HomeMy WebLinkAboutFM Controls - CO #1 - HVAC Project - 2.5.2024CHANGE ORDER NO. 1 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Date: January 29, 2024 Project: Improve Terminal Building (Upgrade HVAC System Controls) Owner's Contract No. FAA AIP Project No. 3-19-0094-048 (CARES) Contractor: FM Controls, Inc. Date of Contract Start: April 17, 2023 You are directed to make the following changes in the Contract Documents. Description: ITEM NO. DESCRIPTION UNIT UNIT BID PRICE CHANGE ORDER NO. 1 CHANGE ORDER AMOUNT 3 Replace VAV Value Actuators EA $ 500.00 2 $ 1,000.00 4 Replace VAV Heating Valves EA $ 1,000.00 4 $ 4,000.00 5 Replace VAV Blower Motors EA $ 1,500.00 2 $ 3,000.00 6 Replace AHU Heati ng Valves EA $ 1,500.00 2 $ 3,000.00 7 VAV-Office 211 Strainer Replacement EA $ 850.00 1 $ 850.00 8 Replace AHU-3 Static Pressure Switch EA $ 400.00 1 $ 400.00 9 Replace AHU-3 Economizer Actuator EA $ 850.00 1 $ 850.00 10 Boiler Combustion Air Damper Replacement EA $ 2,580.00 1 $ 2,580.00 11 Troubleshoot AHU-2Air Flow EA $ 500.00 1 $ 500.00 12 Troubleshoot Boiler 1 and 3 EA $ 500.00 1 $ 500.00 TOTALS $ 16, 680.00 Reason for Change Order:. Items 3 through 12 — Miscellaneous maintenance items found during installation of controls system ALO FAA ATP 3-19-0094-048 CO-1 Project No --- 60675091 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 122,390.00 Original: Previous C.O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD): This C.O. (ADD): $ i 6,680.00 This C.O. (ADD): Contract Price with all REVISED: approved Change Orders: $ 139,070.00 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: 3 l Engineer (Authorized Signature) APPROVED: By: Qaettiiii 3lari i smxex � Owner (Authorized Signature) ACCEPTED: By: -:12- January 29, 2024 Date 2/5/2024 Date Contractor (Authorized Signalture) Date ALO FAA ATP 3-19-0094-048 CO- I Project No — 60675091 2