Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Vieth Construction - CO #10 - FY22 Sullivan Bros Plaza Reno, Cont. No. 1069 - 12.18.2023
AIA Document G701® - 2017 Change Order PROJECT: (Name and address) City of Waterloo Sullivan Brothers Plaza Renovation, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Name and address) I & S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION: Change Order Number: 010R1 Date: November 17, 2023 CONTRACTOR: (Name and address) Vieth Construction Corporation 6419 Nordic Drive Cedar Falls, IA 50613 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Additional 4" topping slab and wire mesh, additional landscaping and additional electrical - ADD $7,428.85 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be unchanged 1,692,500.00 $ 89,214.96 1,781,714.96 $ 7,428.85 1,789,143.81 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & S Group, Inc. (ISG) AR CT (Firm name) SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE November 17, 2023 DATE Vieth Construction Corporation City of Waterloo CONTRACTOR (Firm name) OWNER (Firm name) 1 Quentin SIGNATURE % SIGNATURE Tony Vieth, President Quentin Hart, Mayor PRINTED NA E AND TITLE DATE SIGNED PRINTED NAME AND TITLE 12/18/2023 DATE AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 16:03:03 ET on 11/17/2023 under Order No.3104238596 which expires on 05/15/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA48)