HomeMy WebLinkAboutFM Controls - CO #2 - HVAC Project 3-19-0094-048 - 4.15.2024CHANGE ORDER NO. 2
Owner: Waterloo Regional Airport, City of Waterloo, Iowa Date: March 13, 2024
Project: Improve Terminal Building (Upgrade HVAC System Controls)
Owner's Contract No. FAA AIP Project No. 3-19-0094-048 (CARES)
Contractor: FM Controls, Inc.
Date of Contract Start: April 17, 2023
You are directed to make the following changes in the Contract Documents. Description:
ITEM
NO.
DESCRIPTION
UNIT
UNIT BID PRICE
CHANGE ORDER
NO. 1
CHANGE ORDER
AMOUNT
13
Boiler Low Water Cutoff Replacement
EA
$ 750.00
1
$ 750.00
14
Boiler Pump Relay Replacement
EA
$ 600.00
1
$ 600.00
15
Replace AHU Flow Control Valve
EA
$ 1,200.00
1
$ 1,200.00
TOTALS
$ 2,550.00
Reason for Change Order:
Items 13 through 15 — Miscellaneous maintenance items found during installation of controls system
ALO FAA AIP 3-19-0094-048
CO-2 Project No — 60675091
1
CONTRACT PRICE
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $ 122,390.00 Original:
Previous C.O.s (ADD): $ 16,680.00 Previous C.O.s (ADD):
This C.O. (ADD): $ 2,550.00 This C.O. (ADD):
Contract Price with all REVISED:
approved Change Orders: $ 141,620.00
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: 3. 1,
Engineer (Authorized Signature)
APPROVED:
By: Quert /c r
DIGITALLY
SIGNEP
L4(31
Date
4/15/2024
Owner (Authorized Signature) Date
ACCEPTED: ��
By: q/( d`C)'91
Con`t •actor (Authorized Signature) Date
ALO FAA AIP 3-19-0094-048
CO-2 Project No — 60675091
2