construction Contractor Name (Attn)
Michael Regan Requested By: Client/Owner
PM Broadband Implementation
Magellan Project Manager:
Client/Owner (Attu)
City of Waterloo/Waterloo
Fiber/Eric Lage
Magellan Sign -Off Gene Allred
Director of Construction
NWange
Reques
Description of Change (include location)
The following Change Order has been created to account for additional labor and material to run
approximately 260 of conduit and fiber into Fire Station 6. Labor & material highlighted int YELLOW
should be as part of the Scope of Work. The pricing was included in the original BOM and therefore, the Unit
Price is $0 for those line items below.
Reason for Change
Waterloo Fiber will be utilizing Fire Station 6 to house the necessary equipment to turn up Friendlies by the
end of this year. Waterloo Fiber is partnering up with CFU to provide data services temporarily until they
have their shelter completed early next year.
Material & Labor pricing has been provided by ITG Communication.
Material Submittals/ Specifications
Itemized Breakdown of Work
Quantity Unit Price
Location
Work Order #
Description
Amount
w
Underground - Buried Labor
Trench (6) 2" SCH-40 Conduit
160
$ 20.25
1
$ 3,240.00
Underground - Buried Labor
Trench (2) 1.25" HDPE
100
$ 10.00
$ 1,000.00
Underground - Buried Labor
Insta11 2" SCH-80 Conduit vertical and attach to building
4
$ 40.00
$ 160.00
Underground - Buried Labor
Install Hammond aluminum box on POP (Includes cutting back of box
and SCH-80 couplers)
1
$ 300.00
$ 300.00
Underground - Buried Labor
Install Muletape in New Conduit-->[FTJ
260
$ -
$ -
Underground - Buried Labor
Install #12 AWG Insulated Tracer Wire-->[LF]
260
$ -
$ -
Underground - Buried Labor
Insta11 5/8"x8' Copper Clad Ground Rod --AEA]
1
$ 52.00
$ 52.00
Underground - Buried Labor
Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top with
Test Station -->[EA]
3
$ 65.00
$ 195.00
Underground - Buried Labor
Installation, Underground Fiber Cable - Including Slack (Regular Loose
Tube Fiber)-->[LF]
500
$ 1.20
$ 600.00
Underground - Buried Labor
Installation, Extra Large Vault 48" x 60"-->[EA]
1
$ 540.00
$ 540.00
Underground - Buried Labor
Directional Bore (0) 1", (0) 2", (2)1.25"-->[LF]
-105
$ 13.75
$ (1,443.75)
Underground - Buried Labor
Directional Bore (0)1", (4) 2", (0) 1.25" -->[LF]
-279
$ 18.15
$ (5,063.85)
Splicing Labor
Install New Splice Case & Prep Cable -->[EA]
1
$ 200.00
$ 200.00
Splicing Labor
Splicing, Fusion, Single Fiber -->[EA]
24
$ 25.00
$ 600.00
Splicing Labor
Splicing Fusion, Single fiber Pigtail at panel -->[EA]
24
$ 25.00
$ 600.00
Splicing Labor
Testing, OTDR, Bi-Directional, Power Meter Testing -->[EA]
24
$ 1.25
$ 30.00
Patch Panels & Cabinets Labor
Install rack mounted patch panel (Any Size) and tails -->[EA]
1
$ 115.00
_
$ 115.00
Patch Panels & Cabinets Labor
Install 7ft Rack for patch panels -->[EA]
1
$ 400.00
$ 400.00
General Labor
Pull fiber through building -->[FT]
100
$ -
$ -
General Labor
4" Core Bore -->[EA]
1
$ -
$ -
General Labor
2" Building Riser with LB - Up to 10'-->[EA]
2
$ -
$ -
$ -
$
f•f
CR Labor Subtotal
$ 1,524.40
Materials
Fiber Material
12 CT Fiber Cable -->[FT]
500
$ 0.33
$ 165.00
Underground Material
1.25" HDPE Roll Conduit, Orange - SDR 11-->[FT]
200
$ -
$ -
Underground Material
Mule Tape -->[FT]
260
$ -
$ -
Underground Material
#12 AWG Solid Thhn Insulated Tracer Wire -->[FT]
260
$ -
$ -
Underground Material
5/8"x8' Copper Clad Ground Rod -->[EA]
1
$ 16.24
$ 16.24
Underground Material
Extra Large Vault 48" x 60" (Split Lid) -->[EA]
1
$ 2,270.43
$ 2,270.43
Underground Material
3.5" Dia PVC Round Locate Posts with Orange "Top Hat", 8 ft. in length
with shorting straps -->[EA]
1
$ 31.55
$ 31.55
Underground Material
2" SCH-80 (10' sticks cost per foot)
80
$ 3.76
$ 300.80
Underground Material
2" SCH-80 Sweep
4
$ 18.11
$ 72.44
Underground Material
2" SCH-40 (10' sticks cost per foot)
1,200
$ 2.13
$ 2,556.00
Underground Material
2" SCH-40 Sweep
6
$ 18.46
$ 110.76
Underground Material
2" SCH-40 45 degree
12
$ 21.54
$ 258.48
Underground Material
Hammond aluminum box
1
$ 1,411.76
$ 1,411.76
Underground Material
2" HDPE Roll Conduit, Orange - SDR 11-->[FT]
-1,116
$ 1.00
$ (1,116.00)
Closure Material
FOSC 450 D Closure -->[EA]
1
$ 336.06
$ 336.06
Closure Material
D Size splice Tray -->[EA]
1
$ 25.91
$ 25.91
Closure Material
Slack Basket for D-Gel Closure -->[EA]
1
$ 22.13
$ 22.13
Patch Panels & Cabinets Material
12 port rack mount panel -->[EA]
1
$ 226.29
$ 226.29
Patch Panels & Cabinets Material
7ft Rack for patch panels -->[EA]
1
$ 929.34
$ 929.34
$ -
$ -
CR Materials Subtotal
$
***
TOTAL CR COST
9,141.59
Magellan Sign -Off
Print Name / Title:
Signature:
Date:
Gene Allred
Director of Construction
yeot.2.,elazd
12/6/2023
7Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Bryan Siebenberg
12/6/23
VP of Operations
Print Name / Title:
Signature:
Date:
**End**
Jamie Knutson
City Engineer