Loading...
HomeMy WebLinkAboutWayne Claassen Engineering - PSA - SA #9 - FY17 Hammond Ave Bridge Cont. No. 922 - 4.1.2024Supplemental Agreement No. 9 to the Hammond Ave. Bridge Replacement Project Professional Service Agreement between the City of Waterloo, Iowa and Wayne Claassen Engineering and Surveying, Inc. PROJECT: Hammond Avenue Bridge Replacement Project TO: Wayne Claassen Engineering and Surveying, Inc. (CES) FROM: City of Waterloo, Iowa You are hereby ordered to make the following changes to the existing Agreement for Professional Services for the Hammond Avenue Bridge Replacement project, dated 10/02/2017 1. Add the following to said existing Agreement: Part III. TERMS AND CONDITIONS Article 1. ENGINEERING SERVICES 1.1 Basic Services - The Engineer agrees to perform professional services in connection with the Project, as set forth below and contained within this Agreement: A. Final Engineering Phase Task 25 Additional hydraulic modeling and exhibits for the completing Iowa DOT Hydraulic Modeling Fonn. This task will be completed by H.R. Green, as a sub - consultant to CBS. Task 26. Additional plan changes to update non structural plans to current Iowa DOT Standards. This task will be completed by CES 2. Settlement for cost of work to be made as follows: Task 25. These tasks increase the Basic Services Amount by $6,500.00. Task 26 This task increases the Basic Services Amount by $2,500.00 The Professional Services Agreement is increased by $9,000 by this Supplemental Agreement 9 to a total of $278,350. Page 1 of 2 3. All other sections of said existing Agreement remain unchanged. CITY OF WATERLOO APPROVED: WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. i Qae t L i a.rriit //��%l/" SIGNED /� BY: BY: Quentin Hart, Mayor of Waterloo William J. Claas en, President ATTEST BY: Kelley Eelchle Kelley Felchle, City Clerk 4/1 /2024 ATTEST BY: Sandra Scheil ".q.(7(0t)f- Date Date Page 2 of 2 •HRGr en0 HR GREEN, INC. PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 6 THIS AMENDMENT, made this 15th day of March 2024 by and between, Wayne Claassen Engineering & Surveying, Inc. the CLIENT, and HR GREEN, INC. (hereafter 'COMPANY"), for professional services concerning: • Hammond Avenue Bridge Over Sink Creek Hydraulic Analysis COMPANY Project Number: 181817 hereby amends -the original Professional Services Agreement dated 4/18/2019 as follows: • The CLIENT and COMPANY agree to amend the Scope of Services of the original Professional Services Agreement and previous amendments as follows: General • • Project Management as necessary to complete the tasks below. Miscellaneous Structural Plan updates • • • • Ressuance of plans with minor edits requested by client. Additional Services associated with CLOMR/LOMR: Additional research and coordination with Iowa DNR, after issuance of CLOMR. (Assuming up to 25 hours) In coneideration for these services, the CLIENT AGREES to adjust the payment for services performed by COMPANY on the following basis: • Per current rate schedule with a maximum fee to be increased by Six Thousand, Five Hundred Dollars ($6,500.00) • The total authorized compensation after this Amendment, including the original Professional Services Agreement and all previous Amendments, is outlined in the table below: Original Agreement Amendment #1 Additional Agreement (2/19/2021) Amendment #2 Amendment #3 CLOMR Permit Fee Amendment #4 Amendment #5 Amendment #6 Change in Agreement Fee Running:Fee Total +$36,500 + $4,100 +$3,600 + $35,800 + $6,500 + $29,800 +$6,000 + $6,500 $12,000 $48,500 $52,600 $56,200 $92,000 $98,500 • $128,300 $134,300 $140,800 • THIS AMENDMENT is subject to all provisions of the original Professional Services Agreement. THIS AMENDMENT, together with the or'ginal Professional Services Agreement and all previous amendments represents the entire and integrated AGREEMENT between the CLIENT and COMPANY. Version2.012172018 Amendment #5 to Professional Services Agreement Hammond Avenue Bridge Over Sink Creek: Hydraulic Analysis 181817 Page 2of2 HRGreen. THIS AMENDMENT executed the day and year written above. Wayne Claassen Engineering & Surveying, Inc. By: "Bill Claassen, • • • • • • • • • • • • • • HR GREEN, INC. • • By• Teresa Stadelmann, PE, Principal • • • • • • • • • • Versionl.0 07012017