HomeMy WebLinkAboutEntrust Solutions Group (Magellan) - Cont. No. 8 - 1.16.2024Change Order Request
Change Order
CITY OF ENTRUST
kJ �TERLOO SOLUTIONS GROUP
Communit
lesign/Engineering
fO Mage//an
y Opportunity
Will Be Subject To The Withholdings and Release Set Forth In The Contract
Sections 6.2(f)(i) and (ii)
(Change Order Cost: $38,393.08
Retainage No
Change Order Name: CR-2023-0008
Construction Contractor Name (Attu) ITG
• - 12/19/2023
Magellan Project Manager: Michael Regan
PM Broadband Implementation
Requested By: Construction Contractor
Client/Owner (Attn)
City of Waterloo/Waterloo Fiber
Magellan Sign -Off Gene Allred
Director of Construction
Description of Change (include location)
The following Change Order has been created to account for labor & material costs associated with swapping out
CommScope CSC100 micro enclosures with CommScope CSC150 micro enclosures.
Reason for Change
There is a space -constraint issue utilizing the CommScope CSC 100 micro enclosures for the splicing of 96-count fiber
cable. Waterloo Fiber, Contractor & CommScope performed mock ups that resulted in fiber cable breakage. Waterloo
Fiber & Contractor confirmed swapping out the Commscope CSC 100 micro enclosures with the CommScope CSC 150
micro enclosures for occurrences with the 96-count fiber cable splices; there are 1,300 instances where this applies.
Other material pricing impacted with this change are the FOSC 450 B Closures, Splice Trays and Slack Baskets.
Material Submittals/ Specifications
Material pricing and quantities have been provided by ITG. Original BOM quantities and pricing have been used to
estimate costs.
Location
Work Order #
Labor
Itemized Breakdown of Work
Description
Qua . -
$ -
CR Labor Subtotal
$ -
$ (80,939.74)
Materials
Closures Material
FOSC 450 B Closure -->[EA]
-287
$ 282.02
Closures Material
Splice Tray for B-Gel Closure (SM12)-->[EA]
-287
$ 17.31
$ (4,967.97)
Closures Material
Slack Basket for B-Gel Closure -->[EA]
-71
$ 40.73
$ (2,891.83)
Closures Material
FOSC 450 B Closure -->[EA]
287
$ 336.06
$ 96,449.22
Closures Material
Splice Tray for B-Gel Closure (SM12)-->[EA]
287
$ 25.91
$ 7,436.17
Closures Material
Slack Basket for B-Gel Closure -->[EA]
71
$ 22.13
$ 1,571.23
Closures Material
Commscope CSC100 Micro Closure -->[EA]
-1,300
$ 65.23
$ (84,799.00)
Closures Material
Commscope CSC150 Micro Closure -->[EA]
1,300
$ 81.95
$ 106,535.00
$ -
$ -
R Materials
TOTAL CR COST
Subtotal
$ 38,393.0:
$ 38,393.08
Approvals
Magellan Sign -Off
Print Name / Title:
Signature:
Date:
Gene Allred
yedf.4. .cMO.d
12/19/2023
Director of Construction
Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Bryan Siebenberg VP of Operations
5rt.
12/26/23
Client/Owner (Attn)
Print Name / Title:
Signature:
Date:
Quentin Hart, Mayor
Qa2/tiln Jl i
1/16/2024
**End**
•