Loading...
HomeMy WebLinkAboutAECOM - PSA - Titus Lift Station Cont. No. 975 - 2.5.2024AECOM AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com TITUS LIFT STATION AND FORCE MAIN PROJECT CITY OF WATERLOO, IOWA CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated September design of the Titus Lift Station and Force Main project. WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 related services for the project. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. Project Description 319-232-6531 tel 319-232-0271 fax Waterloo, Iowa, 24, 2018, for the for construction - The project consists of replacement and construction of a new lift station, force main and gravity sewer at the existing Titus Lift Station site and along the Broadway Street corridor in the northwest portion of the City of Waterloo. The project will improve current overloading of the existing lift station during periods of wet weather and provide capacity to expand the service areas north and northwest of the station. The project provides benefits for economic development and improves flow conditions in a portion of the system which currently experiences overloading during wet - weather flows. The City utilizes a State Revolving Fund (SRF) loan for the project. The construction cost for the project is approximately $6.2 million dollars. ATS will provide construction -related services along with engineering assistance to the City for the SRF process. II. Scope of Services The Scope of Services will encompass and include work, services, materials, equipment, personnel and supplies necessary to provide construction -related services for the project and associated engineering assistance to the City for the SRF process required for the project. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project. Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. AECOM Page 2 Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents and advise the Client of any work that should be corrected or rejected. Task 10. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 11. Facilitate construction progress meetings of project as needed and complete minutes for each meeting. It is anticipated that when construction activities begin, meetings will be bi-weekly. Task 12. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 13. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 14. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 15. Compile Equipment Manufacturer's and Vendors Operation & Maintenance (O&M) material from Contractor and distribute one electronic and two hard copies of O&M manuals to the Client at the completion of the project. Task 16. Coordinate and attend one -day training and start-up sessions by Contractor and equipment manufacturer(s) to orient Client's operating personnel in operation of the facilities. Task 17. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 18. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement. The estimated fee is Five Hundred Ninety -Five Thousand Dollars ($595,000.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated September 24, 2018. AECOM Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By I V, iskik6) Dou•las W. Schindel, P.E. Vice President APPROVED FOR CITY OF WATERLOO: Date January 30, 2024 By: Quetit Date 2/5/2024 Quentin Hart Mayor L:\Secure DCS\Administration\AGREE\SUPPLE\SA1 WAT Titus Lift Station CRS.docx