Loading...
HomeMy WebLinkAboutAECOM - Supp Agmnt No. 2 - Sunnyside Creek Improvements, Cont. No. 1062 - 1.16.2024AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA CONTRACT NO. 1062 SUNNYSIDE CREEK IMPROVEMENTS WET DETENTION POND AND CHANNEL STABILIZATION PROJECT SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated March 7, 2022, for design of a wet detention pond located between Highway 20 and West San Marnan drive; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated May 15, 2023 for updated modeling, development of preliminary and final platting, and temporary/permanent easements for the proposed wet detention pond and channel improvement areas. WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 for the development and submittal of the full Iowa Department of Agriculture and Land Stewardship (IDALS) Water Quality Initiative Urban Conservation Project Grant Application. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION The Sunnyside Creek Improvement Project involves construction of a wet detention pond located between Highway 20 and West San Marnan Drive, generally centered on the main channel of Sunnyside Creek. The project also includes bank channel stabilization of approximately 1,050 feet of the existing Sunnyside Creek channel located downstream of the proposed basin (between San Marnan Drive and Westchester Drive). According to the Black Hawk County Flood Insurance Study (FIS) and the effective Flood Insurance Rate Maps (FIRMs) for Black Hawk County, the project is located in a Zone A floodplain, which means the 100-year floodplain was developed based on approximate methods and a detailed analysis resulting in base flood elevation determinations has not been completed. As part of this project, a detailed analysis will be completed for the wet detention basin design and required regulatory permitting. This supplemental agreement will include development of the full grant application package for the IDALS Water Quality Initiative for Urban Conservation Projects. AECOM and the City of Waterloo submitted a pre -application package for the above referenced grant application on November 16, 2023, and was notified on December 15, 2023 that the pre -application package was selected to move forward with the full application. II. SCOPE OF SERVICES The Scope of Services for this supplemental agreement will encompass and include detailed work, services, materials, equipment, personnel and supplies necessary to complete the full grant application package to IDALS on or before Friday, February 9, 2024 at 4:30 pm. AECOM Page 2 The Scope of Services is further defined as follows: Grant Application Development and Submittal (Tasks 1-3) The following identifies tasks leading to the completion of the Grant Application development and submittal. Task 1 - Develop Draft Grant Application per IDALS requirements Task 2 - Submit Draft Grant Application to the City of Waterloo and Regional Urban Conservationist from the Iowa Department of Agriculture and Land Stewardship for Review and Comment Task 3 - Final Application Revisions and Submittal III. COMPENSATION Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in the original agreement. The estimated fee is Six Thousand Five Hundred Dollars ($6,500.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated March 7, 2022. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM By: Quentin By: v 4ePZPI Printed Name: Quentin Hart Printed Name: Douglas W. Schindel, P.E Title: Mayor Title: Vice President 1/16/2024 Date: Date: January 10, 2024 L:\Secure_DCS\Administration\AGREE\SUPPLE\SA2 WAT Sunnyside Creek Improvements.docx