HomeMy WebLinkAboutAECOM - Supp Agmnt No. 2 - FY24 LaPorte Rd Improvements, Cont. No. 1016 - 1.16.2024AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA LA PORTE ROAD/HESS ROAD CORRIDOR IMPROVEMENTS SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated October 28, 2019, for preliminary and final design of improvements to the La Porte Road / Hess Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated August 2, 2021 for Phase IIA - Final Design the La Porte Road / Hess Road Corridor Improvements Project from Shaulis Road to south of San Marnan Drive; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 Phase IIB - Final Design the La Porte Road / Hess Road Corridor Improvements Project from just north of Grimm Street to the Bopp Street intersection. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION This project consists of improvements to the La Porte Road Corridor from just north of Grimm Street to the Bopp Street intersection, including modifications to the existing traffic operations, safety improvements, access management changes, bike/pedestrian facilities and corridor aesthetics. The original design services have been split into three phases. Phase I - Preliminary Design Phase II - Final Design Phase III - Construction -Related Services This agreement is for Phase IIB — Additional Final Design Services, which includes additional final design services on the La Porte Road Corridor from Shaulis Road to Bopp Street, which includes section from Grimm Street to Bopp Street. The final design services include grading, paving, storm and sanitary sewers, box culvert modifications, access management modifications, fiber, right-of- way activities and RAISE grant assistance. II. SCOPE OF SERVICES PHASE 1 — ADDITIONAL FINAL DESIGN SERVICES Division I - Final Design (Eligible SWAP Funding) Data Collection — Task 1-2 Task 1 — Topographical Survey. This task includes additional field surveys, property surveys and utility calls, as required, to complete the final design of the project outside of the original project limits including but not limited to Highway 218 box culvert, Southtown and Witham properties, Highway 218 right-of-way and ditching and Highway 218 trail extension to 18th Street, in order to supplement the initial topographical survey completed with study. AECOM Page 2 Task 2 — Base Mapping. This task includes development of a base map file in MicroStation format for use in the development of the final design. Final Design - Tasks 3-10 The following tasks lead to the completion and submittal of final grading, drainage and paving construction plans for Iowa DOT bid letting for Phase 1. The original Phase 1 and 2 limits included in Phase IIA — Final Design from Shaulis Road to Grimm Street. Due to RAISE Grant funding, the limits were extended to Bopp Street (Phase IIB). The 60% plans were completed based on previously developed preliminary plans as part of the Phase IIA — Final Design. The final construction plans were modified based on design changes to project limits, lane and median width and design speed requiring substantial changes to the typical cross sections, storm sewer, plan and profile sheets. Two additional intersections and additional turn lanes were created for the development north of Highway 20 and La Porte Road. The new fiber extension and corresponding Special Provisions will also be included. The following tasks are included: Task 3 — Typical Sections and Details Revisions Task 4 — Plan and Profile Sheets Revisions a. Mainline La Porte — Grimm Street to Bopp Street Limit Extension and Typical Cross Section Modification b. Additional Side Road Connections Task 5 — Additional Intersection Details & Design for Future Road Connections Task 6 — Additional Storm Sewer Design (Mainline North of Grimm Street, Bopp Street North of Southtown and Highway 218 Box Culvert) Task 7 — Fiber Sheets Task 8 — Special Details for Drainage Ditches & Highway 218 Culvert Modifications Task 9 — Cross Sections Revisions Task 10 — Special Provisions (Fiber) Right -of -Way Activities - Tasks 11-13. The following additional tasks are necessary for final right- of-way acquisition necessary for the federal aid process. The City of Waterloo will complete the property acquisitions. For the purpose of estimating staff hours, a total of 14 temporary and permanent easements and 4 partial acquisitions were estimated to be staked for acquisition negotiations. The following tasks are included: Task 11 — Easement and Right -of -Way Staking for Property Owners Task 12 — Coordination with Right -of -Way Acquisition Staff Task 13 — Federal Coordination with Iowa DOT Public Meetings - Tasks 14-15. These tasks include preparation for and attendance at public informational activities, as needed, for this project including for right-of-way acquisition assistance. These activities will include one public informational meeting, presentations at City Council meetings or work sessions, and up to ten meetings with individual property owners or neighborhood groups. The following tasks are included: Task 14 — Public Informational Meeting (2) Task 15 — Council Meetings (1) Project Administration, Permitting and Meetings - Tasks 16-20. These tasks include project administration, coordination and meetings for the additional design of Phase 1. The recent Canadian National (CN) purchase of the railway along Highway 218 will require additional coordination with the CN for approval of the trail extension. The following identifies tasks leading to the completion of project administration, meetings and coordination during the design phase of the AECOM project. Task 16 — Presentation Materials Task 17 — CN Railroad Company Coordination Task 18 — Project Meetings Task 19 — Iowa DOT, & FHWA Coordination Task 20 — Project Administration Page 3 Division 11— Local Funding RAISE Grant Assistance - Tasks 21-22 This Scope of Work includes tasks for the coordination and assist with the approval of the US DOT RAISE Grant Agreement. It includes the following tasks to be completed by ATS: Task 21 — Draft and Final Agreement. ATS will assist in preparation of draft and final RAISE Grant Agreement for submittal to Iowa DOT and FHWA for final approval by US DOT. Task 22 — Coordination with FHWA and Iowa DOT. ATS will assist in coordination with the Iowa DOT and FHWA on the RAISE Grant Agreement. ATS will lead and/or assist with meetings for the RAISE Grant Agreement. This task includes an estimated 4 meetings. III. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article VI of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for supplemental agreement is $147,300.00, as stated below and shown in attached documents, shall be integrated with the fees in the original agreement and Supplemental Agreement 1. Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Original Agreement S.A. No. 1 S.A. No. 2 Division I Division I Total this and Division I (SWAP) (SWAP) (SWAP) Division I $305,700.00 $736,100.00 $113,900.00 $1,155,700.00 26,200.00 69,800.00 14,500.00 110,500.00 21,200.00 54,700.00 11,400.00 87,300.00 2,900.00 8,200.00 0.00 11,100.00 $356,000.00 $868,800.00 $139,800.00 $1,364,600.00 Original Agreement S.A. No. 1 S.A. No. 2 Total Division II Division II Division II Division II (Local) (Local) (Local) (Local) $160,400.00 $101,500.00 $6,100.00 $268,000.00 8,600.00 13,000.00 800.00 22,400.00 6,800.00 10,200.00 600.00 17,600.00 5,500.00 0.00 0.00 5,500.00 $181,300.00 $124,700.00 $7,500.00 $313,500.00 AECOM Page 4 IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated October 28, 2019. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM By: �2ueniin 9irr-E � o By: Printed Name: Title: Date: 461 Quentin Hart Printed Name: Douglas W. Schindel, P.E Manor 1/16/2024 IOWA DEPARTMENT OF TRANSPORTATION Accepted for SWAP Authorization* Title: Vice President Date: January 10, 2024 By: Printed Name: Title: Date: *The Iowa DOT is not a party to this agreement. However, by signing this agreement, the Iowa DOT is indicating the work proposed under this agreement is acceptable for SWAP funds. L:\Secure_DCS\Administration\AGREE\SUPPLE\SA2 WAT La Porte Rd Hess Rd Corridor Improvements.docx La Porte Road/Hess Road - Shaulis Road to San Marnan Drive SA No. 2 - Final Design City of Waterloo, Iowa COST ANALYSIS - Division I - SWAP I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.1 Senior Professional 20 $105.26 $2,105.20 2.3 Project Professional 122 $84.92 $10,360.24 3.1 Staff Professional 8 $66.12 $528.96 3.2 Staff Professional 178 $61.18 $10,890.04 4.3 Professional 276 $41.35 $11,412.60 4.5 Professional 74 $34.66 $2,564.84 5.3 CADD Operator II 188 $34.34 $6,455.92 8.1 Technician 12 $38.44 $461.28 8.4 Technician 118 $27.08 $3,195.44 9.1 Project Support 48 $40.53 $1,945.44 $49,919.96 1044 II. Payroll Burden and Overhead Provisional Costs 123.50% $61,651.15 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 500 0.67 335.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 1000 0.06 60.00 Color Copies 1000 0.22 220.00 Total Station Survey Equip. 40 15.00 600.00 GPS Survey Equipment 40 15.00 600.00 Miscellaneous, Other 500.00 IV. AECOM Estimated Actual Costs V. Subcontract Expense VI. Estimated Actual Costs VII. Fixed Fee (13%) VIII. Contingency (10%) $11,390.00 AECOM Rounded $2,315.00 $113,886.11 $113, 900.00 $0.00 $113, 900.00 $14,504.24 Rounded $14,500.00 Rounded $11,400.00 $11,400.00 IX. Maximum Amount Payable $139,800.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive SA No. 2 - Final Design City of Waterloo, Iowa COST ANALYSIS - Division II - LOCAL I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.1 Senior Professional 10 $105.26 $1,052.60 2.3 Project Professional 20 $84.92 $1,698.40 3.1 Staff Professional 0 $66.12 $0.00 3.2 Staff Professional 0 $61.18 $0.00 4.3 Professional 0 $41.35 $0.00 4.5 Professional 0 $34.66 $0.00 5.3 CADD Operator II 0 $34.34 $0.00 8.1 Technician 0 $38.44 $0.00 8.4 Technician 0 $27.08 $0.00 9.1 Project Support 0 $40.53 $0.00 $2,751.00 30 II. Payroll Burden and Overhead Provisional Costs 123.50% $3,397.49 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 0 0.67 0.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 0 0.06 0.00 Color Copies 0 0.22 0.00 Total Station Survey Equip. 0 15.00 0.00 GPS Survey Equipment 0 15.00 0.00 Miscellaneous, Other 0.00 IV. AECOM Estimated Actual Costs V. Subcontract Expense VI. Estimated Actual Costs VII. Fixed Fee (13%) VIII. Contingency (10%) $610.00 AECOM Rounded $0.00 $6,148.49 $6,100.00 $0.00 $6,100.00 $799.30 Rounded $800.00 Rounded $600.00 $600.00 IX. Maximum Amount Payable $7,500.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive SA No. 2 - Final Design City of Waterloo, Iowa AECOM Technical Services, Inc. Staff Hour Estimate Description of Work 1.1 Senior Prof 2.3 Project Prof 3.1 Staff Prof 3.2 Staff Prof 4.3 Prof 4.5 Prof 5.3 CADD Op II 8.1 Technician 8.4 Technician 9.1 Project Support Total Division I - SWAP Funding 1111 Data Collection 1 Topograhical Survey _ 2 Base Mapping i Final Design I ■ 3 Typical Cross Sections and Details _ 48 100 24 90 8 12 88 238 124 10 2 4 Plan and Profile Sheets Revisions 20 40 20 30 110 5 Additional Intersection Details & Design for Future Road Connections 2 40 30 72 6 Additional Storm Sewer Design 2 8 40 10 30 90 7 Fiber Sheets 2 20 10 32 8 Speical Details for Drainage Dietches & Hwy 218 Culvert Modifications 2 40 10 52 9 Cross Section Revisions 2 20 22 10 Special Provisions (Fiber) 12 8 20 Right -of -Way Activities _ 11 Easement and ROW Staking for Property Owners 30 30 60 12 Coordination w/ROW Acquisition Staff 10 20 30 13 Federal Coodination w/Iowa DOT ROW 10 10 20 Public Meetings 14 Public Information Meetings - ROW 15 Council Meeting Project Administration, Pi — — .. 16 Presentation Material 10 6 2 J. J. 12 4 1 6 1... ® ®.... _....... 8 22 10 16 17 CN Railroad Coordination 4 12 6 22 18 Project Meetings 6 6 12 8 32 19 Iowa DOT & FHWA Coodination 10 6 16 20 Project Administration 10 12 24 46 Division I - SWAP Funding - Total 178 76 74 118 48 1, • Division 11- LOCAL Funding -79 Grant Assistance MI W 21 Draft And Final Agreement 6 16 22 22 Coordination w/FHWA and Iowa DOT 4 4 8 rision 11- LOCAL Fundin - Total 1 r r TOTAL HOURS 30 142 8 178 276 74 188 12 118 48 1,074