Loading...
HomeMy WebLinkAboutEntrust Solutions Group (Magellan) - Cont. No. 8 - 1.16.2024Change Order Request Change Order CITY OF ENTRUST kJ �TERLOO SOLUTIONS GROUP Communit lesign/Engineering fO Mage//an y Opportunity Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) (Change Order Cost: $38,393.08 Retainage No Change Order Name: CR-2023-0008 Construction Contractor Name (Attu) ITG • - 12/19/2023 Magellan Project Manager: Michael Regan PM Broadband Implementation Requested By: Construction Contractor Client/Owner (Attn) City of Waterloo/Waterloo Fiber Magellan Sign -Off Gene Allred Director of Construction Description of Change (include location) The following Change Order has been created to account for labor & material costs associated with swapping out CommScope CSC100 micro enclosures with CommScope CSC150 micro enclosures. Reason for Change There is a space -constraint issue utilizing the CommScope CSC 100 micro enclosures for the splicing of 96-count fiber cable. Waterloo Fiber, Contractor & CommScope performed mock ups that resulted in fiber cable breakage. Waterloo Fiber & Contractor confirmed swapping out the Commscope CSC 100 micro enclosures with the CommScope CSC 150 micro enclosures for occurrences with the 96-count fiber cable splices; there are 1,300 instances where this applies. Other material pricing impacted with this change are the FOSC 450 B Closures, Splice Trays and Slack Baskets. Material Submittals/ Specifications Material pricing and quantities have been provided by ITG. Original BOM quantities and pricing have been used to estimate costs. Location Work Order # Labor Itemized Breakdown of Work Description Qua . - $ - CR Labor Subtotal $ - $ (80,939.74) Materials Closures Material FOSC 450 B Closure -->[EA] -287 $ 282.02 Closures Material Splice Tray for B-Gel Closure (SM12)-->[EA] -287 $ 17.31 $ (4,967.97) Closures Material Slack Basket for B-Gel Closure -->[EA] -71 $ 40.73 $ (2,891.83) Closures Material FOSC 450 B Closure -->[EA] 287 $ 336.06 $ 96,449.22 Closures Material Splice Tray for B-Gel Closure (SM12)-->[EA] 287 $ 25.91 $ 7,436.17 Closures Material Slack Basket for B-Gel Closure -->[EA] 71 $ 22.13 $ 1,571.23 Closures Material Commscope CSC100 Micro Closure -->[EA] -1,300 $ 65.23 $ (84,799.00) Closures Material Commscope CSC150 Micro Closure -->[EA] 1,300 $ 81.95 $ 106,535.00 $ - $ - R Materials TOTAL CR COST Subtotal $ 38,393.0: $ 38,393.08 Approvals Magellan Sign -Off Print Name / Title: Signature: Date: Gene Allred yedf.4. .cMO.d 12/19/2023 Director of Construction Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Bryan Siebenberg VP of Operations 5rt. 12/26/23 Client/Owner (Attn) Print Name / Title: Signature: Date: Quentin Hart, Mayor Qa2/tiln Jl i 1/16/2024 **End** •