HomeMy WebLinkAboutLodge Construction - CO #1 - Pave ARFF Parking Lot, Project 3-19-0094-055 - 4.15.2024CHANGE ORDER NO. 1
Owner: Waterloo Regional Airport, City of Waterloo, Iowa
Project: AARF Station Parking Area and Roadway Access
Owner's Contract No. FAA AIP Project No. 3-19-0094-055 (CARES)
Contractor: Lodge Construction, Inc
Date of Contract Start: September 18, 2023
Date: December 28, 2023
You are directed to make the following changes in the Contract Documents. Description:
ITEM NO.
DESCRIPTION
UNIT
UNIT BID
PRICE
CHANGE ORDER
CHANGE ORDER
AMOUNT
NO. 1
1
EXCAVATION, CLASS 13, WASTE
CY
$ 13.00
30.0
$ 390.00
2
TOPSOIL, FURNISH AND SPREAD
CY
$ 50.00
35.0
$ 1,750.00
3
MODIFIED SUBBASE
CY
$ 55.00
30.0
$ 1,650.00
4
STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE
PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN.
SY
$ 77.00
20.0
$ 1,540.00
8
SIDEWALK, P.C. CONCRETE, 4 IN.
SY
$ 150.00
(18.0)
$ (2,700.00)
14
SODDING
SY
$ 265.00
(11.0)
$ (2,915.00)
15
WATERING FOR SOD, SPECIAL DITCH CONTROL, OR SLOPE
PROTECTION
GAL
$ 0.37
(6,600.0)
$ (2,442.00)
16
GRATE INTAKE SEDIMENT FILTER BAG
EA
$ 315.00
(2.0)
$ (630.00)
17
EA
$ 5.00
(2.0)
$ (10.00)
MAINTENANCE OF GRATE INTAKE SEDIMENET FILTER BAG
18
REMOVAL OF GRATE INTAKE SEDIMENT FILTER BAG
EA
$ 160.00
(2.0)
$ (320.00)
20
EA
$ 300.00
(1.0)
$ (300.00)
MOBILIZATIONS, EMERGENCY EROSION CONTROL
1-1
SQ
$ 30.00
34.0
$ 1,020.00
TEMPORARY HYOROMULCH
1-2
SEED/FERTILIZE/HYDROMULCH (TYPE 1)
SQ
$ 85.00
34.0
$ 2,890.00
TOTALS
$ (77.00)
Reason for Change Order:
1 — Extra quantity for subgrade patch.
2 — Quantity adjusted based on field measurements
3 — Extra quantity for subgrade patch.
4 —Extra quantity for pavement that was added to project.
8 — Item was removed from the project.
14 — Item was removed from the project.
15 — Item was removed from the project.
16 — Quantity adjusted based on field measurements.
17 — Quantity adjusted based on field measurements.
18 — Quantity adjusted based on field measurements.
20 — Quantity adjusted based on field measurements.
1-1 — Item was added to temporary mulch disturbed areas over the winter.
1-2 — Item was added in replacement of the sodding item.
ALO FAA AIP 3-19-0094-055
CO-1 Project No — 60675091
1
CONTRACT PRICE
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $ 166,069.00 Original:
Previous C.O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD):
This C.O. (ADD): $ (77.00) This C.O. (ADD):
Contract Price with all REVISED:
approved Change Orders: $ 165,992.00
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar atnount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By:
Engineer (Authorized Signature)
APPROVED:
By: QuerzWz 9-(arl<
Owner (Authorized Signature)
ACCEPTED:
13y:�
ontractor (Authorized Signature) • Date
0'4'o3)
Date
4/15/2024
Date
01/03/2024
ALO FAA Al? 3-19-0094-055 CO-1 Project No — 60675091
2