Loading...
HomeMy WebLinkAboutFM Controls - CO #2 - HVAC Project 3-19-0094-048 - 4.15.2024CHANGE ORDER NO. 2 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Date: March 13, 2024 Project: Improve Terminal Building (Upgrade HVAC System Controls) Owner's Contract No. FAA AIP Project No. 3-19-0094-048 (CARES) Contractor: FM Controls, Inc. Date of Contract Start: April 17, 2023 You are directed to make the following changes in the Contract Documents. Description: ITEM NO. DESCRIPTION UNIT UNIT BID PRICE CHANGE ORDER NO. 1 CHANGE ORDER AMOUNT 13 Boiler Low Water Cutoff Replacement EA $ 750.00 1 $ 750.00 14 Boiler Pump Relay Replacement EA $ 600.00 1 $ 600.00 15 Replace AHU Flow Control Valve EA $ 1,200.00 1 $ 1,200.00 TOTALS $ 2,550.00 Reason for Change Order: Items 13 through 15 — Miscellaneous maintenance items found during installation of controls system ALO FAA AIP 3-19-0094-048 CO-2 Project No — 60675091 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 122,390.00 Original: Previous C.O.s (ADD): $ 16,680.00 Previous C.O.s (ADD): This C.O. (ADD): $ 2,550.00 This C.O. (ADD): Contract Price with all REVISED: approved Change Orders: $ 141,620.00 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: 3. 1, Engineer (Authorized Signature) APPROVED: By: Quert /c r DIGITALLY SIGNEP L4(31 Date 4/15/2024 Owner (Authorized Signature) Date ACCEPTED: �� By: q/( d`C)'91 Con`t •actor (Authorized Signature) Date ALO FAA AIP 3-19-0094-048 CO-2 Project No — 60675091 2