HomeMy WebLinkAboutPeters Construction - CO #1 - WCC - Restroom Reno - 4.1.2024•AlA Document G7O1 - 2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center - Restroom Renovation 233 W 4th Street Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) I&S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: March 8,2024 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road Waterloo, LA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Previous pipe leak in upstairs dressing room walls that have caused mold on the existing hallway wall and metal stud framing. Would remove the existing ceiling, remove mold, demo existing drywall and framing. Install new metal stud framing, drywall, paint, and reinstall exisiting ceiling grid ADD $6,038.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Stun including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be unchanged # 995,697.00 $ 0.00 $ 995,697.00 # 6,038.00 # 1,001,735.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which ease a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I&S Group, Inc. (ISG) Peters Construction Corporation City of Waterloo ARCHITECT (Firm name) CONTRACTOR (Firm name) SIGNATURE Nathan Compton, Architect PRINTED NAME AND TITLE March 8, 2024 DATE SIGNATURE Bradley Best, President Odirm name) le/tun 9-(a DIGITALLY SIGNED satI Ti{l i Hart, Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE ll 4/1/2024 DATE DATE AIA Document G701 — 2017. Copyright ® 1979, 1987, 2000 , 2001 and 2017. All rights reserved. 'The American Institute of Architects,' 'American Institute of Architects,"' AIA," the AIA Logo, and "AIA Contract Documents' are trademarks of The American Institute of Architects. This dacument was produced at 10:11:45 ET on 03/18/2024 under Order No.3104238596 which expires on 05/15/2024. la not for resale, is licensed for one-time use only, and may only be used In accordance with the AIA Contract Documentse Terms of Service. To report copyright violations, e•mall doclnfo@aiacontracts.com. User Notes: (3B9ADA45)