HomeMy WebLinkAboutLodge Construction - CO #1 - Pave ARFF Parking Lot, Project 3-19-0094-055 - 4.15.2024CHANGE ORDER NO. 1 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Project: AARF Station Parking Area and Roadway Access Owner's Contract No. FAA AIP Project No. 3-19-0094-055 (CARES) Contractor: Lodge Construction, Inc Date of Contract Start: September 18, 2023 Date: December 28, 2023 You are directed to make the following changes in the Contract Documents. Description: ITEM NO. DESCRIPTION UNIT UNIT BID PRICE CHANGE ORDER CHANGE ORDER AMOUNT NO. 1 1 EXCAVATION, CLASS 13, WASTE CY $ 13.00 30.0 $ 390.00 2 TOPSOIL, FURNISH AND SPREAD CY $ 50.00 35.0 $ 1,750.00 3 MODIFIED SUBBASE CY $ 55.00 30.0 $ 1,650.00 4 STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN. SY $ 77.00 20.0 $ 1,540.00 8 SIDEWALK, P.C. CONCRETE, 4 IN. SY $ 150.00 (18.0) $ (2,700.00) 14 SODDING SY $ 265.00 (11.0) $ (2,915.00) 15 WATERING FOR SOD, SPECIAL DITCH CONTROL, OR SLOPE PROTECTION GAL $ 0.37 (6,600.0) $ (2,442.00) 16 GRATE INTAKE SEDIMENT FILTER BAG EA $ 315.00 (2.0) $ (630.00) 17 EA $ 5.00 (2.0) $ (10.00) MAINTENANCE OF GRATE INTAKE SEDIMENET FILTER BAG 18 REMOVAL OF GRATE INTAKE SEDIMENT FILTER BAG EA $ 160.00 (2.0) $ (320.00) 20 EA $ 300.00 (1.0) $ (300.00) MOBILIZATIONS, EMERGENCY EROSION CONTROL 1-1 SQ $ 30.00 34.0 $ 1,020.00 TEMPORARY HYOROMULCH 1-2 SEED/FERTILIZE/HYDROMULCH (TYPE 1) SQ $ 85.00 34.0 $ 2,890.00 TOTALS $ (77.00) Reason for Change Order: 1 — Extra quantity for subgrade patch. 2 — Quantity adjusted based on field measurements 3 — Extra quantity for subgrade patch. 4 —Extra quantity for pavement that was added to project. 8 — Item was removed from the project. 14 — Item was removed from the project. 15 — Item was removed from the project. 16 — Quantity adjusted based on field measurements. 17 — Quantity adjusted based on field measurements. 18 — Quantity adjusted based on field measurements. 20 — Quantity adjusted based on field measurements. 1-1 — Item was added to temporary mulch disturbed areas over the winter. 1-2 — Item was added in replacement of the sodding item. ALO FAA AIP 3-19-0094-055 CO-1 Project No — 60675091 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 166,069.00 Original: Previous C.O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD): This C.O. (ADD): $ (77.00) This C.O. (ADD): Contract Price with all REVISED: approved Change Orders: $ 165,992.00 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar atnount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: Engineer (Authorized Signature) APPROVED: By: QuerzWz 9-(arl< Owner (Authorized Signature) ACCEPTED: 13y:� ontractor (Authorized Signature) • Date 0'4'o3) Date 4/15/2024 Date 01/03/2024 ALO FAA Al? 3-19-0094-055 CO-1 Project No — 60675091 2